Sentences Generator
And
Your saved sentences

No sentences have been saved yet

"repower" Definitions
  1. to provide again or anew with power

108 Sentences With "repower"

How to use repower in a sentence? Find typical usage patterns (collocations)/phrases/context for "repower" and check conjugation/comparative form for "repower". Mastering all the usages of "repower" from sentence examples published by news publications.

Putin achieved what the Soviets could not by weaponizing refugees rather than threatening repower.
"To repower the world, we need to expand a lot of things to a large scale," Professor Jacobson told me.
Siemens hailed the "landmark" preliminary agreement to repower Iraq and promised the alliance will create tens of thousands of jobs.
"They decide on the total cost of ownership," John Rapaport, a co-founder of Repower, a consultant to truck fleet owners, tells Axios.
"It appears the federal emergency response is focused on diesel to repower the island," Marco Krapels, co-founder of Empowered by Light, said in a statement.
Her mother, Julia "Miriam" Rodriguez, stayed with Natalio while Lourdes rushed to restart the generator, which had run out of gas, and repower the breathing machine.
Gamesa said on Wednesday it will repower a German wind farm with 4.5 MW turbines, installing three G128 4.5 MW turbines at the Debstedt wind farm for Energiekontor.
It was recently announced that Vattenfall would invest over 200 million euros ($233.06 million) to "repower and expand" the Wieringermeer facility, which will be home to 100 windmills.
Senvion, formerly known as Repower, was owned by Suzlon Energy from 2007 to 2015, when the indebted Indian group sold it on to Centerbridge in a bid to cut debt.
The 90 percent debt and 103 percent equity commitment came from the multi-strategy investment firm Cyrus Investments, which has backed renewable energy projects for years through its investment in RePower Group.
"America must rise to this 21st century challenge with a bold plan to: create jobs; protect workers' rights; repower the economy; rebuild our infrastructure; and reinvest in innovation," according to his proposed strategy.
Your eventual objective: with the help of an AI companion, collect the crystal shards needed to repower your ship, and learn the significance of ocean conservation in preserving our own planet back home.
Senvion, formerly known as Repower, said its sales, on a pro-forma basis, totalled 2.14 billion euros in 2015, and adjusted earnings before interest, tax, depreciation and amortisation (EBITDA) came in at 210.4 million euros.
"Just as it did in the 20th century, America must rise to this 21st century challenge with a bold plan to: create jobs; protect workers' rights; repower the economy; rebuild our infrastructure; and reinvest in innovation," Inslee said Thursday.
" The plan also seeks to answer a key question regarding the fight against climate change: What to do with people who currently work in industries that have a significant impact on the climate, like oil or coal production since the plan would end US coal production by 2030 to "eliminate dangerous pollution and repower our economy with job-creating clean energy.
It is operated and maintained by REpower Systems Inc. and EDF Renewable Services Inc.
Repower generates around two thirds of its energy turnover in trading; in 2018 this came to around 12 terawatt hours.Repower – Core competencies and strategy. Retrieved 2014-05-20. Repower operates on the most important European energy exchanges from trading floors located in Poschiavo (Switzerland) and Milan (Italy).
In 2002 the group embarked on business in Italy. In 2010, Rätia Energie AG was renamed Repower AG.
Repower has long term contracts with nuclear power plants in Switzerland and France, representing an installed capacity of around 50 MW.
In Italy, Repower is one of the biggest suppliers of electricity and gas to small and medium-sized enterprises and public institutions. The company serves around 27,000 customers in Italy with electricity, and supplies an additional 12,000 customers with gas. The range includes green power (VerdeDentro), electric mobility solutions (Palina) and energy efficiency consulting services (eFFettiva).Repower – Sales.
In March 2012 one of the rotor blades snapped, Senvion (formerly REpower), the manufacturers of the turbine, replaced the blades and blamed the issue on a manufacturing fault.
Anaerobic digestion plant at the Telgter Damm. REpower MM82 wind turbines near the Münsterweg. Camping facilities at the Buddenkuhle. For centuries the economy of Ladbergen was based on agriculture.
Repower (until May 2010 Rätia Energie AG) is an international energy utility with its operational headquarters in Poschiavo (Canton Graubünden, Switzerland). The company's history goes back more than 100 years, with the foundation in 1904 of Kraftwerke Brusio AG. Its key markets include Switzerland and Italy. The group operates along the entire value chain, from generation and trading to sales. The Repower Group employs 555 people, plus 510 sales agents in Italy and 30 apprentices in Switzerland.
The Shiloh III project went online in early 2012 with fifty REpower 2.05 MW turbines, generating 102.5 MW. The power is sold to Pacific Gas and Electric Company under a 20-year agreement.
The Rock Island had rival builder EMD repower their newest, the #621, but this does not seem to have extended its career greatly. One notable pair on the Milwaukee Road lived charmed lives.
Each of the turbines is a German made REpower MM82 turbines, each sitting on an Australian made 66m tall tower. The farm is operated by eDL Energy Australia, and became operational in December 2005.
REpower turbines to Thornton Bank offshore wind farm expansion Renewable Energy Focus, 26 November 2010. Accessed: 13 October 2011.Thornton Bank Offshore Project Officially Commissioned Renewable Energy World, 2 July 2009. Accessed: 13 October 2011.
Repower has a 61% interest in SET S.p.A. (Milan), which operates the Teverola combined cycle gas power plant in the Italian province of Caserta. This 400 MW installation went into operation at the end of 2006.
Erfahrungen, Probleme, Chancen und Perspektiven, Bad Karlshafen 1996 (Schriften der HAL, Bd. 12), S. 76-119. In 2011 two more powerful wind turbines, type REpower MM92, were built. One is operated by the Energiegenossenschaft Starkenburg eG.
The group sees itself as an asset-based trader, trading electricity, gas and carbon certificates. On the physical side of the business Repower delivers electricity – part of which is generated by Repower itself, part of which is bought in from outside – to wholesale customers, usually via the high-voltage grid. The company also deals in certificates to deliver environmental value- added to larger end-consumers, independently of the grid. At the wholesale level the group delivers standard products such as base, peak and off-peak, as well as profiles.
IPL and enXco announced their plan to build the wind farm in April, 2008. The original plan called for 67 GE 1.5 MW wind turbines. By the time construction started in April 2009, the plan had changed to use REpower 2.0 MW wind turbines instead, with 80m towers. At the time of construction, Hoosier was only the third wind farm in the United States to use REpower wind turbines, after Goodnoe Hills Wind Farm in Goldendale, Washington, and Shiloh Wind Farm Phase II in Birds Landing, California (also constructed by enXco and Mortenson).
Repower has played a significant role in increasing cross-border capacity between northern and southern Europe by building the international Bernina Line (380 kV/220 kV), commissioned in 2005 and transferred to the Swiss national grid operator Swissgrid at the beginning of 2013. In October 2009, Repower joined forces with Edison and the municipality of Tirano to inaugurate the first A/C merchant line in Europe. It runs underground for its entire length between Tirano (Italy) and Campocologno (Switzerland). This 150 kV merchant line increases cross-border transport capacity by 150 MW, helping assure a secure energy supply in Italy and Switzerland.
The work is planned to be undertaken at Progress Rail's Longport site and the first locomotive is expected to be completed in May 2020. The rebuilt locomotives are to be redesignated as .Progress Rail to repower GB Railfreight locomotives - Retrieved 3 April 2019.
The foundations for the REpower turbines were developed and designed by OWEC Tower. Construction of the wind farm was completed on November 16, 2009 after a seven-month construction period. On April 27, 2010 the farm was officially opened and set into commercial operation.
The first phase was built by C-Power and consists of six REpower offshore wind turbines of 5 MW capacity on the Thornton sandbank, at a cost of €153 million.Thorntonbank (Belgium) offshore wind farm 4C . Retrieved: 27 October 2010. It was commissioned in June 2009.
Wind turbine at Windpark Waldhausen The Windpark Waldhausen wind farm began operations in early 2007. It consists of seven REpower MM92 wind turbines with a nameplate capacity of 2 MW each. The hub height of each wind turbine is , with a rotor diameter of .
Below the lake, the river passes the settlements of Brusio and Campocologno before crossing the border into Italy. It flows into the Adda in Tirano, at above sea level. The water of the river and its tributaries is used to power several hydro-electric plants owned by Repower AG.
Repower has its own generation assets in Switzerland, Italy and Germany, producing electricity on the basis of different technologies: hydro, thermal and wind. In 2018 the group's own installations generated around 1.66 TWh of electricity. In addition to this, the company has long term contracts with nuclear power plants in Switzerland and France.
The Massif du Sud Wind Project is a wind project being developed by EDF Énergies Nouvelles and Enbridge. It is located near the villages of Saint- Philémon, Quebec and Saint-Magloire, Quebec. Comprising 75 REpower Systems 2-megawatt wind turbines, at completion the project will achieve a nameplate capacity of 150 MW.
Newland primary school closed 2006, as was later used by the council and community groups. In 2006 planning permission was given for 45 houses on the former Marist college school site. (Developed as Scholar Court.OS Open Data 2016) Croda installed a 2 MW REpower MM92 wind turbine north of its chemical works in .
BZE’s flagship research shows how all sectors of the Australian economy can decarbonise, repower and benefit from the transition to zero emissions. The Zero Carbon Australia plans, which are published and accessible on the BZE website, cover renewable energy and electricity; energy efficient buildings; sustainable transport; agriculture, farming and land use; and industry.
REpower 5 MW wind turbine under construction at Nigg fabrication yard on the Cromarty Firth Scotland's first offshore wind turbine was placed near the Beatrice Oil Field, off the east coast in the Moray Firth, North Sea, in August 2006. This was the world's largest wind turbine at the time, an REpower 5M, with a maximum output of 5 MW. A second identical turbine joined it and the wind farm began supplying electricity in August 2007. As of February 2010, Beatrice Wind Farm is the deepest and northernmost offshore wind installation in the world. This was the first time such large offshore wind turbines had been tested, and the first time any wind turbine generators have been assembled in such deep (44 metres) water.
EnXco started commercial operation of the 150-megawatt Shiloh II wind farm in February 2009 on of land. The wind farm has 75 REpower MM92 turbines, each generating up to 2 megawatts. It produces enough energy for 74,000 homes. EnXco has a 20-year contract to sell the power to Pacific Gas and Electric Co.
In Italy the group operates a wind farm in Corleto Perticara (9.3 MW), and in Lucera (26 MW) and holds an interest in another wind farm in Giunchetto on Sicily (Repower's interest: 11.6 MW). In Germany the Repower subsidiary Repartner Produktions AG owns two wind farms, in Prettin (10 MW) and Lübbenau (16 MW).
Construction of the alpha ventus substation started in July 2008. On July 15, 2009, the first wind turbine was installed and the first six turbines delivered by Multibrid went operational in August 2009. Installation of another six turbines delivered by REpower started in September 2009. The foundations for the Multibrid turbines were so called tripods designed by OWT.
At the time when Electro was losing control of his abilities, she was visited by him. When attempting to kiss Electro, Francine died from electrocution. Jackal later revived her as a clone, lacking her piercings and tattoos. She was summoned by the new Jackal to help persuade Electro to go through with the procedure that would repower him.
Hindustan Unilever has set up a factory in Boloor which produces mainly Rin detergents. Suzlon has established its wind energy generation plant at Padubidri near Mangalore. Suzlon Energy plans to manufacture REpower wind turbines at its plant near Mangalore. Bakery and confectionery industries are also found in Mangalore; Gyp-gyp-gy and Narans are a few among them.
Callisto was later reunited with Marrow as members of X-Cell, a group of mutants who hold the government responsible for their power loss. When Quicksilver offered to repower its members, she warned Marrow about what happens to non-Inhumans who gain power from the Terrigen Mist. She and Marrow later fled into the sewers to escape the government.
This drove Enterprise off the run after six months, and in February 1862, Captain W.A. Mowat paid $60,000 to buy her for the Hudson's Bay Company. The Anderson's owners bought the Enterprise's walking-beam engine and used it to repower their boat. Another would-be competitor, the Josie McNear, similarly faltered in her efforts to compete with the Anderson.
The Vijayanta was first made in the UK before production moved to India. Indian production got underway, allowing UK production to cease. The Vijayanta was to be phased out by the Indian Army by 2008 (the decision to phase out 296 "pre Mark 1A tanks" was already taken in 1997). In 1997 the plan to repower the Vijayanta was shelved.
Repower is the leading supplier of electricity in Southeast Switzerland. Its customers range from private households to industrial, commercial and public sector consumers and downstream municipal utilities. Repower's supply area includes municipalities in the Engadine, Prättigau, Rhine Valley and Surselva areas of Graubünden. Via municipal utilities it supplies customers in the Upper Engadine, Münstertal, Poschiavo Valley, Rhine Valley and Surselva.
Up until the Westereems Wind Park was commissioned the largest onshore wind farm was the Princess Alexia Windpark in Zeewolde (122MW), consisting of 36 REpower turbines and a 3.2MW/33MWh battery storage power station of BMW i3 batteries. Other large wind farms are located in Delfzijl-zuid (43 MW), Lelystad (46 MW), Terneuzen, (Koegorspolder, 44 MW), and Biddinghuizen (WP Kubbeweg, 34 MW).
In 2012 100 young people walked 328 km over 15 days from Port Augusta to Adelaide. This major event, organised by the AYCC, was part of the wider Repower Port Augusta campaign, pushing for investment in Australia's first concentrated solar thermal plant in Port Augusta. The event gained significant national media and political attention. The chief spokesperson for the project was Daniel Spencer.
The Bay Area Air Quality Management District’s Carl Moyer Program provides grants to public and private entities to reduce emissions of nitrogen oxides, reactive organic gases and particulate matter from existing heavy-duty engines by repowering, retrofitting, or replacing them. The Carl Moyer Program can be used for engine repower and retrofit projects and components of the program such as the Off-Road Equipment Replacement Program (ERP)Bay Area Air Quality Management District, , Bay Area Air Quality Management District, Retrieved March 10, 2010 and the Voucher Incentive Program (VIP)Bay Area Air Quality Management District, , Bay Area Air Quality Management District, Retrieved March 10, 2010 can be used for equipment replacement projects. Engine repowering is when an existing engine is replaced with a new one. The time it takes to repower an engine varies depending on the size and application of the engine.
2, #8 (April 2008). Marvel Comics. After Stane reactivates Mulholland Black's powers to the point of them going out of control and depowering the rest of The Order, Henry Hellrung was forced to kill Mulholland. The villains defeated, Tony Stark offers to repower the surviving members of The Order permanently and turn the team into a military operation rather than a public relations showcase.
Hoosier Wind Farm is a wind farm in Benton County, Indiana. It consists of 53 REpower 2 MW wind turbines, for a total nameplate capacity of 106 MW. The enXco subsidiary of EDF Energies Nouvelles built the wind farm, with Mortenson Construction's Renewable Energy Group as the subcontractor. Indianapolis Power & Light (IPL) has a 20-year contract to purchase and distribute the wind farm's output.
GNER, CrossCountry, Network Rail and Grand Central also decided to repower their fleets with MTUs."GNER confirms German built MTU engines for HST fleet rebuild" Rail issue 544 19 July 2006 page 12"Brush wins XC Class 43 HST overhaul deal" Rail issue 586 27 February 2008 page 64 The only operator not to was East Midlands Trains, which opted to replace its Valentas with Paxman VP185s.
Among the four largest energy companies in Switzerland – in addition to Axpo these are Alpiq, BKW and Repower – Axpo was in the medium range with an average of 316 environmental impact points (EIP). The energy from radioactive waste can be recycled.In fact, nuclear waste is a recyclable material, in: welt.de, 11 November 2019, retrieved on 27 April 2020Implications of Partitioning and Transmutation in Radioactive Waste Management, in: iaea.
Nordsee Ost's location in the wind farms of the German Bight Nordsee-Ost offshore wind farm is an offshore wind farm in operation in the eastern part of the North Sea German sector. The project was developed by RWE Innogy, a subsidiary of RWE. The wind farm consists of 48 turbines with a total capacity of 295 MW. The 6.15 MW turbines were provided by REpower. Steel foundations for generators were supplied by Aker Verdal.
Construction work at alpha ventus wind park (July 2009) The application for construction of the wind farm near Borkum was submitted in 1999. The permit was given by the Federal Maritime and Hydrographic Agency in 2001. In 2007, contracts for supplying wind turbines were signed with REpower and Multibrid (later: Areva Wind and Adwen). That same year, a contract for the construction of a subsea cable connection to the German grid was signed.
In 1985, the last full year of operation, the combined electrical output of the three turbines was 8,251 megawatt-hours. The Medicine Bow MOD-2 wind turbine was sold for scrap in 1987. In 2008, the Goodnoe Hills Wind Farm opened on the same site with 47 REpower 2.0 MW wind turbines for a combined nameplate capacity of 94 MW. enXco/Power Holdings owns the wind farm, with PacifiCorp as the power purchaser.
By 2010 the turbines were antiquated; only two-thirds were still in operation. The farm was decommissioned that year in anticipation of replacing the turbines with more efficient modern models. Lalamilo Wind Company was awarded the contract to repower and operate the wind farm. They plan to install five Vestas V47/660 kW turbines that together would have a generating capacity of 3.3 MW. Commercial operation is intended to begin in late 2015 or early 2016.
Thorntonbank Wind Farm, using 5 MW turbines REpower 5M in the North Sea off the coast of Belgium. A wind turbine, or alternatively referred to as a wind energy converter, is a device that converts the wind's kinetic energy into electrical energy. Wind turbines are manufactured in a wide range of vertical and horizontal axis. The smallest turbines are used for applications such as battery charging for auxiliary power for boats or caravans or to power traffic warning signs.
When confronted during a press conference by Fatale over his actions meant to repower mutants and his lying about a Skrull having been responsible, Pietro finally admitted in public that he had been responsible and had tried to avoid facing the consequences; by doing this, he earned his daughter's respect back, and the two reconciled.All-New X-Factor #12. Marvel Comics. Wanda and other heroes and villains experienced a moral inversion during a clash with the Red Onslaught.
Drax Repower is a proposal to modify units 5 and 6 at Drax power station by installing combined cycle gas turbines. Waste heat from the gas turbines will pass to heat recovery steam generators which will generate steam for the existing steam turbines in the respective units. The repowered units are expected to have a total electrical output of 3.6 gigawatts. There is also a proposal to construct two battery storage facilities of 100 MW (sic) each.
Some advocate the system as a candidate for a massive public works project that would stimulate the US economy after the Global financial crisis of 2008. The "Unified Smart Grid" is promoted by Alliance for Climate Protection (Repower America program) and Al Gore. The cost estimate by Al Gore is $400 billion and would be recovered by tariffs on transmission. The need for a national bulk transmission grid is detailed in T. Boone Pickens's energy independence plan.
Senvion S.A. (called REpower Systems SE until 2014) is a German wind turbine manufacturer founded in 2001 in Germany, majority owned by the private equity firm, Centerbridge Partners since April 2015. It was under the ownership of Suzlon, an India wind turbine manufacturer, from 2007 to 2015. With equipment pricing under pressure due to auctions, Senvion filed for insolvency in German courts in early April 2019. Senvion sold its 9 GW European service fleet to Siemens Gamesa in October 2019.
The Wrightspeed Route is a plug and play repower kit for commercial trucks. It is a high-power medium-duty vehicle powertrain that uses electric drive with an onboard power station for efficiency and range, a series hybrid retrofit kit for trucks. The kit includes controls, 200 kW inverter, electric motors, gear box with clutch- less shifting, battery pack, battery management system, and LCD user interface. Medium-duty trucks in the US are defined as vehicles with gross vehicle weights of .
An engine retrofit is when new components, such as catalysts or filters, are added to an existing engine. Engine retrofits typically take a few hours, after which the engine can immediately be put to use. Equipment Replacement projects consist of replacing the entire unit (chassis and engine) with a new, cleaner piece of equipment. The Carl Moyer Program provides funding to five categories of heavy-duty diesel engines: # Agricultural Vehicles and Equipment - Project examples: repower and or retrofit irrigation pumps.
After Chilean Civil War of 1891, the government of President Jorge Montt (1891–1896) carried out a naval acquisitions project to repower the Chilean Navy. The government ordered the construction of cruisers, destroyers, torpedo gunboats and a training ship in the United Kingdom. These ships were ordered in the context of the Argentine–Chilean naval arms race. In 1895, construction began at the British shipyard Laird Brothers, in Birkenhead, of a torpedo gunboat for the Royal Navy to be called HMS Lion.
The permit was subsequently challenged unsuccessfully at the Victorian Civil and Administrative Tribunal (VCAT) in June 2007.Perry v Hepburn SC [2007] VCAT 1309 (27 July 2007) On 28 April 2010 the project signed a contract with REpower Systems for the turnkey construction of the wind farm. The official ground breaking ceremony was held on 8 October 2010 and was officiated by the Hon Gavin Jennings, the Victorian Minister for the Environment at the time. Construction began in November 2010.
It is popular to repower old dams thereby increasing their efficiency and capacity as well as quicker responsiveness on the grid. Where circumstances permit existing dams such as the Russell Dam built in 1985 may be updated with "pump back" facilities for pumped-storage which is useful for peak loads or to support intermittent wind and solar power. Countries with large hydroelectric developments such as Canada and Norway are spending billions to expand their grids to trade with neighboring countries having limited hydro.
Coal Voice, Nov/Dec, 1992, p. 24. Allowances auctioned in March 1993 sold for $122 to $450 per ton,58 Federal Register 27563-27567, May 10, 1993. reducing the windfall from these allowances to $4.4 to $16.2 million. In the interim, owners of one unit retired in 1985, the 119 MWe Des Moines Energy Center, received $93 million in DOE funding for a Clean Coal Technology project to repower with a coal-fired 70 MWe pressurized fluidized-bed combustion unit, bringing it back into production in 1996.
In January 2008 consent was granted to replace the existing nine turbines with seven new ones. Six of these would generate 2.5 MW each, and a seventh larger one would produce 7.58 MW (if it is an Enercon E-126)and be the largest land-based turbine in Europe at tall. As of September 2012, the first new turbine became operational, producing up to 3.4 MW of power (more than the original nine turbines combined). The turbine is a REpower 3.4M104, with a 76 m hub height.
In June 2002, a volunteer group led by PICA president Ted Russell opened the Burgess Aviation Museum to promote the history of aviation at Plum Island and the region. PICA's last president was former National Parachute Champion David "Butch" Crook of Rowley. From 2006 to 2012, Plum Island Aerodrome housed Noyes Enterprises, which restored and sold Cessna L-19 Bird Dog aircraft. During this time, the hangar and facilities were used to repower and modify a large number of Cessna L-19 aircraft for the Royal Canadian Air Cadets.
In 2005 a wind farm consisting of three REpower MM82 wind turbines was erected on the outskirts of Ladbergen.REpower References Each of these MM82 wind turbines has a hub height and rotor diameter giving a total sweep of and an average power capacity of 2.050 kW. The power output is controlled by varying the pitch of the rotor blades which can operate at 8.5–17.1 rpm rotor speed.REpower MM82 brochure Together with the two anaerobic digestion plants that went into operation in 2006, the community - mathematically - can fulfill its energy needs.
Annual yield of domestic renewable electricity by source. Germany's renewable energy sector is among the most innovative and successful worldwide. Enercon, Nordex, REpower Systems, Siemens, and Fuhrländer are wind-power companies based in Germany. Every third solar panel and every second wind rotor in Germany are German, and German turbines and generators used in hydro energy generation are among the most popular worldwide. Nearly 800,000 people work in the German environment technology sector; an estimated 214,000 people work with renewables in Germany, up from 157,000 in 2004, an increase of 36%.
42°15'27.02"N 73°48'35.09"W Today Elco in river shore south Athens NY produces hand crafted replicas of some of its classic launches. The company also still makes electric motors, mainly used to repower sailboats and heavy displacement powerboats as a replacement for diesel engines. Their EP Motors range in power from 1–35 kW, which is the diesel equivalent of 2–70 hp. Elco has also worked on recent projects with Hunter Marine to outfit some of their yachts with Elco motors and a combination of solar panels and wind turbines.
Sause Bros. Ocean TowingSee Sause Bros. Ocean Towing of Portland, Oregon. Sause Bros. soon gave the tug her current name, Titan and repowered her with two 12-cylinder turbo EMD engines, with 3½ to 1 Lufkin gears. Sause has since removed the TITAN from service and maintained her laid up in Coos Bay after removing the EMD engines they had installed previously rather than choosing to rebuild them. After determining it would not be cost-effective to repower a 70-year-old hull the decision was made to dispose of the TITAN.
4 #10 The Lizard worked with the Jackal on a procedure that would repower Electro. The first time it was interrupted, the Lizard was present when the Jackal summoned a somehow-revived Francine appears in order to convince Maxwell to go through with it. The second time it was interrupted was when Martha Connors informed everyone present about a fire in Edmond, Oklahoma that neither of them was responsible for.Amazing Spider-Man vol. 4 #16 While escaping from New U Technologies, Spider-Man and Spider-Woman of Earth-65 quickly incapacitate the Lizard.
Daniel Spencer has red hair. Daniel Spencer is a young South Australian climate activist, originally from Renmark in the state's Riverland region. He has held prominent leadership roles in the Australian Youth Climate Coalition, the Repower Port Augusta campaign and the Walk for Solar. His work has focused on promoting a vision and building community support for the replacement of the coal-fired power stations at Port Augusta with a concentrated solar- thermal power generation alternative.Spencer, Daniel "Meet Australian climate activist Daniel Spencer" New Internationalist Blog, Australia (2012-10-26). Retrieved 2014-04-03.
However, the rest of the species have been unable to find a way to return to Spacetime Four, and only they would be able to provide the humans with a spacecraft to return to Earth. Low offers to travel to Spacetime Six to show the aliens how to return, but this requires them to repower the portal that was used. They are able to retrieve two life crystals from a machine that generates them, but Low and Brink fight over the crystals, and Brink falls to his death. During the process of opening the portal, Robbins is killed.
GB Railfreight to repower GB Railfreight locomotives Railway Gazette International 3 April 2019 Initially 10 will be rebuilt, with an option for a further six.Class 56 donor locos for Class 69s revealed by GBRf Railways Illustrated January 2020 page 12 GBRFs engineering director, Bob Tiller stated that a complete rebuild and re-engine of each locomotive would be cheaper than buying brand new locomotives and shipping them in from abroad. Tiller also highlighted the EMD 710 engines' environmentally friendly emission status compared with some older locomotives, including the Class 66, which at the time of the announcement were over 20 years old.
All 31 were included in the sale of V/Line Freight to Freight Victoria in March 1999. On 26 November 1999, G517 and G518 were destroyed in a head-on collision at Ararat when an eastbound grain train collided with a stationary ballast train at 70 km/h. Freight Australia commenced a program of engine upgrades purchasing new engines for some of the G class, with the old engines being used to repower X class locomotives, later recoded the XR class.Hewison, P, Kimpton, R. (2002) Freight Australia's Rollingstock Initiatives, Conference on Railway Engineering, Wollongong, 10–13 November 2002, pp.
As of June 2017, Good Energy had two wind farms (at Delabole, north Cornwall, and Hampole, South Yorkshire) and eight solar farms. Delabole wind farm was the first commercial wind farm in the UK. In December 2008, planning approval was granted to Good Energy in order to refurbish (repower) the wind farm. The development was financed by an £11.8 million package including a £9.6 million loan from the Co-operative Bank and £2.2 million equity from Good Energy Group's own resources. In August 2010 the ten original turbines were replaced by four more powerful turbines and in February 2011 Delabole was officially reopened.
Hepburn Wind Farm The Hepburn Wind Project is a wind farm built and owned by Hepburn Wind, a community co-operative, and supported by the Victorian Government. The location of the project is Leonards Hill, south of Daylesford, Victoria, north-west of Melbourne, Victoria. It comprises two individual 2.05 MW wind turbines supplied by REpower System AG which are projected to produce enough energy for 2,300 households, almost as many houses are in the twin- towns of Daylesford and Hepburn Springs.Victorian community goes it alone on wind farm The project is the first community-owned wind farm in Australia.
Langley Park Wind Farm is a wind farm near Langley Park, County Durham, England. It was developed by EDF Energy and is operated by Cumbria Wind Farms, the farm has a nameplate capacity of 8.2 MW, containing four REpower Systems' MM82 turbines each rated at 2.05MW. In 2008 EDF accepted that it had failed to check the impact of the turbines on digital television reception, after residents of villages where the turbines lay on a line-of-sight to the local TV transmitter complained of a loss of signal strength and severe Freeview Digital Services disruption, particularly when the turbine blades rotate.
The San Francisco Hornblower Hybrid is a catamaran, with a fully enclosed main deck, and covered roof deck. In 2008 the vessel was acquired by Alcatraz Cruises, a subsidiary of Hornblower Cruises. The vessel, which was previously a commercial diving boat, underwent a retrofit, repower and refurbishment operation, at a cost of USD 4 million. In addition to its main power train, which consists of Tier 2 marine diesel engines, the Hornblower Hybrid uses power generated by two ten-foot-tall twisted Savonius wind turbines and a photovoltaic solar array covering the awning on the top deck.
Vahrenholt had studied Chemistry in Münster and started his professional career at the federal Umweltbundesamt (environmental protection agency) in Berlin and the Ministry for Environment of Hesse. From 1984 till 1990 he was in a leading role in Hamburg, first as Staatsrat for environment, 1990 to 1991 for the administral Senatskanzlei, and the Umweltsenator (senator for the environment) in Hamburg from 1991 to 1997. In 1998 he entered the energy industry and until 2001 was on the Board of Deutsche Shell AG, a Shell subsidiary. In 2001 he moved to post of CEO of the wind turbine company REpower Systems AG and remained there until 2007.
Former campaigns from the Alliance include the bipartisan "We" campaign, launched in 2008. The campaign, which included an advertisement called "We Can Solve It" featuring Nancy Pelosi and Newt Gingrich jointly calling for a response to climate change, was created to prompt public action against climate change on a national and international level. The "We" campaign included partnerships with the Girl Scouts of the United States of America, the United Steelworkers of America and the National Audubon Society. The same year, the Alliance launched the "Repower America" campaign to support Gore's directive to shift American homes to 100 percent clean energy within 10 years.
For more than 100 years, Repower has been one of the largest providers of electricity in Switzerland. Founded in 1904 as Kraftwerke Brusio AG, the same year the company started construction of its first power plant − at the time the largest high-pressure hydropower installation in Europe − in Campocologno in the Poschiavo region of Canton Graubünden, Switzerland. Proximity to the Italian border precipitated the company's involvement in international projects and business activities. In 2000, Kraftwerke Brusio AG (Poschiavo), AG Bündner Kraftwerke (Klosters) and Rhätische Werke für Elektrizität AG (Thusis) merged to create the Rätia Energie AG group, which was subsequently joined by aurax ag (Ilanz) in 2004.
Rendel has constructed an android named Cytro, who's prime directive is to help him in his plans to take control of the contaminated jungle and destroy Max in the process. Accidentally, the programming of Cytro is scrambled and for a couple of hours thinks he must protect Max instead of fighting him. However, he is aware of the malfunction, and constantly mentions how much time is left until he will be "authorized" again to kill Max. Thanks to the information retrieved by Iago, Dr. Rendel locates Fire Elementor immediately after the battle in Dark Rival, and taking advantage of his unconsciousness, takes him prisoner to perform new experiments to repower him.
A 37 km 150 kV undersea cable connects the Thorntonbank Wind Farm to the shore.Final kick off for the 300 MW wind farm in front of the Belgian coast The first phase of what will ultimately be a 325 MW wind farm was completed in September 2008. The six REpower 5 MW turbines, which were installed on concrete gravity foundations, were linked to the Belgian power grid, giving a total rated capacity of 30 MW for the first stage. The full story of the design, engineering, construction and installation of the Thorntonbank Wind Farm (first phase) is told in an illustrated book that was published in November 2010.
According to its developers, the tower's construction, which took 15 years to plan and execute, was a financial success, with its valuation based on lease rates exceeding the construction cost by CHF 110 million. The tower and its two companion buildings, Cubus and Diagonal, are used primarily as office buildings. As of its opening in December 2011, the tower hosts the "Clouds" restaurant on its top floor, a conference center, the Hotel Rivington & Sons on the ground floor, as well as the offices of Deutsche Bank Schweiz, Homburger AG, Transammonia, Korn/Ferry International, Citibank Switzerland, Infosys, Repower AG, Ernst & Young, Zürcher Kantonalbank and consulting companies.
While Emily, Miskit and Leon travel to Demon Head's Mountain, Balan (a bull) introduces Navin to a crew of humanoid animals called the Resistance, who help them repower the robots in the house after they shut down to prevent the elves from gathering information. Emily, Leon and Miskit arrive at their destination and are encountered by the Gadobah trees, which are future-telling trees that bear the fruit that can cure Emily's mother. Using her stone's powers, she finds a non-poisonous one and they set off to reunite with Navin and the Resistance. They are stopped by Luger, an elf stonekeeper, who is then attacked by Trellis.
Although many Zentraedi had been peacefully assimilated into Earth's surviving human population, many others were simply unable to overcome their natural desire to fight and destroy and they turn to Khyron as their leader.Robotech, Episode 31: Khyron's Revenge (summary available at Episode 31: Khyron's Revenge at Robotech.com) In an effort to get their hands on a piece of equipment to repower their warship, Khyron and Azonia kidnapp Lin Minmei and her cousin Lin Kyle and attempt to ransom them for the SDF-1. The plan however is foiled when a rescue operation led by Rick Hunter, dubbed Operation Star Saver, is able to free both Minmei and Kyle.
Khyron's forces continue to grow in size as more and more disaffected Zentraedi join him and other Zentraedi rebellions start breaking out all over the world, straining the United Earth Government's forces. Khyron restyles himself as Khyron the Destroyer and takes advantage of these circumstances by launching an assault on Macross City managing to steal a protoculture storage matrix. As his forces escape with the matrix, Khyron detonates numerous bombs hidden within the city causing massive damage and inflicting numerous civilian casualties which soon stream into overflowing hospitals. Khryon uses the protoculture matrix to repower his warship but he decides that he cannot leave earth until the SDF-1 is destroyed.
Renewable energy world In the year 2006, Suzlon reached a definitive agreement for acquisition of Belgium firm Hansen Transmissions, specializing in gearboxes for wind turbines, for $565 million. In 2007, the company purchased a controlling stake in Germany's Senvion (then operating as REpower Systems) which valued the firm at US$1.6 billion. In June 2007, Suzlon had signed a contract with Edison Mission Energy (EME) of US for delivery of 150 wind turbines of 2.1 megawatts in 2008 and a similar volume to be delivered in 2009. EME had an option not to purchase the 150 turbines due to be delivered in 2009, which it has chosen to exercise.
Flowers bloom in spring at Schlosspark Herrenhausen, Hannover, Germany. (2011) By January 2011, around 17% of electricity, 8% of heat and 6% of fuel used in Germany was generated from renewable sources, reducing Germany’s energy imports (DENA, 2011).German Renewable Energies Agency (Deutsche Erneuerbare Energien Agentur, DENA), January 2011, DENA By early 2011, the renewable energy industry employed more than 350,000 people in Germany, up from 30,000 people in 1998. Germany hosted businesses like Enercon, Nordex and REpower Systems in the wind industry and Q-Cells, Schott Solar and SolarWorld in the solar industry. Germany was one of the world’s three major renewable energy economies (Renewable Energy Network 21, 2011).
The transformer station Dolwin Beta being transported Gode Wind's location in the wind farms of the German Bight The combined capacity of the three projects will be up to 900 MW. Gode 1 has a capacity of 332 MW, Gode 2 has a capacity of 252 MW, and Gode 3 will have a capacity of 316 MW. Originally REpower Systems was to supply 54 6-MW turbines for Gode 1 and Vestas was to supply 84 3-MWturbines for Gode 2. These deals were re-tendered by Ørsted S, which has contracted 154 direct- drive 6MW turbines from Siemens Wind Power.Ben Miller. "Gunfleet Sands III officially opened " Windpower Offshore, 12 September 2013.
This campaign brought together diverse groups including the Australian Youth Climate Coalition under the name Repower Port Augusta. On 11 June 2015, Alinta Energy announced its intent to permanently close the power station by March 2018, along with the related Northern Power Station, and the Leigh Creek coal mine that supplied them both with fuel. On 30 July 2015, Alinta Energy announced it was bringing the closure dates of all three facilities forward by 12 months, and intended to no longer operate them past March 2017 and could shut them down as early as March 2016. On 7 October 2015, Alinta Energy announced the permanent closure of Northern and Playford B around 31 March 2016, effectively meaning that Playford B would never re-open.
Shiloh IV became operational in December 2012, and like Shiloh III, consists of fifty REpower 2.05 MW turbines, generating 102.5 MW. The power is sold to Pacific Gas and Electric Company under a 25-year purchase agreement. Shiloh IV involved removal of about 235 existing Kenetech 100 kW turbines, originally installed in 1989 with a capacity of 25 MW. This wind farm has a permit from the U.S. Fish and Wildlife Service which allows for the death of 5 eagles per 5 years because of a collision with a turbine, without facing the penalties outlined by the Bald and Golden Eagle Protection Act. The permit outlines the requirements of the project owner to minimize and offset those eagle deaths with the goal of no- net loss to the eagle population.
The high court is vested with general powers of supervision and revision over all districts courts and courts of resident Magistrates in the exercise of their appellate jurisdiction on matters originating from primary courts as well as in exercising their original jurisdiction. Where in exercise of such repower the high court may either call to inspect the record of any proceedings, direct any district court to call for and inspect the records of any proceedings in a primary court, or it can itself revise any such proceedings. Under the magistrate courts act if in any proceedings of a civil nature where it appears that there has been an error material to the merits of the case involving injustices, the high court may revise the proceedings and make such decision as it sees fit..
Unlike land-based wind turbines, where assembly occurs on site, offshore wind turbines have part of their assembly done in a shipyard, and then construction barges transport the tower sections, rotors, and nacelles to the site for final erection and assembly. As a result of this, in late 2007, the 'Goliath' gantry crane was re-commissioned, having been moth-balled in 2003 due to the lack of heavy-lifting work at the yard. In June 2008, assembly work at the Belfast yard was underway on 60 Vestas V90-3MW wind turbines for the Robin Rigg Wind Farm. This was the second offshore wind farm assembled by the company for Vestas having completed the logistics for the Barrow Offshore Wind Farm in 2006. In August 2011 Harland and Wolff completed the logistics for the Ormonde Wind Farm which consisted of 30 REpower 5MW turbines.
The engine is famous for the "Valenta Scream" on starting from rest, a distinctive high-pitched whine caused by the engine's turbocharger. In 1977, the Valenta received the Queen's Awards for Enterprise."Suppliers" Railway Gazette International May 1977 page 171 In 1985, four (43167-43170) were fitted with Mirrlees MB190 engines."HSTs to have Mirrlees engines" Railway Gazette International December 1985 page 899 Beginning in 1995, a small number were fitted with Paxman VP185 engines, however the majority retained Valentas."Paxman wins order for seven 12VP185 engines" Rail issue 255 21 June 1995 page 9 In May 2005, First Great Western had Brush Traction fit two with MTU 16V4000 engines."Life-extended Angel HST rolls out of Brush for £1.5m trial" Rail issue 514 25 May 2005 Judged a success, as part of a project to extend the lives of the HSTs, First Great Western decided to repower its entire fleet.
The Mount Mercer Wind Farm is located at Mount Mercer approximately 30 kilometres south of Ballarat in Western Victoria on 2600ha. The wind farm consists of 64 REpower MM92 wind turbines, giving a total installed capacity of 131 MW. It is expected to generate approximately 395,000 megawatt hours (MWh) of electricity each year which could power approximately 74,000 households and result in a reduction of some 510,000 tonnes of carbon dioxide. Mount Mercer wind farm viewed from Colac Ballarat Road Construction was to commence in September 2009 under the management of WestWind Energy, however the project changed hands to Meridian Energy in the middle of 2009 and construction was delayed several years with Meridian Energy citing the financial crisis of 2007–2008 as the cause. Further delays were caused by having to re-design the backhaul to the national grid and thus having to renegotiate easement agreements with local land owners.
In June 2018, GB Railfreight purchased sixteen locomotives from UK Rail Leasing, many of which had been out of use for a number of years.GBRf buys 16 Class 56s from UK Rail Leasing The Railway Magazine issue 1408 July 2018 page 94GBRf purchases 56s from UK Rail Leasing Today's Railways UK issue 200 August 2018 page 62 Additionally, 56 106 was acquired in an incomplete state as a source of spares and 56 128 from CF Booth metal recyclers. In April 2019, GB Railfreight announced that the locomotives would be rebuilt as Class 69s by Progress Rail, with the existing Ruston-Paxman RK3 engine replaced by an EMD 710 12 cylinder powerplant, with updated electronic controls based on those used in the also due to be installed.Progress Rail to repower locomotives for GB Railfreight International Railway Journal 3 April 2019 The first was due for delivery in May 2020, however this is delayed.
In June 2012, at least 147 Enercon E-126 windturbines were operating, in construction, or nearing final approval, 35 of them completed and operating.Summary of existing and planned E-126 wind turbines (based on public available www-info till June 2012) Furthermore, during 2010-2011, onshore wind farm projects still in their early design processes were considering wind turbines of the 2-3.5 MW class, or wind turbines of the 5-8 MW class. This approach is at least applied in the Netherlands. Examples for this trend are found for instance in the preliminary research for the "Wind farm de Drentse Monden" aiming at 300-450 MW with possibly 50-60 E-126/7.5 MW turbines, "Wind farm N33" aiming at >120 MW with possibly 15-40 E-126/7.5 MW turbines, "Wind farm Krammer" aiming at >100 MW with possibly 11-21 E-126/7.5 MW turbines, "Wind farm Wieringermeer" aiming 200-400 MW with possibly 60 or more 6+ MW turbines (in that case possibly Repower 6M/6.15MW).

No results under this filter, show 108 sentences.

Copyright © 2024 RandomSentenceGen.com All rights reserved.