Sentences Generator
And
Your saved sentences

No sentences have been saved yet

68 Sentences With "de energized"

How to use de energized in a sentence? Find typical usage patterns (collocations)/phrases/context for "de energized" and check conjugation/comparative form for "de energized". Mastering all the usages of "de energized" from sentence examples published by news publications.

The fire allegedly took place after Tesla de-energized the roof.
One of the fires happened months after the system was de-energized, Walmart said.
The sign was "de-energized" after 80 firefighters responded to the building, the spokesperson said.
That is in part why it "de-energized" its buildings — stopped using Tesla's product — after it ran into trouble.
Once the power line was de-energized, pilot Thomas Koskovich, 65, of Shakopee was rescued, the news release said.
BS: The definition I use is that you're having interactions with someone who leaves you feeling demeaned, de-energized and disrespected.
After the fire, PG&E took the Caribou-Palermo complex off-line and, in December, de-energized all 56 miles of the line.
That transmission line was not supposed to be "de-energized" because it was not part of the public safety power shutoff, according to the company.
In the lawsuit, it asks for the court to require Tesla to remove all of its systems from Walmart stores, which are now all de-energized.
Tricia Taskey Modifica, a representative for Eversource's Connecticut operations, confirmed that Eversource de-energized the cable so that the family could get out of the car.
Once the high winds subside, PG&E will inspect the de-energized lines to ensure they were not damaged during the wind event, and then restore power.
There are a lot of academic definitions, but here's how I define it: An asshole is someone who leaves us feeling demeaned, de-energized, disrespected, and/or oppressed.
By 2007, hundreds of careful studies had showed that "certified a**holes" (people who routinely leave others feeling demeaned, de-energized, and disrespected) undermine their colleagues' health and productivity.
The company that operates the plant, Calpine, "de-energized" its local power line system before the fire started, Calpine vice president of external affairs Brett Kerr said in a statement to CNN.
The reason that I have this definition of assholes as somebody who makes you feel demeaned, de-energized, and so on is that you've got to take responsibility for the assholes in your life.
After a fire in 2007, the utility installed steel power poles, a new weather monitoring system, and de-energized lines on windy days — all things that PG&E could have been doing for years, Hall said.
The difference with its third-generation MX Master mouse is that rather than using a motor and a mechanical contact to achieve this effect, the mouse uses magnets that are energized and de-energized using small spikes of electricity.
"  PG&E urged customers to prepare for a shutoff lasting 48 hours or longer, noting that "power cannot be restored until the dangerous weather has passed, safety inspections of de-energized lines are complete, and damage to the system has been repaired.
Dockside power hookups often have integrated or nearby breakers by which the source can be de-energized.
For example, a higher-voltage distribution level circuit may feed several lower-voltage distribution circuits through transformers. If the higher voltage circuit is de-energized, but if lower- voltage circuits connected remain energized, the higher voltage circuit will remain energized. Another problem can arise when de-energized wires become energized through electrostatic or electromagnetic induction from energized wires nearby. All live line work PPE must be kept clean from contaminants and regularly tested for di-electric integrity.
An induction generator usually draws its excitation power from an electrical grid. Because of this, induction generators cannot usually black start a de- energized distribution system. Sometimes, however, they are self-excited by using phase-correcting capacitors.
When the called party answers by taking the telephone handset off the switchhook, the subscriber's telephone draws direct current from the central office battery. This current is sensed by the line card and the ringing relay is de-energized.
Because it involves transfer of significant amounts of energy, backfeeding must be carefully controlled and monitored. Personnel working on equipment subject to backfeeding must be aware of all possible power sources, and follow systematic protocols to ensure that equipment is fully de-energized before commencing work, or use special equipment and techniques suitable for working on live equipment. When working on de-energized power conductors, lineworkers attach temporary protective grounding assemblies or "protective ground sets", which short all conductors to each other and to an earth ground. This ensures that no wires can become energized, whether by accidental switching or by unintentional backfeeding.
The railway operator is National Railways of Zimbabwe. Total: 3,427 km (2012). Narrow gauge: 3,427 km at gauge, 313 km of which is electrified (de-energized due to problematic power supply in 2008) (2002). Note: this includes the 318 km Beitbridge Bulawayo Railway company line.
The new tunnel and electrification reduced the mainline by , eliminated of elevation and of snow sheds. Electric locomotives handled mainline freight and passenger trains on this section exclusively. The route was de-energized and catenary dismantled in 1956, after the Cascade Tunnel was fitted with ventilation fans.
Entry-level cable testers are essentially continuity testers. A continuity tester is an item of electrical test equipment used to determine if an electrical path can be established between two points; that is if an electrical circuit can be made. The circuit under test is completely de- energized prior to connecting the apparatus.
If the opposite line is de-energized, this voltage transient may trip supply breakers. If the line is under maintenance, injury may occur as the catenary is suddenly energized. Even if the catenary is properly grounded o protect the personnel, the arc generated across the pantograph can damage the pantograph, the catenary insulator or both.
S.R. 156, S.R. 157 and S.R. 158 were closed. An evacuation center was established by the American Red Cross at James H. Bilbray Elementary School in Las Vegas, however it closed by the afternoon of June 29. Power lines on Mount Charleston were de-energized by NV Energy, impacting 450 customers. An air quality alert was issued for the Las Vegas Valley.
When the coil becomes de-energized, it releases the core, and fluid is forced back into the hollow area of the core through the check valve, so the fluid is used again next time the coil is energized. Hydraulic action timers are usually designed for a specific time, which is set in the factory during their manufacture. These timers are also very reliable.
The New York City Fire Department sent over 125 firefighters to the scene to assist in the rescue. EMS workers were delayed getting to some victims while they waited for the third rails to be de-energized. All service on the Hudson Line was suspended as a consequence of the accident. The nearby West Side Line was reopened to Amtrak trains by 3 p.m.
A lamp and battery can be used to test for contact closure or wire continuity. Care must be taken to ensure that all circuits are completely de- energized before use of a continuity tester lamp, or the lamp will be destroyed. Sometimes a flashlight (torch) is field-modified or factory- manufactured with test leads, to allow the flashlight to be used as a continuity tester.
Upon energization of the lines there could be high inrush current which may lead the fault indicators to false operation. Some fault indicators can block inrush current. Advanced fault indicators should monitor the live line to distinguish fault currents from usual current surges. They operate only after making sure of the feeding circuit breaker/fuse has cut the power flow and the line is de-energized.
This type of equipment is directly linked to the reliability of the electricity supply. The earliest central power stations used simple open knife switches, mounted on insulating panels of marble or asbestos. Power levels and voltages rapidly escalated, making opening manually operated switches too dangerous for anything other than isolation of a de- energized circuit. Oil-filled switchgear equipment allow arc energy to be contained and safely controlled.
In telecommunication, release time is the time interval for a circuit to respond when an enabling signal is discontinued, for example: #in an automatic gain control or echo suppressor circuit, the time interval between the end of the enabling signal and the instant at which suppression ceases, #for a relay, the time between when the coil is de-energized, and the instant that contact closure ceases or is established.
Animated cut through diagram of a typical fuel injector (click to see animation) Delphi E1 UI on the Volvo D13A engine Delphi E1 unit injector parts The basic operation can be described as a sequence of four separate phases: the filling phase, the spill phase, the injection phase, and the pressure reduction phase. A low pressure fuel delivery pump supplies filtered diesel fuel into the cylinder head fuel ducts, and into each injector fuel port of constant stroke pump plunger injector, which is overhead camshaft operated. ;Fill phase: The constant stroke pump element on the way up draws fuel from the supply duct in to the chamber, and as long as electric solenoid valve remains de-energized fuel line is open. ;Spill phase: The pump element is on the way down, and as long as solenoid valve remains de-energized the fuel line is open and fuel flows in through into the return duct.
When the engine cutoff signal was received by the electrical control package, it de-energized the main-stage and ignition phase solenoid valves and energized the helium control solenoid de-energizer timer. This, in turn, permitted closing pressure to the main fuel, main oxidizer, gas generator control, and augmented spark igniter valves. The oxidizer turbine bypass valve and propellant bleed valves opened and the gas generator and LOX dome purges were initiated.
Schuylkill Arsenal Railroad Bridge is a wrought iron, two-track, deck truss swing bridge across the Schuylkill River between the University City and Grays Ferry neighborhoods of Philadelphia, Pennsylvania. It was built in 1885–86 by the Pennsylvania Railroad. Today, its swing span has been fixed shut, and the electrical catenary de-energized. The bridge is named for the Schuylkill Arsenal, which operated from 1799 to 1926 near the bridge's eastern approaches.
TurnOn is a single player video game developed by Brainy Studio LLC. 1st demo episode was launched on Windows Phone, Xbox One (as a member of ID@Xbox) and Steam (got Greenlit April 17, 2015TurnOn has been Greenlit!) will get a full version of the game on June 1, 2016.E3 brings 124 new trailers! The main character is an alien electrical spark named Turnon, which should return the electricity to the unexpectedly de-energized city.
The amount of delay that this produces is determined when it is manufactured. Slow-break displacement timers work in the same way as delayed-make displacement timers only that when the coil is de-energized, the plunger rises to its original position, and mercury flows through the orifice to reach outside level. when it falls below the lip of the ceramic cup, electrical contacts become open. Its physical size is used to regulate the delay time of connection break.
Lineman replacing a transformer, wearing protective gear, including rubber gloves and sleeves Power linemen work on electrically energized (live) and de-energized (dead) power lines. They may perform several tasks associated with power lines, including installation or replacement of distribution equipment such as capacitor banks, distribution transformers on poles, insulators and fuses. These duties include the use of ropes, knots, and lifting equipment. These tasks may have to be performed with primitive manual tools where accessibility is limited.
Hazard controls for electrical injury include assuming all power lines are energized until confirmation they are de-energized, and grounding power lines to guard against electrical feedback, and using appropriate personal protective equipment. Proper respiratory protection can protect against hazardous substances. Proper ventilation of an area is an engineering control that can be used to avoid or minimize exposure to hazardous substances. When ventilation is insufficient or dust cannot be avoided, personal protective equipment such as N95 respirators can be used.
On overhead wires designed for trolley poles this is done by having a neutral section between the wires, requiring an insulator. The driver of the tram or trolleybus must temporarily reduce the power draw before the trolley pole passes through, to prevent arc damage to the insulator. Pantograph-equipped locomotives must not run through a section break when one side is de-energized. The locomotive would become trapped, but as it passes the section break the pantograph briefly shorts the two catenary lines.
Documentation of the annual rent amount paid by Central Hudson to Conrail prior to the Miller bridge purchase is located in New York State Public Service Commission records; in Court documents for the case of Consolidated Rail Corporation v. Central Hudson Gas & Electric Corporation (cited in Footnote 9); and in Poughkeepsie Journal news stories in 1984-5. Central Hudson de-energized those power lines and relocated them under the river by early 1985, thereby ending Miller's only source of bridge income.
Sector T137 is scheduled for adjustment, and a Clerk is supervising a canine Summoner to ensure real estate salesman Ed Fletcher is inside Sector T137 during the process. An 8:15 bark to summon a Friend With A Car is needed. Unfortunately, a one-minute delay in the bark prompts the appearance of an Insurance Salesman, causing Fletcher to leave for work late. Arriving at Sector T137 after it has been de-energized, Fletcher enters a terrifying gray ash world.
Since developing the smallest coreless motor of the time in 1973, Adamant Namiki has been consistently producing miniature DC coreless motors. The core components have evolved with high-precision processing technology and a more optimal magnetic circuit has produced a high-efficiency motor. In 2009, Adamant Namiki successfully developed the world’s smallest DC brushless motor at 0.6mm in diameter. The company also produces motor units such as its de- energized locking system, micro robot servo, multi-finger robotic hand, and micro mechanisms.
Hazard controls for electrical injury include assuming all power lines are energized until confirmation they are de-energized, and grounding power lines to guard against electrical feedback, and using appropriate personal protective equipment. Proper respiratory protection can protect against hazardous substances. Proper ventilation of an area is an engineering control that can be used to avoid or minimize exposure to hazardous substances. When ventilation is insufficient or dust cannot be avoided, personal protective equipment such as N95 respirators can be used.
Overhead power lines are easiest to diagnose since the problem is usually obvious, e.g., a tree has fallen across the line, or a utility pole is broken and the conductors are lying on the ground. Locating faults in a cable system can be done either with the circuit de-energized, or in some cases, with the circuit under power. Fault location techniques can be broadly divided into terminal methods, which use voltages and currents measured at the ends of the cable, and tracer methods, which require inspection along the length of the cable.
In electrical engineering, a disconnector, disconnect switch or isolator switch is used to ensure that an electrical circuit is completely de-energized for service or maintenance. Such switches are often found in electrical distribution and industrial applications, where machinery must have its source of driving power removed for adjustment or repair. High-voltage isolation switches are used in electrical substations to allow isolation of apparatus such as circuit breakers, transformers, and transmission lines, for maintenance. The disconnector is usually not intended for normal control of the circuit, but only for safety isolation.
A much more stable system can be found by using a "quadrature" sequence. As at any time two coils are energised, First, stator poles A0 and A1 are energized. Then stator poles of B0 and B1 are energized which pulls the rotor so that it is aligned in between A and B. Following this A's stator poles are de-energized and the rotor continues on to be aligned with B. The sequence continues through BC, C and CA to complete a full rotation. This sequence can be reversed to achieve motion in the opposite direction.
Loop wiring is radial wiring in lighting circuits where junctions are made at ceiling roses with line and switched line wires. ;Ring, or ring final circuit (RFC): A ring circuit is a UK standard means for wiring domestic and other light commercial premises, not often seen elsewhere in the world; in effect it is a radial circuit whose final termination is made back to the originating distribution board, rather than at the last outlet or device serviced. ;De-energized circuit: Circuit that is isolated from power and not at a potential different from earth. Note the difference to permit to work.
When any 2 of the 3 circuit paths are activated (due to sensing the need for emergency reactor trip), the direct current-controlled clutches that keep each control-rod in the storage position are de-energized. The result is that each control-rod is inserted into the calandria, and the reactor heat output is reduced by 90% within 2 seconds. Safety Shutdown System 2 (SDS2): SDS2 is also designed to rapidly and automatically terminate reactor operation. Gadolinium nitrate (Gd(NO3)3) solution, a neutron-absorbing liquid that shuts down the nuclear chain reaction, is stored inside channels that feed into horizontal nozzle assemblies.
Voltages higher than those that can be worked using gloves are worked with special sticks known as hot-line tools or hot sticks, with which power lines can be safely handled from a distance. Linemen must also wear special rubber insulating gear when working with live wires to protect against any accidental contact with the wire. The buckets linemen sometimes work from are also insulated with fiberglass. De-energized power lines can be hazardous as they can still be energized from another source such as interconnection or interaction with another circuit even when they appear to be shut off.
To detect successful trapping the ALPHA trap magnet that created the minimum B-field was designed to allow it to be quickly and repeatedly de-energized. The currents' decay during de- energization has a characteristic time of 9 ms, orders of magnitude faster than similar systems. This fast turn-off and the ability to suppress false signal from cosmic rays should allow ALPHA to detect the release of even a single trapped antihydrogen atom during de-energization of the trap. In order to make antihydrogen cold enough to be trapped the ALPHA collaboration has implemented a novel technique, well known from atomic physics, called evaporative cooling.
In a stepper motor an internal rotor containing permanent magnets or a magnetically soft rotor with salient poles is controlled by a set of external magnets that are switched electronically. A stepper motor may also be thought of as a cross between a DC electric motor and a rotary solenoid. As each coil is energized in turn, the rotor aligns itself with the magnetic field produced by the energized field winding. Unlike a synchronous motor, in its application, the stepper motor may not rotate continuously; instead, it "steps"—starts and then quickly stops again—from one position to the next as field windings are energized and de-energized in sequence.
A loss of electrical power in the plant occurred on March 20, 1990. At 9:20 a.m., a truck carrying fuel and lubricants in the plant's 230 kV switchyard backed into a support column for the feeder line supplying power to the Unit 1-A reserve auxiliary transformer (RAT). At the time, the 1-B RAT was de-energized for maintenance and RAT 1-A was powering both trains of emergency electrical power. The non-emergency electrical trains were being powered by back-feeding from the switchyard through the main step-up transformer to the 1-A and 1-B unit auxiliary transformers (UAT).
This lower pressure air is supplied to the front of the bolt, and the regulator is adjusted to supply enough force to push the bolt back against the supply pressure. When the solenoid valve is energized the air in front of the bolt vents, allowing the bias supplied to the rear of the bolt to move it forward. When the bolt has moved forward enough to seal the breech, the pin unseals from the powertube it rides in, and air is vented through the bolt to the ball, firing it. When the solenoid valve is de-energized, air is again supplied to the front of the bolt to return it.
Standard personal protective equipment for fire cleanup include hard hats, goggles or safety glasses, heavy work gloves, earplugs or other hearing protection, steel-toe boots, and fall protection devices. Hazard controls for electrical injury include assuming all power lines are energized until the power provider confirms they are de-energized, and grounding power lines on both the load- and supply-sides of the work area to guard against electrical feedback if a portable generator is turned on elsewhere in the power grid. Appropriate personal protective equipment includes rubber gloves, dielectric overshoes, and insulated sticks and cable cutters. Proper respiratory protection can protect against hazardous substances.
A significant feature of the interlock is that the key is held or trapped in one position of the lock. Releasing the key indicates that the interlocked device has been made safe; the interlocked device cannot be re- energized until the key has been returned and operated to retract the bolt. Some complex sequences use key exchange blocks or boxes, that allow alternative sequences of operation. Interlock devices may have an electrical solenoid which holds the key until an electrical circuit is interrupted; for example, the power supply for a high-voltage cabinet has been de-energized, releasing a key to allow access to the interior of the cabinet.
After the early October power shutoffs, the CEO of PG&E; stated that they found more than 100 cases of "wind-related damage" to the 25,000 miles of power lines they had de-energized. He also stated "More than half of PG&E;’s 70,000-square-mile service area in Northern and Central California is considered by state officials to be at high risk of wildfire. In 2012, that designation applied to just 15% of our service area." By the end of October, PG&E; officials told a federal judge that the power shutoffs so far helped prevent up to 56 wildfires; 44 from contact with vegetation and 12 cases of wind-caused equipment damage.
Fletcher is allowed to return without being de-energized and adjusted, on the condition that he tell no one the truth he has learned, and convinces his wife that everything he has already told her was due to a temporary psychological fit. The Old Man threatens him that should he fail doing so, he will have a terrible fate when they meet again; and he adds that every person eventually meets the Old Man. On his return, Ruth catches him lying about where he spent the afternoon and demands he tell her the truth, while he tries to stall her long enough to come up with a story she will believe. A bark is heard and a vacuum cleaner salesman rings the doorbell.
Jamie Wallace, in the second car, said that passengers there initially tried to come to the aid of those in the front car, but "we could not get the head car doors open for some reason - it was jammed." After failed efforts to break the door open, "[a] number of us started smelling fumes from the car, the fuel, and we said, 'You know what, we need to get out.'" Due to disruptions in the railroad's electrical system created by the accident, the third rails were not completely de-energized immediately. Damage to a transition jumper isolated the rail on the east of the track, south of the intersection, from its counterpart west of the track and north of the intersection.
The fact that the weapon only fed from a drum containing 1,500 rounds of ammunition meant that a slower rate of fire was desired.United States, 1969. p. G-1 The second set of subvariants, designated XM18E1 (and standardized as the M18) and SUU-11A/A, featured an aircraft-to-pod electric connection, allowing aircraft internal power to be used in providing better starting torque, a de-energized solenoid allowing for better round clearing at low rates of fire, and circuitry that allowed for selectable rates of fire. The options were either 2,000 rpm or 4,000 rpm, both significantly lower than the base rate of fire.United States, 1969. p. G-3 The last set of subvariants were designated M18A1 (development of the M18E1) and SUU-11B/A.
Two-pole common trip breakers are common on 120/240-volt systems where 240 volt loads (including major appliances or further distribution boards) span the two live wires. Three-pole common trip breakers are typically used to supply three-phase electric power to large motors or further distribution boards. Separate circuit breakers must never be used for live and neutral, because if the neutral is disconnected while the live conductor stays connected, a very dangerous condition arises: the circuit appears de-energized (appliances don't work), but wires remain live and some residual-current devices (RCDs) may not trip if someone touches the live wire (because some RCDs need power to trip). This is why only common trip breakers must be used when neutral wire switching is needed.
The panel uses a stacked bus system that protects the energized bus from accidental contact and the breaker can be easily installed using a flat blade screwdriver contacting only de- energized parts of the backplane of the panel. The design of the breakers and panel require that extra attention be paid to phase rotation, as the right (even-numbered) side of the panel will have the phases in a C-B-A configuration whereas the left (odd-numbered) side of the panel will have a more standard A-B-C arrangement. Square D also made disconnect switches, both fused, and unfused, as well as Heating Air Conditioning and Refrigeration (HACR) rated switch boxes that held an HACR breaker for use as a disconnect. The QO type breaker fits this disconnect box.
For the next fourteen years, Miller and his successor, Vito Moreno, spent little to nothing on maintenance or insurance; critical bridge navigation lights were mostly inoperative, resulting in large U.S. Coast Guard fines against the Miller corporation that all went unpaid. Further, all of the 2,200-pound brackets that connected Central Hudson's de-energized high-tension power lines to the south side of the bridge continued to deteriorate by rusting. Though Central Hudson admitted that it normally had a legal duty to remove its abandoned power lines, it refused to remove its abandoned bridge-affixed lines, instead relying on a claim that it no longer owned the lines at issue pursuant to prior litigation with Conrail that was decided on September 26, 1984,Consolidated Rail Corporation v. Central Hudson Gas & Electric Corporation, Supreme Court, County of Westchester, State of New York.
However, inside Mexico City itself on the approach to Buenavista Station, a considerable amount of grade separation, including below-grade excavation and new bridges, was necessary due to high density and traffic congestion. The construction elicited complaints by some Mexico City residents who objected to having their neighborhoods split by the rail line, but overall the public has supported the project. In addition to the track, the construction of Tren Suburbano also benefited from like-new electrification infrastructure already in place along most of the route, part of National Railways of Mexico (NdeM)'s Mexico City-Querétaro 25 kV 60 Hz mainline electrification completed in the 1990s but de-energized a few years later after NdeM was privatized. On August 24, 2005, Construcciones y Auxiliar de Ferrocarriles, S.A. (CAF) obtained a 30-year concession to supply rolling stock, build and operate the Tren Suburbano.
Tags left in place in a powerplant after it was shut down, decommissioned, and abandoned Disconnecting or making safe the equipment involves the removal of all energy sources and is known as isolation. The steps necessary to isolate equipment are often documented in an isolation procedure or a lockout tagout procedure. The isolation procedure generally includes the following tasks: # Announce shut off # Identify the energy source(s) # Isolate the energy source(s) # Lock and tag the energy source(s) # Prove that the equipment isolation is effective The locking and tagging of the isolation point lets others know not to de-isolate the device. To emphasize the last step above in addition to the others, the entire process can be referred to as lock, tag, and try (that is, trying to turn on the isolated equipment to confirm it has been de-energized and cannot operate).
A service can go dark for any number of reasons, including financial resources being drained to continue effective operation of the service as being of benefit to its community of license; abandonment for a different channel or to go cable-only; complicated technical adjustments involving radio antenna repair, requiring the broadcast tower to be de-energized for the work to be done; structure fire or natural disaster that has rendered the facility inoperable; or technical adjustments that would make it prohibitively expensive to perform the work and carry on the normal operations of the station in question. The service is not required to notify the FCC of silence if the period of silence is less than 10 days. If the period of silence is to last at least 10 days but less than 30 days, the licensee must notify the FCC in writing explaining why the service is silent and an expected return to the air. A service that expects to be silent for more than 30 days must apply to the FCC using Form 0386, which can be done electronically (preferred method) or by a paper application.

No results under this filter, show 68 sentences.

Copyright © 2024 RandomSentenceGen.com All rights reserved.