Sentences Generator
And
Your saved sentences

No sentences have been saved yet

"scrammed" Antonyms

16 Sentences With "scrammed"

How to use scrammed in a sentence? Find typical usage patterns (collocations)/phrases/context for "scrammed" and check conjugation/comparative form for "scrammed". Mastering all the usages of "scrammed" from sentence examples published by news publications.

Yola grabbed up the sleeping Golden Cow, and we yotta scrammed.
By Sunday, we're told the noises had stopped ... so the fam figured whatever was in there had gotten out and scrammed.
NRC Renews Operating Licenses of Limerick Nuclear Plant for an Additional 20 Years. U. S. Nuclear Regulatory Commission, October 20, 2014. Retrieved October 28, 2014. Unit 2 of the station was scrammed from 100% power to a shutdown on June 1, 2016, at 9 am.
The match soon ended up by the broadcast table as staff scrammed to safety. Sting snapped on the Scorpion Deathlock on Roode on the table, where Roode tapped out. Moreover, the fall would not be sanctioned since the submission was not taking place in the ring. Sting, who released the hold, inexplicably thought he had won.
Experimenters produced bursts of gamma rays and neutrons by assembling Godiva I's three parts and dropping a burst rod through the center. This image shows it in the safe, scrammed, state. The Lady Godiva device was an unshielded, pulsed nuclear reactor originally situated at the Los Alamos National Laboratory (LANL), near Santa Fe, New Mexico. It was one of a number of criticality devices within Technical Area 18 (TA-18).
Consumers Energy had previously announced that Big Rock Point's operating license would not be renewed when it expired on May 31, 2000. However, economics proved in January 1997 that it was not feasible to keep Big Rock Point running to the license's expiration date. The reactor was scrammed for the last time on at 10:33 a.m. EDT on August 29, 1997, 35 years to the day after its license had been issued.
Unit 1 before the explosion. The joint can be seen between the lower concrete building and upper lighter cladding which was blown away in the explosion. Unit 1 water levels and reactor pressures from 11 to 14 March On 11 March at 14:46 JST, in response to the earthquake, TEPCO successfully scrammed the reactor in Unit 1, shutting down all power-producing nuclear fission chain reactions. Evacuated workers reported violent shaking and burst pipes within the reactor building.
The control team performed a partial emergency ballast tank blow and safely surfaced the boat, and the engineering team safely scrammed (emergency shutdown) the reactor plant to prevent damage. Houston underwent an extensive overhaul at Puget Sound Naval Shipyard in Bremerton, WA, commencing September 2001. The upgrades included a reactor refueling and instrumentation upgrade, as well as navigation, fire control and sonar upgrades. In December 2004, Houston departed PSNS for her new homeport of Apra Harbor, Guam.
Schools along the coast of Louisiana including Nicholls State University and Tulane were suspended in anticipation of the hurricane. In Jackson, Mississippi, a federal disaster office was opened to coordinate preparation and relief efforts for Mississippi. The United States Atomic Energy Commission delayed a detonation of a nuclear bomb in the Tatum Salt Dome near Hattiesburg. The United States Navy scrammed planes from its air stations in Meridian, Mississippi and New Orleans, Louisiana in anticipation of Hilda.
The reactor was undamaged, but there was extensive damage to the test car and the instrumentation, resulting in the test being postponed for a month. A second attempt on 6 December was aborted when it was discovered that many of the diagnostic thermocouples had been installed backward. Finally, on 7 December, the test got under way. It was intended to run the engine at 270 MW for 300 seconds, but the test was scrammed after only 36 seconds at 225 MW because hydrogen fires started to appear.
A Khokandi (Kokandi) who used a rifle and sword was the champion of Jahangir while a Calmac (Kalmyk) archer was the champion of the Chinese, the Calmac killed the Khokandi with an arrow and the two armies then confronted each other in battle, the Chinese army butchering Jahangir's army which tried to flee from the scene. Jahangir scrammed and hid out but was turned over to the Chinese by the Kyrgyz and he was tortured and put to death, Yusuf, Jahangir's brother, invaded the Qing in 1830 and besieged Kashgar.
The third unit of Leningrad NPP has been stopped, Rosenergoatom, 28 August 2009 According to the automated radiation control system, the radiation situation at the plant and in its monitoring zone was normal. The plant's management refuted rumors of an accident and stated that the third unit was stopped for a "short-term unscheduled maintenance", with a restart scheduled for 31 August 2009. Leningrad NPP refutes rumors about accident, Rosenergoatom, 28 August 2009 On 19 December 2015, unit 2 was stopped (scrammed) due to a broken steam pipe. No radioactively contaminated material was released.
On 6 September 2006 the Russian Victor III-class submarine Daniil Moskovsky suffered a fire which resulted in the deaths of two crewmen (a warrant officer and a sailor). At the time of the incident the submarine was anchored off the Rybachiy peninsula, on Russia's north coast near the border with Norway. The fire was extinguished with no damage to the reactor (which had been scrammed as a precaution) and the submarine was towed to a base at Vidyayevo. The incident was reported as being caused by an electrical fire in the vessel's wiring.
Sceptre has suffered several severe accidents in her career. On 23 May 1981 she collided with a Soviet submarine (K-211) and her reactor's protection systems would have performed an automatic emergency shutdown (scrammed the reactor), but her captain ordered the safety mechanisms overridden (battleshort enabled). The crew were told to say that they had hit an iceberg. Much of Sceptres forward outer casing was torn away; there was damage to the fin with the bridge no longer there; and the propeller of the Russian boat had cut into the pressure hull.
In the early 1980s Sceptre collided with a Soviet submarine and her reactor's protection systems would have performed an automatic emergency shutdown (scrammed the reactor), but her captain ordered the safety mechanisms overridden (battleshort enabled). The crew were told to say that they had hit an iceberg. This incident was disclosed when David Forghan, Sceptres former weapons officer, gave a television interview which was broadcast on 19 September 1991. The Soviet submarine collided with was probably K-211 Petropavlovsk-Kamchatsky of the Delta III class, which on 23 May 1981 collided with an unknown submarine, identified at the time as an unknown American .
On 7 April 1989, while under the command of Captain 1st Rank Evgeny Vanin and running submerged at a depth of about southwest of Bear Island (Norway),Gary Weir and Walter Boyne, "Rising Tide", New York, NY: Basic Books,(2003) fire broke out in an engineering compartment due to a short circuit, and even though watertight doors were shut, the resulting fire spread through bulkhead cable penetrations. The reactor scrammed and propulsion was lost. Electrical problems spread as cables burned through, and control of the boat was threatened. An emergency ballast tank blow was performed and the submarine surfaced eleven minutes after the fire began.

No results under this filter, show 16 sentences.

Copyright © 2024 RandomSentenceGen.com All rights reserved.