Prokurica said he expected an agreement soon on a finish date.
Contract details should include an estimated start and finish date, the payment schedule — never pay your professional the whole sum up front — and specifics on what the contractor's responsibilities are, including whether clean-up and trash removal are included.
Plans for the Dutch flag carrier to say goodbye to the aircraft initially called for a January 2021 retirement date but the reduction in demand from the spread of COVID-19 made it possible for an early finish date.
It is currently undergoing renovation. With limited funding available, there is not a final finish date.
There is also a land train that goes around the Great Orme being refurbished with no finish date yet.
Conversely tasks with a low or zero Criticality Index are much less likely to cause a delay in the project finish date.
In the planning and design stage as of September 2019, construction will have a planned start date of January 2022 and finish date of March 2024.
The redevelopment was being funded through a public private sector funding agreement, as well as the Prince's Regeneration Trust. Work was finally completed in 2008, some months after the original projected finish date was set.
In November 1879, with the tracks only as far as South Park, the company contracted for the initial construction of the Alpine Tunnel, with an expected finish date of July 1, 1880. The following month, the tracks reached to the summit of Trout Creek Pass.
Parks for Texas: Enduring Landscapes of the New Deal. Austin: U of Texas, 1999. Print. A grant from the U.S. Fish and Wildlife Service's Coastal Impact Assistance Program will be funding a $2.6 million construction project for improvements to the site's seawall, with an anticipated finish date of December 31, 2016.
Since documents of an earlier date than November 1192 appear to have been inscribed on blank folios after documents from that year, it is probable that 1192 represents the "finish" date of the original version (or the date of presentation).Kosto, 7-8. It is also possible that the work that had begun as early as 1178 was renewed sometime around 1190-94\.
The levels were to include an exit for Zona Rental station where it was the meeting point of major arteries of the Caracas Metro; Lines L1, L3 and L4. The basement levels also had space for approximately 100 parking spaces. The projected finish date was in 2008, though the use of the tower by the Caracas Metro was never realized.
A new road between Route 1 and San Carlos, using the current Route 35 has been in construction since 2005, approved by the Legislative Assembly in December 1969, the initial plans are from the first half of the 1970s, with designs from 1989. The project was split into three subprojects, with a projected finish date of around 2025, after more than fifty years of the project ratification.
Project management software leveling requires delaying tasks until resources are available. In more complex environments, resources could be allocated across multiple, concurrent projects thus requiring the process of resource leveling to be performed at company level. In either definition, leveling could result in a later project finish date if the tasks affected are in the critical path. Resource leveling is also useful in the world of maintenance management.
Early in the preliminary planning, at a Brussels meeting in June 2005, BBT SE (Brenner Base Tunnel Societas Europae), presented an interim status report. Expectations following the meeting were that the project could be finalized and the pilot tunnel started by 2006. The target for the tunnel to start service was 2015. In 2007 a construction time line with a 2022 finish date was specified in a memorandum signed by the Austrian and Italian ministers of transport.
The work proved to be challenging, with a large number of culverts having to be installed and high levels of insurgent activity in the area. One local contractor refused to work because of security issues, which resulted in the project being delayed from its original finish date of July to October 2010. Responsibility for security of the road and its extension passed from the Coldstream Guards to the 1st Battalion Royal Gurkha Rifles Battle Group (RGR) in April 2010.
Lewis Creek article from the Hendersonville Times-News The North Carolina Ecosystem Enhancement Program has been contracted to conduct stream restoration on the portion of Lewis Creek running through the nature park. The finish date of this project has been delayed from the original estimation of August 2008. Due to the fragile and unique nature of the park, it is not open to the general public, but Conserving Carolina does hold tree planting and exotic invasive species removal workdays there.
The construction was revealed to be delayed because the company supplying the bricks did not have their plant properly set up initially. The construction was expected to be uninterrupted during the 1904 summer. By mid-July, it was thought that the construction of the gym would be completed in the fall. An update in November on construction was published by The Evening Tribune, where it stated that the building was coming along rapidly, but the new target finish date was in February 1905.
Original plans estimated the finish date for Eurovea Phase II in 2007 or 2008, but the construction was postponed mainly because of the Great Recession. Peter Korbačka, Chairman of J&T; Real Estate and partner of J&T; Finance Group, acquired the complex through the Cypriot company Trenesma Limited for €364 million in the summer of 2014, becoming the largest real estate transaction in Central and Eastern Europe at that time and according to the weekly Trend probably the largest ever in the history of Slovakia.
This, among other problems such as the government delay in giving full control of the arena and Publimax rejecting any investment until control was fully given (which happened in July 2002), caused the project to restart by the end of 2002 with an estimated finish date by the first trimester of 2004. However, by the last trimester of 2003 the project was almost completed and the first event in the arena took place on Thursday November 27, 2003, with a concert performed by Mexican singer-songwriter Juan Gabriel.
Later that month, however, those plans changed; Starwood sued Hilton, claiming trade-secret theft and essentially killing the Denizen brand. In June 2009, 400 homeowners filed a lawsuit against the developers, claiming breach of contract and seeking refunds for their deposits. They believed that the projected finish date of June 2010 was unrealistic and expressed fear that the developers might turn the condo rooms into hotel rooms only or "finish the building as a shell and not do any interior work." In April 2010, it was announced that the Cosmopolitan would open in stages, beginning in December and ending in July 2011.
The building would be reduced to 20 stories and would be moved farther away from the water, in addition to occupying 30 percent less land. The new finish date was tentatively projected to 2021. In addition, Bucheit also added plans for a surrounding neighborhood around the main tower complete with two 6-story apartment buildings, a cluster of 3-story townhouses, and more public space. However, in light of the COVID-19 pandemic, continued resistance from the plaintiffs, and an inability to secure public funding from the city, the project was suspended indefinitely in March 2020.
It is well established that liquidated damages for breach of contract are void if they seek to punish rather than to compensate for loss. For a contractual "penalty" clause to be valid, one must show that it was drawn up after a bona fide attempt to estimate loss in advance of the breach. For example, a motorway construction contract may have an estimated finish date with a "penalty clause" for every day late; but provided that this date is realistic and the "penalty" is a reasonable approximation of loss, the clause will be valid. The validity of the clause will be advanced if there is an equivalent bonus for finishing early.
Although the road across the runway is to remain in place, for exceptional, specific, or emergency use, it will not be available for routine day-to-day use by private vehicular traffic. Pedestrians will not be required to travel via the new road/tunnel, and will continue to cross the runway at the present location. A prolonged litigation between the Government of Gibraltar and contractor OHL over the delay was resolved in June 2016 with an agreement for OHL to complete the works at a price of £24 million and a projected finish date of November 2018. A new dual-carriageway is also being built.
The Woodsmith Mine Tunnel (also known as a Mineral Transport System [MTS]) is a long tunnel that will stretch between Woodsmith Mine at Sneatonthorpe near Whitby in North Yorkshire and the Wilton International complex on Teesside, England. The tunnel has been in development since 2016, but cutting of the tunnel bore did not start until April 2019, with an expected finish date of 2021. By the end of July 2020, over of tunnel had been dug out. When finished, the tunnel will be the longest tunnel in the United Kingdom and will also house the longest conveyor in the UK.Whilst the Channel Tunnel is underground for , it is not wholly within United Kingdom.
Although the projected date of the summer of 2008 passed, the Palisades Interstate Park Commission and Orange County Department of Highways did not open the highway. On April 3, 2009, over one year since the closing of the highway, the Commission, Department of Highways (in conjunction with the New York State Department of Transportation) reported that the construction to fix the safety concerns near Little Long Pond would cost $300,000 (2009 USD). The construction report said the probable finish date for the project is December 1, 2009. The construction was, in fact, completed in December 2009 which also included the reconstruction of a second culvert connecting the northern and southern portions of Lake Kanawauke, located approximately 1/2 mile east of the failed culvert.
In August 2010, it was announced that the target finish date for the first phase had been put back to the beginning of the 2011–12 rugby union season with the full redevelopment planned to take several years. The new east stand was opened in October 2011, and named the Bisley Stand for sponsorship purposes. In May 2012, it was agreed that Newport County football club would move from Newport Stadium and play its home fixtures at Rodney Parade as part of an initial three-year deal, meaning that the stadium would host association football matches on a regular basis for the first time. In February 2013, Newport County agreed a further 10-year lease to play at Rodney Parade.
Donizetti managed to retrieve the score of L'ange de Nisida from Joly's company and reworked it as La favorite (now more commonly known by its Italian title, La favorita) in September 1840 for a December premiere in Italy. To circumvent the Italian censors Donizetti agreed to plot modifications; La favorite is about a medieval King of Castile. A souvenir libretto from La favorita The presence and influence of L'ange is evident in Donizetti's autograph score of La favorite, which features "large chunks" of L'ange "cut up and interleaved" in which new character names and text for La favorite overwrite the old. The final page of L'ange was used as the final page of La favorite; therefore, both operas bear the same finish date on the last page.
Chess problem #35 Alfonso also had the Libro de ajedrez, dados, y tablas ("Libro de los Juegos" (The Book of Games)) translated into Castilian from Arabic and added illustrations with the goal of perfecting the work. It was completed in 1283.. Although Musser Golladay is not the first to assert that 1283 is the finish date of the Libro de Juegos, the a quo information compiled in her dissertation consolidates the range of research concerning the initiation and completion dates of the Libro de Juegos. The Libro de juegos contains an extensive collection of writings on chess, with over 100 chess problems and chess variants.Wollesen, Jens T. "Sub specie ludi...: Text and Images in Alfonso El Sabio's Libro de Acedrex, Dados e Tablas", Zeitschrift für Kunstgeschichte 53:3, 1990. pp. 277–308.
The moving of the de facto bus station and the transfer point for the former City of Poughkeepsie Transit and the current Dutchess County Public Transit bus systems to the Market Street end of the mall also softened the sting to some degree. Even with this minor success, the mall was beset with various access problems. The number of legal parking spots in the vicinity of the Main Mall were too few to handle even a moderate number of people. Delays in the construction of the Route 44/55 arterial pushed its finish date to 1979 which, coupled with the closure of Main Street in that area, made access to the area very difficult and led to frequent congestion of side streets not equipped to handle such traffic.
A widening project of 107 km from two lanes to four lanes, two in each direction, starting at the junction with Route 4 at Frío river to Puerto Limón district center, was awarded to China Harbour Engineering Company (CHEC) in November 2017, with works starting in April 2018, and plans to deliver the widened road in October 2020. However, due to delays from expropriations, lack of tree cutting environmental plans and of designs at the start date, required utilities pipelines relocation, archaeological studies at five locations, and also cultural and language barriers, the finish date has been moved many times. Among the works, nine of the thirty two existing bridges will be completely rebuilt, thirteen new interchanges, twenty four pedestrian bridges and five junctions at Frío river, Guápiles, Siquirres, Moín and with Route 257 that links with APM Moín Container Terminal (TCM).
The game of astronomical tables, from Libro de los juegos The Libro de los Juegos ("Book of games"), or Libro de axedrez, dados e tablas ("Book of chess, dice and tables", in Old Spanish), was commissioned by Alfonso X of Castile, Galicia and León and completed in his scriptorium in Toledo in 1283,Sonja Musser Golladay, "Los Libros de Acedrex Dados E Tablas: Historical, Artistic and Metaphysical Dimensions of Alfonso X’s Book of Games" (PhD diss., University of Arizona, 2007), 31. Although Golladay is not the first to assert that 1283 is the finish date of the Libro de Juegos, the a quo information compiled in her dissertation consolidates the range of research concerning the initiation and completion dates of the Libro de Juegos.Wollesen, Jens T. "Sub specie ludi...: Text and Images in Alfonso El Sabio's Libro de Acedrex, Dados e Tablas", Zeitschrift für Kunstgeschichte 53:3, 1990. pp. 277–308.
They hosted many Rams Club and alumni meetings around the state, where they presented a model of the building while Smith and Bowles spoke to the attendees. Swofford stated during the campaign: "The key factor, of course, was the job that Dean has done with basketball here and the respect people hold for his program." A proposition was made to the student body for a fee increase to be applied to help cover building costs and that increase would maintain the seating arrangements as they were in Carmichael, but it was voted down. Following the Tar Heels' victory in the 1982 NCAA championship game, donations increased, which Rams Club vice president Neal Harrell stated "couldn’t have come at a better time..." On April 17, 1982, after half the desired amount had been raised, ground was broken for the venue, with a target finish date of December 1984.
In January 2020 all Smart Motorway Projects were put under review due to concerns about their safety, during this period no new Smart Motorways could open, the review was published on the 12th March 2020 and required no immediate amendments to the design or construction, however new technology to detect static vehicles is required to be fitted within 3 years, and a review on spacing of Emergency Refuge Areas to be carried out in due course. The fourth lane was opened to traffic on 2nd April 2020, however with a temporary 50 mph speed limit, works are scheduled to take place until July 2020 to finish installation of technology, signs followed by testing and commissioning of the technology before the project is completed and can run at National Speed Limit. The upgrade work has overrun with the 50 mph speed limit and regular overnight closures remaining in place well into September 2020 with, as yet, no confirmed finish date.