Sentences Generator
And
Your saved sentences

No sentences have been saved yet

52 Sentences With "repowering"

How to use repowering in a sentence? Find typical usage patterns (collocations)/phrases/context for "repowering" and check conjugation/comparative form for "repowering". Mastering all the usages of "repowering" from sentence examples published by news publications.

"For the future, policymakers need to start thinking about repowering," he said.
The project was developed by Repowering London, residents of Banister House and Hackney Energy.
And it encourages existing carbon-emitting plants to invest in repowering or in emission-reducing technologies, a key component.
Repowering London, a not-for-profit based in the U.K. capital, helps facilitate community-owned renewable energy projects there.
" The project is targeting what they describe as "the job-generating tech and creative firms that are repowering Brooklyn's economy.
Repowering the grid after a total shutdown, known as a "black start", could take many hours or even a day or more.
But the repowering project ran into several cost overruns and engineering problems, as well as a lawsuit brought by an environmental group.
According to Repowering London, 679 tons of carbon dioxide will be prevented from entering the atmosphere during the project's 20-year lifetime.
You'll access three high-speed ports for Type-C, USB-C, and QC 3.0 devices, allowing you to charge three devices at once for quick and easy repowering.
Back in the capital, Agamemnon Otero, CEO of Repowering London, said that smart meters had also been installed for residents so that they can see what they are generating.
But a robot fleet could optimize repowering, sending a car to pick up a traveler only when the car had enough juice to get to the traveler's destination, and taking low-battery cars out of service to recharge as needed.
"We had submitted our roadmap document for repowering Iraq to Prime Minister Haider Jawad Al-Abadi in February," a Siemens spokesman said in emailed comments, adding the group has had a series of meetings and positive government feedback since then.
Repowering is the process of replacing older power stations with newer ones that either have a greater nameplate capacity or more efficiency which results in a net increase of power generated. Repowering can happen in several different ways. It can be as small as switching out and replacing a boiler, to as large as replacing the entire system to create a more powerful system entirely. There are many upsides to repowering.
"Quinbrook Infrastructure secures 80-MW wind repowering in California". Renewables Now. February 6, 2018. Accessed November 16, 2018.
This results in the repowering of mutants, undoing Wanda's actions on M-Day.Avengers vs. X-Men #7. Marvel Comics.
The first one is called a Full Powering and the second is called Parallel Powering. Full Powering is only used with old plants because the boilers has reached the life of its usage. Full powering replaces the original boiler and gas-turbine (GT) and heat recovery steam generator are added (HRSG). While compared to the full repowering concept, this repowering scheme achieves slightly lower efficiency.
However, the repowering was approved in May 2012 and the new windfarm was officially opened in October 2013 with the 10 new Gamesa turbines having a capacity of 2MW each.
Installation of new wind turbines can be controversial. An alternative is repowering, where existing wind turbines are replaced with bigger, more powerful ones, sometimes in smaller numbers while keeping or increasing capacity.
Lead legal challenges in support of Clean Water Act "antidegradation" regulations. 2001 ELPC developed Repowering the Midwest – The Clean Energy Development Plan for the Heartland a d regional blueprint for renewable energy development. Followed by the release of Job Jolt – The Economic Impacts of Implementing Repowering the Midwest's Clean Energy Development Plan. Succeeded in bringing and winning United States Supreme Court to halt a steel company's punitive damages lawsuit against a grassroots citizens’ group that had brought a reasonable environmental enforcement action.
Marine Leasing repowered the tug, which required rebuilding the superstructure. On December 22, 1983, Marine Leasing renamed the vessel the Marine Crusader. Her home port was then Seattle, Washington. The repowering of the Marine Crusader was done by Propulsion Systems Inc.
Several dams across the state provide hydro-electric power. It would be possible to convert the total supply to 100% renewable energy, including heating, cooling and mobility, by 2050.Mark Z. Jacobson et al.: A roadmap for repowering California for all purposes with wind, water, and sunlight.
"East Midlands Trains goes for VP185s" Today's Railways UK issue 71 November 2007 page 58 Grand Central's 43084 and 43123 were the last two Valenta-engined powercars in service. They were taken out of traffic on 22 December 2010 for repowering with the latter named Valenta 1972-2010.
Due to the two independent steam sources for the steam turbine, this concept provides a higher fuel flexibility and also greater flexibility in respect to load variations. An example of a repowering project is of Fluor updating the Seward plant.The plant was a 521-MW coal-fired power plant. The plant burns waste coal.
Repowering, the replacement of first-generation wind turbines with modern multi-megawatt machines, is occurring in Germany. Modern turbines make better use of available wind energy and so more wind power can come from the same area of land. Modern turbines also offer much better grid integration since they use a connection method similar to conventional power plants.
With new environmental regulation in the United States, coal-fired power plants are becoming obsolete. As many as three-fourths of coal-fired power plants are being shut down. Short-term options include retiring the plant or quick conversion to direct firing of the boiler with natural gas. Repowering these old coal burning power plants into gas burning boilers.
Stephen Tindale (29 March 1963 – 1 July 2017) was a British environmentalist who was the Executive Director of Greenpeace in the United Kingdom from 2000 to 2005. He was Director of The Alvin Weinberg Foundation, co-founder of the organisation Climate Answers, Associate Fellow at the Centre for European Reform and co-author of Repowering Communities with Prashant Vaze.
The first 501F gas turbines (4 of them) were sold to Florida Power & Light Co. for the Lauderdale Station repowering project, and went into service in 1993. This was the first of several large repowering projects undertaken by the Florida utility, most of which used Westinghouse gas turbines (or Siemens gas turbines, following the Siemens acquisition of Westinghouse PGBU in 1998, below.) As noted earlier, the introductory rating of the 501F in 1988 was 145 MW, when it was said that the mature rating would exceed 150 MW. As shown in the adjoining curve, the growth of the Westinghouse "F" machine over the decade 1988-1998 greatly exceeded original expectations The curve plots 501F combined cycle efficiency vs. time, with simple cycle power rating and heat rate shown at intervals along the development timeline. (Ed.
In 2008 the largest onshore wind farm in England was completed on Scout Moorarticle on opening of Scout Moor wind farm. BBC News (25 September 2008). and the repowering of the Slieve Rushen Wind Farm created the largest farm in Northern Ireland. In 2009 the largest wind farm in the United Kingdom went live at Whitelee on Eaglesham Moor in Scotland.
The Bay Area Air Quality Management District’s Carl Moyer Program provides grants to public and private entities to reduce emissions of nitrogen oxides, reactive organic gases and particulate matter from existing heavy-duty engines by repowering, retrofitting, or replacing them. The Carl Moyer Program can be used for engine repower and retrofit projects and components of the program such as the Off-Road Equipment Replacement Program (ERP)Bay Area Air Quality Management District, , Bay Area Air Quality Management District, Retrieved March 10, 2010 and the Voucher Incentive Program (VIP)Bay Area Air Quality Management District, , Bay Area Air Quality Management District, Retrieved March 10, 2010 can be used for equipment replacement projects. Engine repowering is when an existing engine is replaced with a new one. The time it takes to repower an engine varies depending on the size and application of the engine.
In addition to the offshore projects, a further 500 MW additional net capacity of onshore windfarms is expected to be constructed until 2020. The 500 MW of additional net capacity is the expected result of the scrapping of 1,300 MW capacity from obsolete wind turbines combined with the simultaneous building of 1,800 MW capacity of modern wind turbines – a process also known as repowering.
The locomotives were equipped to operate in multiple however the cooling system layout saw radiator heat passing from the leading locomotive to the trailing one, resulting in the equipment being removed. By the early 1960s with the twin Paxman 12-RPHL engines coming to the end of their useful life, the Mechanical Branch began looking at repowering options. With the cost of repowering and overhauling the Class 41s being two- thirds that of a new Class 48 and repair costs per mile over nine times greater, it was decided not to proceed with this. One was set aside in December 1957 following two electrical fires, the second in April 1961, the third in September 1969, while overhauls ceased for the rest of the class in 1972 with each locomotive withdrawn as it suffered a major failure, the final locomotive being withdrawn in June 1975.
In 1994, the 4 open cycle gas turbines were converted into two blocks of combined cycle plants with 425 MW of capacity each and renamed CCP 1 and 2. In 2010, Gas Turbine GT22 of CCP 2 was upgraded with new vanes and blades for its stage 1 and 2 The combined cycle plants 3 to 5 were completed and fully operational by 2004 with 365 MW of capacity each, which involved the repowering of the Stage I oil-fired steam thermal plant. The combined cycle plants 6 and 7 were completed and commissioned by 2012 with 431 MW of capacity each, which involved the repowering of the Stage II oil-fired steam thermal plant. In its early years, the plant used crude oil as fuel to power its turbines; however, this was replaced by natural gas piped from Terengganu on the east coast of Peninsular Malaysia after 1992.
Germany had a hydropower installed capacity in 2016 of 11,258 MW, including 6,806 MW of pumped storage. In the same year, the country generated 21.5 TWh from hydroelectric plants, representing about 3% of the country's total electricity generation. The hydropower capacity in Germany is considered mature and the potential already almost completely exploited, with limited room for growth. In recent years, growth in capacity has mainly come from repowering of existing plants.
148 large hydro power plants (>10 MW) were built from 2003 until 2016. Over the next few years, growth will be dominated by the repowering of small hydropower plants of up to 10 MW. There are high potentials above all in the western Alpine federal states and along the Danube in Upper and Lower Austria. The potential of large hydropower plants has been largely exhausted. In the Austrian hydropower industry, there were 6784 employees in 2016.
To the west, on the B 258, is the Schleiden-Schöneseiffen wind park with 18 wind turbines. In 2014–2015, 12 of the 17 generators underwent a repowering from the Tacke TW 1.5 and were replaced by 13 Enercon E-101s. Together with the remaining Enercon E-82 E2s and the remaining five Tacke TW 1.5 MW turbines the wind farm has a total capacity of 49.45 MW, making it one of the seven largest in North Rhine-Westphalia.
Because most emissions from wind, solar and nuclear are not during operation, if they are operated for longer and generate more electricity over their lifetime then emissions per unit energy will be less. Therefore their lifetimes are relevant. Wind farms are estimated to last 30 years: after that the carbon emissions from repowering would need to be taken into account. Solar panels from the 2010s may have a similar lifetime: however how long 2020s solar panels (such as perovskite) will last is not yet known.
The tariff structure for onshore wind was basically maintained, but the degression was tightened from 1% to 1.5% to incentivize efficiency improvements. The system services bonus for onshore wind was extended and the repowering bonus was improved. Offshore wind gained through improved early starter provisions. The start of the degression was postponed until 2018, but increased from 5% to 7%. Starter tariffs were increased but now last 8 rather than 12years. Biomass tariffs were lowered by 10–15% on average, particularly for small systems.
Siemens Corporation are also using this technology by combining the gas turbine (GT) in conjunction with the heat recovery steam generator (HRSG) with the steam turbine (ST) and the combined cycle power plants to produce the most efficient power generation facilities. Existing direct-fired plants can utilize this advanced cycle concept by adding a GT and a HRSG. This so-called repowering scheme makes the existing power generation facility equally efficient as modern combined cycle power plant. Siemens Corporation developed two ways in powering these old coal plants.
This allowed the owner to save considerably on a new Hylas. While a former charter boat could have been refitted, in general these are poorly outfitted for cruising and have high engine hours. The presence of high engine hours on chartered Hylas 44's is especially troubling because of the difficulty of repowering. In 1990, Joseph Huang and Dick Jachney joined forces and redesigned the 44 and 47 adding sugar scoop sterns into eventually the 46 and 49 versions. These 46 and 49 Hylases became the mainstay of the CYC fleet.
18-F-0325 Opponents to the application are claiming that the new proposals systemically mischaracterize the nature of the plant as a "repowering", when it is in fact an expansion, with baseload capacity rising 100 MW to 636 MW; and are asserting that air emissions would be impacted. Most importantly, they point out that this is an unnecessary plant, as according to NYISO, the plant is not needed to produce power for the grid. Moreover, it contravenes stated goals of the Climate Leadership and Community Protection Act, passed in July 2019.
The initial tariff was raised, the repowering (when old turbines are replaced by new) bonus (Repoweringbonus) was increased, and an additional system service bonus was granted for specified technical contributions (Systemdienstleistungen or SDL), including the ability to maintain voltage if the transmission grid fails. The tariff for offshore wind was raised substantially. An additional 'early starter bonus' was offered for offshore wind farms entering operation before 2015. In parallel to the EEG, a separate loan program of €5 billion was established, to be administered by the state-owned KfW bank, with the goal of reaching 25GW installed capacity for wind by 2030.
Among the issues he wanted to address are "energy generation and transmission... public transportation... [and] Renewable energy... " Assemblyman Cahill noted equally "ambitious goals for renewable power and energy conservation", especially by funding the State Energy Plan, "mass transit", repowering "Old hydro facilities" and modernizing the states "electric grid". NYSERDA president Francis Murray, Jr. echoed that it was "the most ambitious clean-energy program in the nation". The Power New York Act, enacted in July 2011, re- establishes the Article 10 energy plant siting law, which had expired (sunsetted) over seven years prior. The new law had overwhelmingly favorable editorial support.
The plant's owner has proposed a project to modernize the plant and keep it relevant by constructing a 330 megawatt combined cycle natural gas plant on the site which would be a combined-cycle natural gas unit capable of starting up within 10 minutes as well as a 1.5 MW solar array on the property. The third unit would have the ability to run on liquid fuel during cold periods in the winter when the natural gas pipelines are constrained. This project was reportedly chosen over repowering one of the oil units with natural gas. In 2018 it was sold to private equity firm Ironclad Energy, subsidiary of Stonepeak Infrastructure Partners.
Later Dow (or actually Destec Energy) was able to participate in the DOE-supported repowering of the Public Service of Indiana Wabash power station with an advanced F-class gas turbine burning gas produced by an "E-Gas" gasifier. Unfortunately, Westinghouse did not get the order for the gas turbine from Public Service Co. of Indiana, and the project used a GE Frame 7F. Today the Wabash gasification system is operating on a commercial basis, selling coal- derived gas to the 250 MW Wabash combined cycle power plant. Needless to say, Dow never implemented conversion of their own power generating facilities at any of their Gulf Coast locations.
It involves replacing the existing EO/IR and fire control system with a newer system and a Command and Control (C2) module, repairing the 76mm Oto Melara Compact and 25mm Bushmaster gun on MSI Defence Seahawk mount, and other relevant upgrades. The JCPV Phase 3A Combat Systems Upgrade project was awarded to Ultra Electronics, which installed their Fire Control System and Series 1700 electro-optical targeting system, and the Kelvin Hughes Sharpeye X-band surface search surveillance radar. The ship will undergo further dock works, as it would then be having drydock repairs and repowering works. Apart from the upgrades, additional refits were made to replace the four (4) 7.62mm machine guns with two (2) .
Admet Disposal Lists Australian Bus Fleet Lists In 1980/81, twelve AH760 Swifts were bodied by Domino, Pressed Metal Corporation and Pressed Metal Corporation South Australia for Deanes Coaches and West Bankstown Bus Service in Sydney.Shorelink Australian Bus Fleet ListsBankstown Strathfield Bus Service Australian Bus Fleet ListsWest Bankstown Bus Service Australian Bus Fleet Lists Approximately 50 former London Transport Merlins were exported for further use in Australia.AEC Merlins in Australia Australian Bus Fleet Lists Several former London Transport vehicles were sold to Malta bus where after refurbishment and repowering they remained in service until 2011. In early 1981, ten Swifts recently withdrawn by London Transport were exported to Italy to act as emergency control centres and shelters in the aftermath of the 1980 Irpinia earthquake.
Emissions could be considerably reduced by switching from coal to existing gas-fired power stations, because there is enough generating capacity to shut down all coal-fired power stations and still meet peak energy demand. High interest rates were an obstacle to the construction of solar- power plants in 2019, but a domestic solar panel factory began production in 2020. After upgrading, repowering and adding a small amount of pumped-storage hydroelectricity, there are enough hydropower dams in Turkey to provide dispatchable generation to balance variable renewable energy, even if future rainfall lessens due to climate change. Wind and solar power could expand to avoid carbon lock-in if Turkey's energy policy changed to remove its US$1.6 billion annual fossil-fuel subsidies.
Based on the circumstances such as the move from Concordville, loss of key employees, cultural differences, language barriers and the distant site logistics, the project was considered to be an excellent example of engineering and management teamwork and a significant accomplishment for both Westinghouse and MHI. The 501F program permanently changed the relationship between the two companies, giving each independent and royalty-free manufacturing and marketing rights to the new engine. The prototype 501F engine was built and shop-tested at MHI's turbine factory and development center at Takasago in mid-1989. In 1990, Westinghouse secured an order for the first four 501F units, built in Takasago, from Florida Power and Light Co. for their Lauderdale Station Repowering project, which started operation in mid-1993.
The money had been previously designated for a waste incinerator on Long Island that had never been built. Gov. George E. Pataki speaking at that time said, "This cooperative purchase will recapture an important part of Oyster Bay's waterfront and the area's unique maritime character." Officers and key staff around the time Jakobson's stopped operation were Mr. George J. Hossfeld, President; Mr. John Hossfeld, Shipyard Manager; and Ms. Robin Ritter, Office Manager. The publication Worldwide ship and boat repair facilities published around the time of closing described the firm as follows: > Operates vessel repair, upgrades, yacht and small boat repowering and full > service boat marina facility. With 2 marine railways to 235’ and 1,500 LT, > 2,000 feet of total berthing, buildingways, and shops.
From the output of the heat recovery steam generator it is run into a steam turbine which increases electricity production and the overall efficiency of the plant. The gas-fired turbine (GT) and the heat recovery steam generator (HRSG) technology has been in utilize in many repowering projects over the past 20 years in the United States alone. With increasing environmental regulations of the United States Government and the lower fuel prices made the usage of GT/HRSG an option in utilizing to renew many old coal heating power plants. This modern gas turbines operate with higher efficiencies and adding a heat recovery steam generator (HRSG) raises overall plant efficiency to 40 percent to 50 percent (HHV) above the range of most coal-fired plants, reducing fuel consumption and lowering plant emissions.
Following the introduction of the W501A in 1967/68, Westinghouse technology quickly continued to evolve as turbine inlet temperatures increased by means of improved internal cooling and advanced metallurgy, and pressure ratios increased with improved compressor designs. Over the period from 1968 to 1975, the W501 progressed from the W501A (~40 MW), W501AA (~60 MW), W501B (~80 MW) and the W501D (~95 MW). The next major redesign was the W501D5, introduced in 1981, initially at a rating of 96.5 MW (growing to 107 MW (gross) ca. 1985). In 1995, the W501D5A upgrade was offered with a rating of 120 MW. In the late-1980 and early-1990s, Westinghouse introduced the advanced 501F, initially rated at 150 MW (nominal). The first commercial start-up date for the 501F was in 1993 (four units, installed at the Florida Power & Light Lauderdale Station repowering project).
As a result, they mainly have to rely on April (either via Turtle-com, or Channel 6 news reports) to inform them of crimes in the city, and to counteract Burne and Vernon's smear and bad-tempered campaigns against them with her own news coverage of the Turtles, portraying them as a force for good. Reluctant to expose themselves to the outside world, the Turtles initially wear disguises whenever they leave the sewers, although this is slowly relaxed as the series progresses and they gain the trust of the broader populace, whom they have saved from Shredder and other villains on many occasions. Shredder, Krang, Bebop & Rocksteady, Baxter Stockman, and their legions of Foot soldiers repeatedly try to destroy the Turtles and take over the world. Much of their quest for world domination hinges on repowering Krang's mobile fortress, the Technodrome, and bringing it to the Earth's surface, as it was either buried deep under New York City (season 1), stuck in Dimension X (seasons 2 and 4), embedded in the Earth's core (season 3), stranded in the Arctic (season 5), or at the bottom of the Arctic Ocean (seasons 6 and 7).

No results under this filter, show 52 sentences.

Copyright © 2024 RandomSentenceGen.com All rights reserved.