Sentences Generator
And
Your saved sentences

No sentences have been saved yet

117 Sentences With "topsides"

How to use topsides in a sentence? Find typical usage patterns (collocations)/phrases/context for "topsides" and check conjugation/comparative form for "topsides". Mastering all the usages of "topsides" from sentence examples published by news publications.

Special Report: Maxi Yacht Rolex Cup The gleaming, fluorescent-green topsides of the superyacht Inouï may scream luxury at the Maxi Yacht Rolex Cup starting on Sunday.
But a 333-metre-long Chinese artwork of a phoenix on its topsides signals its distinctive status as the first ship designed especially for China's expanding cruise market.
The bright white and blue topsides of the 60-foot racing sailboat Banque Populaire looked freshly polished as beads of seawater washed along the hull last Thursday in Les Sables d'Olonne, France.
The integrated deck topsides (9600 tonnes) are supported by a four leg steel jacket (lift weight 8400 tonnes). The topsides were fabricated by Redpath Offshore North; and the jacket by RGC Offshore at Methil.
The 14 subsea storage cells had a capacity of . Electricity generation was powered by three 12 MW Rolls Royce Avon gas turbines. The topside accommodation was for 120 people. There were 14 topsides modules and the topsides weight was 34,000 tonnes.
A heaviest single lift record was set in 2000 by Thialf for lifting the Shearwater topsides for Shell. Saipem 7000 set a new record in October 2004 for the lift of Sabratha Deck. Under dynamic positioning, Saipem 7000 set another record in 2010 by lifting the BP Valhall Production topsides. Shortly after it was completed, Sleipnir completed a record lift of for the topsides of the Leviathan project for Noble Energy, in September 2019.
Electricity generation was powered by four 4 MW Ruston gas turbines. The topsides accommodation was for 176 people.
The initial concept, by Allseas technical director W.P. Kaldenbach, was of a vessel capable of lifting entire platforms, and in 1987 Allseas declared its intention to build it. The initial idea featured two rigidly connected, self-propelled supertankers, with a large slot at the bows enabling it to install platform topsides in one piece. Early designs featured a flotation and ballasting system and active motion compensation system to facilitate a controlled transfer of a topsides’ weight from the vessel to a platform substructure. Allseas developed the original idea to include steel jacket installation, jackets and topsides removal and rigid pipelay capabilities.
Rognaas, Gunnar, Jun Xu, Severin Lindseth, and Finn Rosendahl. "Mobile offshore base concepts. Concrete hull and steel topsides." Marine structures 14, no. 1-2 (2001): 5-23.
Near the stern, about halfway down the starboard topsides, was a rounded wooden block about in diameter and high, with a central hole for a rope. This corresponded to a hole in the midsection of the rudder blade. From the outside the rope ran through the blade, through the round block and topsides and was fastened inside the hull. The flexibility of the hemp rope allowed the blade to pivot.
The majority of the construction was performed at a site in Bull Arm, Trinity Bay, Newfoundland and Labrador. A new community housing 3,500 workers was constructed, with its own cafeteria, gym and entertainment facilities. Many of the topsides modules were constructed locally, with some sourced internationally. The 550,000-ton slipform concrete GBS was built inside a drydock and mated with the topsides in the nearby deepwater construction site.
Illustration of the Truelove from The Illustrated London News 1870 Truelove was a full rigged ship, with three masts and square rig. She was constructed with a "tumble home" design, with her hull sides (topsides) sloping inwards to the upper decks from the water line. Her topsides were constructed with planks overlapping in such a way as to allow water to drain freely from the upper decks. The ship's usual maximum speed was .
American sailors clearing ice from ship topsides Los Angeles-class fast attack submarine USS Alexandria (SSN 757) surfacing through of Arctic ice. Akula-class submarine of the Northern Fleet submarine base at Gadzhiyevo in the Murmansk Oblast. Subfreezing conditions have significant implications for naval operations. The 1988 US Navy Cold Weather Handbook for Surface Ships outlines effects on: icing on the topsides of ships, ship systems, underway replenishment, flight operations, and personnel.
Production permanently ceased on Ninian Northern on 18 May 2017. It is currently (2019) being decommissioned. Removal of the topsides is scheduled for 2021 and removal of the jacket by 2032.
The spar was rotated by the Balder from a horizontal to a vertical floating position by pumping water through hoses attached to the spar. It was then anchored by the Balder to piles in the seafloor. The platform has three decks or topsides which support the oil and gas processing units, a drilling rig and living quarters for the workers. The topsides were designed by Alliance Engineering and constructed by Kiewit Offshore in Corpus Christi, Texas.
Their range of products includes foundations and substations for offshore wind turbine projects, suctions anchors, topsides and jackets for oil and gas projects, as well as buildings, bridges and harbour structures for infrastructural projects.
Pandora had her foredeck raised and Curlew had her topsides raised by two planks. Canobie and Gannet have hulls in more or less original condition, with Canobie reverting to gaff rig in recent years.
The topsides for Claymore were designed and procured by Matthew Hall Engineering (MHE) which was awarded the contract in November 1976.Matthew Hall Engineering publicity brochure, undated c. 1990 MHE was also responsible for construction supervision.
A later skipper of the boat, John Crill, recalls being told that Lord Shawcross, "when the election was due in about 1951, had Vanity V repainted with a vast 'Vote Labour' banner all the way along her topsides".
Gas export capacity stands at . Azeri C℘ has some of the largest water injection pumps and gas injection compressors among BP platforms worldwide. The topsides have been constructed in the ATA (AMEC-Azfen-Tekfen) construction yard in Bibi-Heybat, Azerbaijan.
Completed in April 2017, Fire Fighter returned to Greenport, New York in her as-built, late 1930 FDNY color scheme, with a black hull, white topsides and buff smokestack, and with all topside brass returned to its bare metal appearance.
The topsides for Buchan Alpha were designed by Matthew Hall EngineeringMatthew Hall Engineering publicity brochure n.d. but c. 1990 which was also responsible for procurement, project management, construction management and offshore installation services. They were awarded the contract in October 1977.
The topsides for Eider were designed by Matthew Hall EngineeringMatthew Hall Engineering publicity brochure n.d. but c. 1990 which was awarded the contract in October 1984. Initially there were facilities for 7 oil production wells, 7 water injection wells and ten spare slots.
The topsides for Magnus were designed by Matthew Hall EngineeringMatthew Hall Engineering publicity brochure n.d. but c. 1990 which was also responsible for procurement, project management, construction management, offshore installation services and commissioning assistance. They were awarded the contract in December 1978.
Electricity generation was powered by three 27 MW GE Frame 5 gas turbines. All the gas compressors were driven by electric motors, not by gas turbines. The topside accommodation was for 200 people. There were 19 topside modules and the topsides weight was 31,000 tonnes.
Pioneering Spirit performed her first commercial lift, removal of Repsol's Yme mobile offshore production unit (MOPU) on 22 August 2016. Located in the Yme field in the Norwegian sector of the North Sea, approximately west of Stavanger, the MOPU was a jack-up type platform standing on three, diameter steel legs. The decision to remove the platform was made in 2013, and the contract for the removal of the topsides was subsequently awarded to Allseas. Pioneering Spirit collided with the caisson of the Yme platform during the removal. On 28 April 2017 Pioneering Spirit performed the single-lift removal of Shell's Brent Delta topsides.
The topsides facilities included capability to drill, produce meter and pump oil. Initially production was to an ELSBM and then to the Fulmar Alpha platform in August 1986. Associated gas from the reservoir was separated and used to power electrical generation with the excess being flared.
Topsides, from the waterline up, are hybrid fibreglass/carbon composite with balsa core. The deck is a Nomex/full carbon composite. The deck superstructure is made of a carbon frame to which glass panels are glued. The glass is composed of Lexan and a triple laminate of glass.
Sleipnir is next contracted to install the production and living quarters platforms of the Tyra Future project for Maersk Oil. The existing Tyra platforms will be picked by Sleipnir and loaded on barges for recycling. Other future contracts include Brae Bravo (jacket and topsides removal) and Hollandse Kust Zuid Alpha (HVAC platform installation).
The boat is open, no decked-over areas. The rails (deck topsides or gunwales) are 10 inches wide at the beam. A mast step is molded into the deck and the mast supported by cast aluminum bracket attached to the bow section. A flared spray molding extends along the forward deck section aft.
CNR submitted a Cessation of Production application which was approved by the UK government in 2012. Production ceased in 2014. Decommissioning activities started from 2013 by plugging the wells. The platform was dismantled by removing the topsides modules and then removing the jacket to a height of about 44 m above the sea bed.
Its cross sectional shape was flatter on the bottom with less flare to the topsides. This shape is far more stable and able to handle rougher seas. It had the high prow of the later longships. After several centuries of evolution, the fully developed longship emerged some time in the middle of the ninth century.
The rig was ordered on 10 June 2005. Its hull was built at the Sevmash yard in Severodvinsk, Russia. In 2007, the hull was moved to the shipyard in Palermo, Italy where Fincantieri carried out topsides construction. On 24 June 2010, a fire incident took place when the fire started in the ventilation system.
MHB offers a full range of construction and engineering services for the offshore and onshore oil and gas industry, from detailed engineering design and procurement to construction, installation, hook-up and commissioning (EPCIC). Projects include the construction of production topsides, process modules, turrets, floating production systems, mooring buoy systems and mobile offshore storage units.
The topsides facilities included capability to drill, produce, meter, pump oil and gas. It can also inject both gas and water. Production is exported via the Norpipe system to Teesside. Associated natural gas from the reservoir is separated and used to power electrical generation with the excess being transported by the Fulmar Gas Pipeline to St. Fergus.
If eggs are fully extracted they can be more fully studied individually at the cost of information regarding the spatial relationships between eggs or if the eggs had hatched. Commercial fossil dealers tend to expose only the bottom of the eggs since the topsides might be damaged by hatching and therefore less visually appealing to potential customers.
This became popular with the US Navy in particular and they used it during the War of 1812. Vessels were of oiled wood except for the wale, the widest strake that rubbed other vessels, docks, etc. Wales were tarred or otherwise blackened; as they had been from Greek and Roman times. Topsides were maintained by scraping and re-applying oil.
The Murchison oil field was discovered in 1975 by Conoco (UK) Ltd. The reservoir is a Middle Jurassic Brent Group sandstone sealed by Upper Jurassic shales. The oil is unsaturated and had a gravity of 36° API, and without a gas cap. The topsides for Murchison were designed by Matthew Hall Engineering which was awarded the contract in November 1976.
The topsides for Gannet were designed by Matthew Hall EngineeringMatthew Hall Engineering publicity brochure undated but c. 1990 which was also responsible for procurement and construction and commissioning assistance. They were awarded the contract in July 1989. Initially there were facilities for 15 oil production wells, two gas production wells and seven spare slots; there was also provision for 39 subsea risers.
Starting from the Russian coast near the town of Anapa, the , diameter twin-pipeline will traverse the Black Sea at depths up to and emerge onshore in Turkey's Thrace region. She has installed three out of four platform topsides for phase one of the Johan Sverdrup development in offshore Norway. The drilling platform (DP) topside was installed in June 2018.
Bussorah Merchant was built in 1818 at Calcutta, from teak. She was 531 tons (bm) and had three masts. She was felted and doubled in 1833, had repairs to topsides and decks in 1846, and was sheathed with yellow metal in 1849. Later repairs were undertaken in 1852, when she was again sheathed with yellow metal, fastened with iron bolts.
Electricity generation was powered by two 12 MW Rolls- Royce Avon gas turbines. The original topside accommodation was for 150 people. The topsides weighed 10,000 tonnes and there were four modules supported by an eight leg steel jacket installed in 1976. MHE was awarded The Queen's Award for Enterprise: Innovation (Technology) in 1980 for the innovative design of production facilities for Claymore A Platform.
At the bow the cut water was especially strong, as longboats sailed in ice strewn water in spring. Hulls up to wide gave stability, making the longship less likely to tip when sailed. The greater beam provided more moment of leverage by placing the crew or any other mobile weight on the windward side. Oceangoing longships had higher topsides about a high to keep out water.
The other two topsides named P1 and LQ were installed in March 2019. This set a new record with P1 topside weighing 26,000 tons is the heaviest single-lift executed offshore till date. The vessel is expected to return in 2022 to install P2 topside weighing 27,000 tons for phase two of the Johan Sverdrup development. It removed Valhall QP topside for Aker BP in June 2019.
Carrying a test platform in the bow slot (Aug 2016) Pioneering Spirit is the world's largest vessel, in terms of her gross tonnage (403,342 gt), breadth (), and displacement (). The maximum topside lift capacity is achieved by operating as a semi-submersible. For removal of topsides, the vessel straddles the intended payload with the slot formed by the twin bows. The slot measures (L×W).
The field also included a remote flare, the "Brent Flare", which was used to flare off excess gas before gas handling and export facilities were installed in the field. This unit was decommissioned and removed using a heavy lifting barge in 2005. The topsides for Brent Charlie were designed by Matthew Hall Engineering which was awarded the contract in January 1974.Matthew Hall Engineering publicity brochure n.d.
The caïque often has a horizontal windlass mounted over the bow. The bow is also known in Greek as the proura or plowri, similar to the English prow. Most caïques are painted white, to counter the powerful sun, with the strakes and topsides in vivid chromatic colors. The name of the boat is painted or carved on a tablet, on the planking below the bow.
There was a single production train with three stages of 3-phase of oil, gas and water separation; the first stage separator initially operated at 45 barg. Electricity generation was powered by two 19 MW Rolls Royce Olympus C gas turbines. The topside accommodation was for 200 people. The topsides weighed 16,000 tonnes and there were 16 modules supported by an eight leg steel jacket of lift weight 24,640 tonnes.
The temperature difference between Finland and Texas posed a challenge in assembling the pieces as the components built in cold of northern Europe expand in the heat of the Gulf of Mexico. Computer-guided lasers marked out the measurements to ensure precision. After the decks were constructed, in March 2009 the Thialf lifted the 9,500 tonne topsides onto four posts on the spar and slotted it into position.
Export cable installation began late 2010, under contract to Visser & Smith Marine Contracting. Work was carried out by the ships Atlantic Guardian (route clearance), Team Oman (laying), and VOS Sympathy (trenching). The offshore substations were installed in May 2011 by Heerema. The remaining pile foundations, and the transition pieces and offshore substation topsides where installed by Seaway Heavy Lifting between May and August 2011 using the newly built Oleg Strashnov.
The hull is built from glass-reinforced plastic foam sandwich and the spars from aluminium. The hull has been made in a range of colours but so far the deck moulding and hull below waterline have always been Vela Grey. The most common topsides are Purple, Navy Blue and Race Blue, but examples of Yellow, Charcoal Grey and Vela Grey (generally known as 'White') boats can also be found.
Production started in August 1978 from the Dunlin Alpha platform. This platform is a concrete gravity base (GBS) structure of the ANDOC type (Anglo Dutch Offshore Concrete) and was installed in June 1977. It has four legs and storage capacity for 838,200 barrels of oil. The total sub-structure weight is 225,000 long tons (229,000 tonnes) and it is designed to carry a topsides weight of 15,635 long tons (15,886 tonnes).
Approaching Cape Horn, the yacht was pitchpoled by a rogue wave. Beryl, who had been on the helm, was tossed from the boat and injured. Tzu Hang was dismasted, partially submerged, and the topsides were severely damaged, but the three sailors managed to sail the damaged vessel to Chile, where extensive repairs were undertaken. In 1957, a year later, Miles and Beryl departed again to round Cape Horn.
The world's largest oil platform, Hibernia's GBS sits on the ocean floor approximately in depth with its topsides extending approximately out of the water. The platform acts as a small concrete island with serrated outer edges designed to counter icebergs. The GBS contains storage tanks for of oil, and the remainder of the void space is filled with magnetite ballast. The structure weighs 1.2 million tons (1.1 million tonnes).
The Oscar W. is 103 ft, 5 inches in length, with a beam of 20 ft 7 inches and a draft of 2 ft 3 inches to 5 ft 1 inch. It weighs 83 tons gross, 59 ton net. The paddle steamer is of composite construction and was built from steel topsides and 3 inch Red Gum below. The engine gives out 16 hp - a wood-burning Marshall Steam engine.
Gas is transferred to the terminals via 36 inch pipelines. Gas, after processing and compression, is supplied to the National Transmission System. Gas was formerly transferred to the Roosecote Power Station, next-door to the north at Roose, before the gas turbine station was decommissioned in 2014. The topsides for the Morecambe Bay production, accommodation and flare platforms were designed by Matthew Hall EngineeringMatthew Hall Engineering publicity brochure n.d.
The Marinhoa is a cattle breed from Portugal. A large animal with harmonious forms. Thick elastic and prominent skin; light brown coat, tending to straw; docile temperament; long and flat head; bulky but not large abdomen; long wide and deep back and topsides; muscled members, strong, with good angulation; dark mucous; small horns; sub-concave profile. The breed region is circumscribed almost exclusively to the Central Portugal in Aveiro District.
Wison Group Headquarters are in Shanghai, China, at the Zhangjiang Hi-Tech Park. The building was designed by Architecture-Studio, based in Paris, France. The firm also has a shipbuilding yard in Nantong, China, on the banks of the Yangtze River and is building a second fabrication facility in Zhoushan, China, that will be focused on the construction of onshore and offshore modules, large floating production hulls, topsides and jackets.
A shipbuilder from the naval dockyard examined Lady Nelson and as her main and after keels were both found to be beyond repair they were replaced with new ones. Lady Nelson had been troubled by leaks in her topsides since she left England. This was also investigated whilst the vessel was at the Cape, and it was found 'that instead of the seams being filled with oakum they had absolutely substituted putty'.Memorial of Lieut.
The heavy cruiser also embarked Harry Hopkins, who had come across from England on board Prince of Wales. The Prime Minister later dined with the President, and ultimately left Augusta at 2345. The following day, came alongside and embarked the President and his party, transporting them to Prince of Wales for divine services, an inspection of the battleship's topsides, and a luncheon. President Roosevelt again entertained the Prime Minister on board Augusta that evening.
In boat and ship construction, strakes immediately adjacent to either side of the keel are known as the garboard strakes or A strakes. The next two are the first broad or B strake and second broad or C strake. Working upward come the bottom strakes, lowers, bilge strakes, topside strakes, and uppers also named sequentially as the D strake, E strake, etc. The uppermost along the topsides is called the sheer strake.
Located in the Brent field, approximately off the northeast coast of Shetland, the iconic platform sat on a three-legged gravity-based structure in of water. The vessel delivered the topsides to Able UK's Seaton Port yard, Teesside, for disposal. Pioneering Spirit has done the installation of the offshore section of the Turkish Stream pipeline in the Black Sea. The pipeline construction started in May 2017 and it was finished in November 2018.
Like dories, sharpies are initially tender since they have a shallow draft without a keel. They need large amounts of ballast stowed on the central floor before they become acceptable as sea boats: 600 to 900 lbs is normal in a 30 ft boat. Sharpies rely on their high flared topsides to provide stability when heeled on a reach or to windward. The twin unstayed masts makes rigging very easy and saves on cost.
BSE-SEM image at 89 times magnification showing topsides of the calcite rafts (flat surfaces) and bottom crystals growing underneath Calcite crystals form on the surface of quiescent bodies of water, even when the bulk water is not supersaturated with respect to calcium carbonate. The crystals grow, attach to one other and appear to be floating rafts of a white, opaque material. The floating materials have been referred to as calcite rafts or "leopard spots".
The spar and the topsides of the Perdido were constructed separately and then assembled in its final position in the Gulf of Mexico. The Perdido's hull or spar was constructed by Technip in Pori, Finland. A barge shipped the 22,000 tonne spar 13,200 kilometres (8,200 miles) from the Baltic Sea to the Gulf of Mexico. After floating the spar, it was towed to its final home above the Alaminos canyon 320 kilometres (120 miles) from the shore.
The Sutton Hoo longship, sometimes referred to as the ghost ship of the Wulflings, is about maximum beam and built about 625 AD. It is associated with the Saxons. The ship was crushed by the weight of soil when buried but most details have been reconstructed. The ship was similar in hull section to the Nydam ship with flared topsides. Compared to later longships, the oak planks are wide—about including laps, with less taper at bow and stern.
The FPSO conversion was carried out at MMHE Shipyard Pasir Gudang in Malaysia, while the topsides were fabricated in modules at various international vendor locations. The FPSO has a disconnectable turret (APL). The vessel can disconnect in advance of hurricanes and reconnect with minimal down time. A contract for an FPSO to operate in even deeper waters (2,900 m) for Shell's Stones field in the US Gulf of Mexico was awarded to SBM Offshore in July 2013.
BP also selected Aker Solutions to perform the detail engineering, procurement and construction management assistance (EPcma) for the Skarv field development. The EPcma contract covers detail engineering and procurement work for the FPSO topsides as well as construction management assistance to BP including hull and topside facilities. The production started in field in August 2011. BP awarded the contract for fabrication of the Skarv FPSO hull to Samsung Heavy Industries in South Korea and the Turret contract to SBM.
A more recent development is concrete sub-sea structures. Concrete offshore structures show an excellent performance. They are highly durable, constructed of almost maintenance-free material, suitable for harsh and/or arctic environment (like ice and seismic regions), can carry heavy topsides, often offer storage capacities, are suitable for soft grounds and are very economical for water depths larger than 150m. Most gravity-type platforms need no additional fixing because of their large foundation dimensions and extremely high weight.
Goldeneye Gas Platform is an unmanned and now abandoned offshore gas production platform in North Sea block 14/29, in the South Halibut basin area of the outer Moray Firth, 105 km northeast of St Fergus Gas Plant in Scotland. The topsides were designed by SLP Engineering Ltd. Production was from five wells with well fluids separated by a single vertical separator vessel. Separated liquids were re-injected into the export gas stream without further treatment.
Formal cessation of production for the Miller field was approved by the DECC in September 2007. In 2009, BP estimated the gross cost of decommissioning the field to be of the order of £300 million. The initial phase of decommissioning activities involving well abandonment and topsides cleanup were completed by the end of 2009. The oil and gas export pipelines have been flushed clear of hydrocarbons and are being left in place for potential future use.
The WIP is a fixed steel platform, bridge linked to the existing Valhall WP. Water injection is expected to increase oil recovery from 31% to 38%. The integrated topsides has water injection facilities, seawater and produced water treatment facilities and power generation. The platform-based drilling rig's configuration allows for drilling and maintenance of wells on the new platform (24 wells total) and on the existing WP platform (19 wells total). The IP has integrated connections to the onshore operating centre.
The PH facility is an integrated processing and accommodation platform, with a power from shore module and bridges linking it to the existing Valhall platforms. The topsides weigh 18,500 tonnes, the jacket structure weighs 8,400 tonnes and there are 180 single cabins on the platform. Front-end engineering and design work was undertaken by Fabricom and Wood Group, with the deck constructed by Heerema. The ten-storey living quarters module was constructed by SLP Engineering, with Alphastrut supplying a lightweight aluminium support system.
The Aasta Hansteen spar was built on its side in the dry dock on barges. Once built it was floated off the barges and then floated onto the heavy transport ship Dockwise Vanguard and shipped to a fjord near Stord in Western Norway. The spar was upended in the fjord, after which the topsides were installed using the floatover technique. It was then towed vertically to the Aasta Hansteen gas field 300 km off Bodø at the northwest coast of Norway.
Originally called the Luva gas field and later renamed after Aasta Hansteen, it was discovered in 1997 approximately 300 km off the coast of Norway. During start up of the platform, the production from the surrounding Luva, Haklang and Snefrid gas fields will be exported to the platform. Future fields already discovered are planned to be tied back to the Aasta Hansteen platform through SCRs. Future expansion of additional risers and topsides facility are built-in in the design of the platform.
On platforms this technology can be applied to perform modifications, maintenance upgrades, to remove crane pedestals, compressors and topsides, and for hurricane remediation. Sub-sea saws can be installed by divers while being monitored and powered from a barge or platform, or they can be installed and powered by working class ROVs. The robust characteristics of these four wheel drive bespoke underwater wire saws, combined with remote control functionality, makes them suitable to extreme offshore decommissioning conditions such as the North Sea.
She has also been engaged in offshore wind power and wave energy farm developments with a focus on establishing meteorological and oceanographic conditions in relation to design basis, amongst others. She has estimated wind load on many structures including tall buildings, suspension bridges, topsides on offshore platforms, solar plants, etc. Subsequently she has set-up physical models and field experiments, analysed and assessed the structural dynamics and provided solutions to Vortex-induced vibration (e.g., Great Belt East Bridge) and earthquakes.
CB&I; was awarded the contract for engineering design of the topsides, which were built by Lamprell in Dubai and delivered in June 2013 (WHP) and April 2014 (PUQ). Sembmarine SLP was awarded the contract for engineering, procurement and construction of the 140-person, six-level accommodation module, with a lightweight aluminium flooring system supplied by Alphastrut, which was installed in May 2014. Sembmarine SLP also won the contract to build the bridge structure, while GE Oil & Gas provided production and control equipment.
This structure was an accommodation platform in Valhall field, located in southern part of North Sea about 280km off the Norwegian coast. Weighing 3800 ton, it is the lightest lift operation performed by the vessel. In June 2019 Pioneering Spirit also removed the Brent Bravo topside weighing 25,000 tonne located 186km off the coast of Scotland on the way to Norway. She is scheduled to remove the remaining two Brent field topsides for Shell, the 15,000 tonne Brent Alpha and 29,500 tonne Brent Charlie.
A special purpose crane built by Huisman is scheduled for delivery in the second half of 2018. The tub mounted crane will be available for additional lifts for jacket and topsides installation such as pile handling and bridge installation. Stinger (left) and STF (centre) aboard Bumblebee; Pioneering Spirit in background on right When equipped with the Stinger, Pioneering Spirit can be used to lay pipe. Pipe segments are welded together on board the vessel, then are placed on the Stinger, where they roll into the water.
Congdon silktassel is usually found at elevations above 200 meters. This species is usually found within the mountains of the inner Pacific Coast range, such as Mount Hamilton ranging north to the inner coast range in Sonoma County, which is where the specimen photographed herein was found. Coast silktassel (Garrya elliptica) is most closely related species. Coast silktassel has similar wavy undulated entire leaf margins with somewhat darker glossier leaves, and the leaf topsides are more waxy and not quite so leathery as Congdon.
Flared bow of a cruise ship A ship's bow should be designed to enable the hull to pass efficiently through the water. Bow shapes vary according to the speed of the boat, the seas or waterways being navigated, and the vessel's function. Where sea conditions are likely to promote pitching, it is useful if the bow provides reserve buoyancy; a flared bow (a raked stem with flared topsides) is ideal to reduce the amount of water shipped over the bow.Note: Aside from making the deck slippery, salt water may corrode metal decks.
Early designs of the 1920s were often built by amateurs, who employed the lightest materials available to them at the time, which were often glued timber boarding or plywood on the floor, plywood topsides, and varnished canvas decks. Most were about long and stepped hulls were employed with a step to induce air under the hull, to enable the boat to float on air bubbles. The principle behind 'planing' was not fully understood. Thus, hulls were flat bottomed with an upward curve at the bow and the step of the way aft.
The Playmate was a wooden lapstrake rounded-bottom hull with all models built in 1935 and later powered by a Buchanan Midget 25-horsepower inboard engine. The boat was redesigned in 1939 with forward seats and a windshield, along with a slightly higher hull, which was the configuration it retained for the rest of the production run. In 1940 Duke introduced two larger launches; 19 and 21 feet long, with cedar lapstrake bottoms and mahogany topsides and decks. The smaller models were powered by a 4-cylinder Buchanan 57-horsepower or Gray 75-horsepower engine.
The shape suggests mainly river use. Unlike later boats, it had a low bow and stern. A distinctive feature is the two- prong cutaway bow section. Stora Hammars I stone, Sweden showing armed warriors in a longship The first true longship that was rowed was the Nydam ship, built in Denmark around 350 AD. It also had very rounded underwater sections but had more pronounced flare in the topsides, giving it more stability as well as keeping more water out of the boat at speed or in waves.
Boadicea was one of a batch of large frigates ordered in 1795, all of which were the largest of their type, and the majority of which were to the draught of captured French ships. She was built to the design of , a 40-gun ship completed in 1787 and captured in October 1793. Changes were made to the shape of the topsides, and the scantlings and fastenings were strengthened to reflect British practice. She retained her shallow French hull form, and as a result the holds and magazines were considered cramped.
The topsides were designed by McDermot Engineering. The plant had a capacity of 50,000 barrels of oil per day and 30,000 barrels of produced water per day. The plant comprised two parallel 3-phase (oil, gas and produced water) first stage separators operating at a pressure of 440 kPa and a common 3-phase second stage separator operating at a pressure of 241 kPa. Oil shipping pumps with a capacity of 55,000 barrels per day delivered oil to the export pipeline to the Cormorant A installation at a pressure of 3447 kPa.
Pioneering Spirit set a new offshore lift record with the single-lift removal of Shell's 24,200 t Brent Delta topsides in April 2017. For its first commercial job, the vessel removed the 13,500 t Yme mobile offshore production unit from Norwegian waters for Repsol in August 2016. Pioneering Spirit’s started its first pipelay job, installation of the offshore section of the TurkStream pipeline in the Black Sea, in June 2017. Allseas has committed to building an even larger version of the same design, Amazing Grace, which is scheduled to be delivered in 2022.
The Aasta Hansteen platform is a truss spar type allowing condensate to be stored in the hull below sea level and offloaded to a shuttle tanker. The produced gas is exported to the shore with steel catenary risers (SCR). The production risers are also SCRs, with these being the first time SCRs have been used in the Norwegian Sea. The spar hull was designed by Technip, with the topsides being designed by CB&I;, with both being fabricated by Hyundai Heavy Industries in South Korea before being transported to Norway for installation.
While in dock, her entire hull was cleaned, blasted, and repainted, her hull blanking plates inspected and an ultrasonic survey carried out. She is not expected to require further drydocking until 2020. While under tow to Portsmouth she was delayed by bad weather and arrived a day late: it had been intended that she would arrive on 6 June 1999, the fifty-fifth anniversary of the Normandy landings. During the maintenance work, Belfast hull and topsides were repainted in her specific camouflage scheme officially known as Admiralty Disruptive Camouflage Type 25, which she had worn from November 1942 to July 1944.
Heerema booked its first contracts for SSCV Sleipnir in 2017, two years before it was completed. During the ship's maiden voyage from Singapore to Spain via the Cape of Good Hope, it set a world record for the largest LNG bunkering operation on July 10, when of LNG were transferred to it off the coast of Sumatra from Coral Fraseri, chartered by Titan LNG from Anthony Veder. Coral Fraseri was scheduled to refuel Sleipnir in Spain, prior to it passing into the Mediterranean Sea. Sleipnir completed a record lift of for the topsides of the Leviathan project for Noble Energy, in September 2019.
Her topsides were wrecked, and a large fire burned amidships. After firing steadily for over 30 minutes, without any problems, King George V , by 09:27, began having trouble with her main battery, and from that point onward every salvo missed at least one gun due to failures in the safety interlocks for antiflash protection and from ammunition feed jams. At 10:21, with Bismarck silenced and obviously sinking, Admiral Tovey detailed the cruiser to finish her off with torpedoes. King George V fired 339 14 in (354 mm) and over 700 5.25 in (133 mm) shells during the action.
The storage system was decommissioned by Shell from 2005 to 2007 prior to the sale to Fairfield Energy. The topsides facilities included capability to drill, produce, meter and export oil. It also has capability to re-inject water to maintain reservoir pressure, (111,250 bls/day)predicted. Peak production was 115,000 barrels per day in 1979; and it was approximately in the region of 3500 - 4000 bpd in 2015 prior to the shut in announcement (Production ceased on 15 June 2015) Oil production is by pipeline to Cormorant Alpha and then by Brent System pipeline to Sullom Voe, Shetland.
The decommissioned tension-leg platform had been acquired by Sevmorneftegaz in 2002 and its 19,000-tonne topsides had already been transferred to a new ice-resistant production platform being built for the Prirazlomnoye field in the Pechora Sea. While underway to Lerwick for refueling, one of the tow lines connecting the 23,000-tonne platform hull to the two tugboats broke free, but was later reconnected. In the end, the hull was towed to Cromarty Firth where it remains . In August 2011, National Science Foundation (NSF) contracted Vladimir Ignatyuk to support the annual break-in and resupply mission to McMurdo Station in Antarctica.
The A-4P Skyhawk (called A-4B by the Argentines) were bought from the US Navy inventory in 1966 and at the time of the war were painted green/brown topsides with light blue undersides heavily faded colours. Yellows identity markings were also added during the conflict. These aircraft provided outstanding performance and availability even in the harsh operating conditions of the South Atlantic with most of them returning from missions with some form of battle damage and were patched up and pressed back into service within matter of hours. Because of this, pilots used to change airframes between sorties.
The river then skirts Christ Church Meadow before flowing into the Thames (or Isis) through two branches; the island in between has the main shared college boathouses for rowing. Easter and Summer punting is popular on the Oxford stretch. (A punt is a long, flat-bottom, low-topsides, boat propelled by a pole pushed against the river bed.) Punts are typically hired from a punt station by Magdalen Bridge, or the Cherwell Boathouse (just to the north of the University Parks). It is possible to punt all the way from the Isis, north past the University Parks, and out beyond the ring road.
The platform acts as a small concrete island with serrated outer edges designed to counter icebergs. The GBS contains production storage tanks for 1.3 million barrels of oil in an 85 m high caisson, with the entire structure weighing 587,000 tonne before 450,000 tonnes of solid ballast were added.Offshore TechnologyHibernia Construction The GBS was constructed in Bull Arm and the "topsides" production and living quarters was attached to the base while floating in Bull Arm, before the integrated unit (production platform and GBS) was towed out to the actual Hibernia field. Production commenced on November 17, 1997.
The remaining 6-inch breech-loading guns which these vessels carry are fitted at broadside ports in the ordinary way. The Nordenfeld guns are fitted in projecting parts of the topsides, and are so arranged as to give great training and great depression, firing into boats alongside. The Whitehead torpedoes are discharged from broadside ports on the lower deck, two forward and two aft.""Lord Brassey", The Naval Annual, 1886, page 199. When Leander was first commissioned in May 1885, her armament was listed as follows: :"Upper deck 10 6-in BL, 8 1-in Nordenfeld, 2 5-barrel and 2 2-barrel 0.45-in guns.
With considerable labour > two strakes were added to the topsides, formed out of paling's which were on > board, and on the 14th June all was ready for a start. The crew drew lots as > to who should ,go in the boat, and they fell to Captain Geach, the chief > officer, the steward, Mr. Simmens a passenger, and two natives. On 21 June the schooner Joan Andrews under Captain Stewart, while on a run from Rockhampton to Sydney, picked up the crew in the lifeboat and brought them to Sydney. On the evening of 28 June the government vessel Thetis left Sydney for the reef and arrived there late the next day.
Hibernia Gravity Base Structure during construction The Hibernia Gravity Base Structure is an offshore oil platform on the Hibernia oilfield southeast of St. John's, Newfoundland, Canada. A 600-kilotonne gravity base structure (GBS) built after the Ocean Ranger disaster, it sits in of water directly on the floor of the North Atlantic Ocean off St. John's, Newfoundland at . This GBS is designed to resist iceberg forces and supports a topsides weighing 39,000 tonnes at towout, increasing to 58,000 tonnes in operation. There were significant challenges faced by the engineering firms Doris Development Canada, Morrison Hershfield and Mobil Technology in developing a structural solution with adequate strength which was also constructible.
A wreck that is believed to be that of Bristol Packet lies in the intertidal zone on Madbrian sands off Minehead where it has been exposed at different times including between February 2014 and July 2015 when a visual survey was undertaken and the exposed parts of the wreck photographed. The position of the wreck indicates it was driven on its beam ends onto the sands. The date of the vessel is confirmed by comparison of the way it was built of pine and larch, incorporating both treenails and copper fastenings, with other vessels of the same period. Bristol Packet is known to have had pine topsides.
The ship was designed by Pete Culler, a naval architect in the United States, as a working fishing boat with a large engine and a small sailing rig. Tucker Thompson changed her design to build her in steel and extended her by more than two metres, making the hull longer and deeper to accommodate the tall rigging. Her design is based on a halibut schooner and a replica of vessels that plied their trade on the Pacific West Coast of the USA in the early 19th century. The schooner was constructed with a welded steel hull and decking, with topsides and deck overlay made from kwila.
Indeed, it notable sheer further confuses the matter. The Niagara’s high topsides compare to contemporary designs but its coach house hints at the traditional shapes and trim of older designs." A review in Cruising World written by Jayne Finn in 2006, stated, "Traditional looks combined with modern features draw frequent compliments for the Niagara 35 ... Under way, the boat is stable and stiff, and we've had the rail of our Niagara 35, Phantasia II, in the water only once, when beating down Lake Huron in 20 knots of wind. On that same trip we hooted and hollered downwind at over 8 knots on a day on which virtually no one else was out.
Although only six boats contested the 1960 contest at Auckland the regatta was anything but uninteresting. As one leading New Zealand yachting journal said: "The 18s are still the glamour boats with the general public. Even the weekday races saw the waterfront road and headlands thick with spectators and the starting wharf completely packed". There were great dramas even before the racing began when Bob Miller (later famously known as Ben Lexcen) arrived with his radically designed Taipan, which was the biggest break in tradition since the skimmer. She was a three-man boat, hard chine, plywood construction, reverse sheer, half-decked, heavily flared topsides and narrow (4 ft 3in) beam on the chine.
Hibernia is an oil field in the North Atlantic Ocean, approximately east- southeast of St. John's, Newfoundland, Canada, in 80 m of water.Hurley, T.J., Kreisa, R.D., Taylor, G.G., and Yates, W.R.L., 1992, The Reservoir Geology and Geophysics of the Hibernia Field, Offshore Newfoundland, in Giant Oil and Gas Fields of the Decade, 1978-1988, AAPG Memoir 54, Halbouty, M.T., editor, Tulsa: American Association of Petroleum Geologists, The production platform Hibernia is the world's largest oil platformE&E; Publishing, 8 Nov. 2013 (by weight) and consists of a integrated topsides facility mounted on a gravity base structure. The platform was towed to its final site, and of solid ballast were added to secure it in place.
Samsung Heavy Industries Co., Ltd. (Korean: 삼성중공업) is one of the largest shipbuilders in the world and one of the "Big Three" shipbuilders of South Korea (including Hyundai and Daewoo). Geoje (in Gyeongsangnam-do) is one of the largest shipyards in the world, having 3 dry docks and 5 floating docks. A core subsidiary of the Samsung Group, South Korea's largest conglomerate, SHI's main focus is on the engineering, procurement, construction, commissioning and the delivery of: transportation ships for the commercial industry, topsides modules, drilling and floating production units for the oil and gas sector, gantry cranes for fabrication yards, digital instrumentation and control devices for ships, and other construction and engineering services.
Higher topsides were supported with knees with the long axis fastened to the top of the crossbeams. The hull was waterproofed with animal hair, wool, hemp or moss drenched in pine tar. The ships would be tarred in the autumn and then left in a boathouse over the winter to allow time for the tar to dry. Evidence of small scale domestic tar production dates from between 100 AD and 400 AD. Larger industrial scale tar pits, estimated to be capable of producing up to 300 litres of tar in a single firing have been dated to between 680 AD and 900 AD. A drain plug hole about was drilled in the garboard plank on one side to allow rain water drainage.
The emphasis switched from the conversion of two existing tankers to a new-build hull in 2004, though retaining the catamaran concept. The decision was prompted by a lack of suitable vessels to convert, the lower costs associated with a new-build, and the need to house sophisticated equipment – such as a dynamic positioning system – in the hull. In 2007, twenty years after the idea was first conceived, Allseas announced plans to build the Pieter Schelte, a twin-hulled platform installation / decommissioning and pipelay vessel. Named after the offshore pioneer Pieter Schelte (father of Heerema), the design featured a lifting system at its bows for lifting platform topsides up to and a lifting system at its stern for lifting steel jackets up to .
The Thistle Late Life Extension (LLX) Strategy aims to recover over 35 million barrels of oil over the next 15 years from the Thistle and Deveron oil fields, using a mixture of existing well stock and new wells. A drill rig re-activation project has been completed and has successfully delivered several new wells and well renovations to date with an industry leading-safety record. The Thistle LLX strategy will also ensure that the Thistle platform will be operable to 2025 and beyond. To achieve this, a series of major activities have started including initiatives to provide reliable power, improve structural and topsides integrity, upgrade safety and control systems and simplify the platform oil and production and water treatment processes.
To ensure that strength is not compromised by this weight savings approach, Kadey-Krogen uses massive stem-to-stern fiberglass girders that are closely spaced for effective distribution of hull loads to bulkheads, and encapsulated mahogany girder inserts that allow equipment to be attached for maximum strength and reliability. Cast lead (as opposed to iron) ballast conforms to the keel contour and is concentrated low in the hull so less ballast material is required and weight is reduced. Deckhouse and hull topsides are of cored laminates for reduced weight, lower center of gravity, thermal insulation and strength. Critical areas are reinforced with an impact-resistant fiberglass mat containing Twaron, which is the same fiber used to give body armor "bullet-proof" capability.
RNLI inshore rescue boat during Falmouth Lifeboat Day, August 2006 A rigid inflatable boat (RIB), also rigid-hull inflatable boat or rigid-hulled inflatable boat (RHIB), is a lightweight but high-performance and high- capacity unsinkable boat constructed with a rigid hull bottom joined to side- forming air tubes that are inflated with air to a high pressure so as to give the sides resilient rigidity along the boat’s topsides. The design is stable, light, fast and seaworthy. The inflated collar acts as a life jacket, ensuring that the vessel retains its buoyancy, even if the boat is taking on water. The RIB is an evolutionary development of the inflatable boat with a rubberized fabric bottom that is stiffened with flat boards within the collar to form the deck or floor of the boat.
The AC45 are authorized to be taken out of measurement to serve as a testing platform for the America's Cup. Oracle Racing released photographs of an AC45 hydrofoiling with L-type appendages on June 18, 2012, a premonition of Team New Zealand's larger foiling AC72 Aotearoa test boat first spotted in Auckland on August 29, 2012. first sighting of a hydrofoiling AC72: In February 2015 Oracle Racing and Artemis Racing tested two AC45s modified by Core Builders; They featured L-type hydrofoils, horizontal rudder stabilizers, lengthened crossbeams (herego wide beam), a shortened jib-only bowsprit extending into a centerline pod under the wing, flaring topsides, closed transoms, opened hulls with deep cockpits for binnacles and wheels, replacing the tiller. The authorization does not permit to lengthen the hulls.
In a local news article, Hillard Bloom of Tallmadge Brothers explained that the vessel should not have been hauled and left on dry land as it had, if there were intentions of ever making it a working vessel again. He stated that the planks of oak vessels like Hope have the tendency to shrink when removed from the water for an extended period of time. The restoration process began with Hope being lifted back into the water where its boards were given the opportunity to take in moisture and expand. The restoration process continued when the crew of Tallmadge Brothers transported the vessel to a dry dock in Bridgeport, CT where its boards were caulked, its deck was sanded, its mast was stepped, its bottom and topsides were painted, and it was fully rigged.
She was acquired from the company by the California Pacific Railroad Company in 1871. Amelia (sidewheel steamer): She was launched in 1863 originally as a San Francisco Bay ferry, running between Alviso and San Francisco. In 1868, Amelia was one of the first steamers in the Bay Area to convert from coal to oil for fuel. She was acquired from the company by the California Pacific Railroad Company in 1871. American Eagle: She was one of the original ships consolidated into the company in 1854, The ship was damaged in a boiler explosion and thereafter lay moored on the levee in Sacramento for several years. In 1859 her topsides were removed and she was converted into a barge. Anna Abernethy (sidewheel steamer): She ran as a competitor to the company on the Marysville - San Francisco route beginning in 1854.
The new resin was designed to be fire retardant, and was originally developed to the specifications of the US military late in the Vietnam War. It is widely suspected that the new resin was responsible for extensive non-osmotic blistering of the hulls, deck, and cabin-house structures in boats built between 1976-1981. Many of the "blister boats" were "repaired" by stripping the outer layers of fiberglas off the exterior of the hull (either undersides and topsides, or just undersides below the water line). The repair then involved drying out the stripped hull for several months (commonly in the California or Mexico desert), followed by reglassing the exterior with several layers of fiberglas with vinylester resin or polyester resin. However many of the blisters have returned on "blister boats" (hull Nos 120 to 249) despite major repairs.
Following several years of aborted startup attempts, during which time the federal government was forced to increase its liability stake in the project by forming the Crown corporation Canada Development Investment Corporation (CDEV), the Hibernia megaproject began construction of the production platform and gravity base structure in the early 1990s.Hibernia Milestones The Hibernia offshore oil field is owned jointly by ExxonMobil Canada (33.125%), Chevron Canada Resources (26.875%), Suncor (20%), Canada Hibernia Holding Corporation (8.5%; subsidiary of CDEV), Murphy Oil (6.5%) and StatoilHydro Canada Ltd (5%).Hibernia Shareholder Companies As the Hibernia field is located in an inhospitable environment consisting of rogue waves, fog, icebergs and sea ice, hurricanes, and nor'easter winter storms, engineering analyses determined that the most appropriate drilling platform would be in the form of a gravity base structure (GBS).Hibernia Ice Management The Hibernia GBS sits on the ocean floor approximately depth with its topsides extending approximately out of the water.
Allseas was founded in January 1985 by Edward Heerema, son of the late Pieter Schelte Heerema, founder of the Dutch offshore construction and installation company Heerema Marine Contractors. Offices subsequently opened in The Hague (the Netherlands) and Châtel-Saint-Denis (Switzerland). The company spent its early days developing the concept of dynamically positioned (DP) subsea pipelay. Allseas acquired the former bulk carrier “Natalie Bolten” in 1985 and converted it for DP pipelay at the Boele shipyard in Bolnes, the Netherlands. The vessel was christened Lorelay in Rotterdam on 26 April 1986. Lorelay immediately entered service and successfully executed her first pipelay contract, the 8-inch, 1.8-km Helder A-B pipeline, for Unocal in the Dutch sector of the North Sea. In 1987, the company declared its intention to build a vessel capable of lifting entire offshore platforms. The initial idea featured two rigidly connected, self-propelled supertankers, with a large slot at the bows to install platform topsides in one piece. During the late 1980s and early 1990s, the company established itself a major player in the North Sea and Gulf of Mexico. In 1992, the company acquired the former bulkhead carrier “Trenchwood” for conversion to Solitaire, the world's largest pipelay vessel.

No results under this filter, show 117 sentences.

Copyright © 2024 RandomSentenceGen.com All rights reserved.