Sentences Generator
And
Your saved sentences

No sentences have been saved yet

95 Sentences With "concreting"

How to use concreting in a sentence? Find typical usage patterns (collocations)/phrases/context for "concreting" and check conjugation/comparative form for "concreting". Mastering all the usages of "concreting" from sentence examples published by news publications.

You name it, Moylan did it; from pool plumbing and concreting, to selling security, pest control, upholstery fabric and lift chairs.
It seems likely that the rapid local species turnover is new—probably a result of human activity such as chopping down forests, draining marshes, concreting prairies, damming rivers, and changing climate.
The population of south India's biggest city has more than doubled since the turn of the century as banks, IT consultancies and startups set up bases, concreting over a city of trees, bungalows and lakes once favored by the country's retirees.
Negros Occidental Governor Alfredo G. Marañon, Jr. has committed to support the planned concreting of the runway.
Grocon grew from a small family concreting business established in Victoria, by Luigi Grollo after he emigrated from Treviso in Italy in 1928. A one-man operation, Luigi Grollo set up his own business in 1948 and completed small concreting projects, such as paving, shopping centre car parks, sewerage infrastructure and swimming pools. His sons Rino and Bruno Grollo joined the business at the age of 15. The business expanded rapidly in the 1950s by continuing with concreting of municipal swimming pools and petrol stations in Melbourne.
Work on the foundation began on 4 August 1965 and was finished by the end of 1965. The concreting of the tower foot began on 15 March 1966. The concreting progressed rapidly, so that the 100-metre mark was exceeded on 4 October 1966. The shaft reached its final height on June 16, 1967.
Each cylindrical concrete structure was constructed to in diameter and high. The silos were designed, constructed and equipped with elevators, cleaning plant and driers by a Sydney-based firm Henry Simon Ltd. Constructed using "sliding form" concreting (later known as slip-form concreting) the Kairi Maize Silos is one of the earliest applications of this technique in the construction of maize silos in Australia.
The steelwork for Holmes bridge was supplied by Charles Ross Ltd, who were based in Sheffield, while piling work was carried out by Yorkshire Hennebique Concreting Co Ltd.
The construction contract was let to Fairfield-Mabey and commenced in 1969; Fairfield-Mabey placed a sub-contract with Tarmac Civil Engineering for the foundations, piers and deck concreting works.
Today businesses in Memerambi include 'Stop Shop' general store; clock repairs; large machinery & engineering works; pharmaceutical manufacturing; stock feed store; graziers; concreting & pool construction.Locafy: Local Area Marketing, accessed on 2011-11-13.
CPF liners are secured in place on vertical or inclined surfaces with staples or other fixing devices, having first been tensioned onto the formwork shuttering. Once attached, concreting is performed in the normal way. Release agents are not required as CPF liners easily debond from the concrete during formwork striking. Throughout the concreting process and as a result of concrete pressures, entrapped air and excess mix water that would otherwise become trapped at the surface causing blemishes, can instead pass through the liner.
1, pp. 433-442 This allows concrete to be placed in winter with reduced risk of frost damage.ACI 306R-88: Cold Weather Concreting. Concrete is damaged if it does not reach a strength of before freezing.
JSW Cement is leading the way in promoting PSC variant of cement in South India. Portland Slag Cement (PSC) also known as green cement as it generates least amount of CO2 during production and also generates least heat during concreting. JSW Cement also produces GGBS (Ground Granulated BF slag) which can be used as replacement to Ordinary Portlance cement during concreting and is being widely used in the metropolitan cities mainly by the RMC's.GGBS can replace up to 60% OPC in the concrete mix which also makes economic sense for these RMC manufacturers.
The symbolic groundbreaking ceremony for the extension of the line U5 took place on 21 September 2017, with the concreting of the first diaphragm wall lamella began in early October 2017. Completion of the work is now scheduled for 2022.
Demey, 2007: 238–40 The Berlaymont in 1975. President François-Xavier Ortoli seen in the centre. In 1963, the first wing (north-east) entered its active phase and was scheduled to be finished by the end of 1965. Concreting on that wing was finished in November 1964.
Calcium nitrate is used in set accelerating concrete admixtures. This use with concrete and mortar is based on two effects. The calcium ion accelerates formation of calcium hydroxide and thus precipitation and setting. This effect is used also in cold weather concreting agents as well as some combined plasticizers.
In 1949, Tristan Antico and Kelvin Conley formed Pioneer Concrete in New South Wales. In 1954 a concrete plant was acquired in Canberra. In 1959 it was listed on the Sydney Stock Market as a public company. As well as acquiring further concreting businesses, it diversified into building materials products.
They added interior finishing and precast concreting into their company's brand. Alois married Helga Lehmeier who merged her family’s woodworking and glassworking skills into the Steinhauer business. Alois and Helga decided to immigrate to the United States, as the economy of post-World War 2 Germany was not ideal for their new family.
The programming meant Barrett was always erecting steelwork at least two levels ahead of the concreting team. The erection of steelwork was completed on Phase 2 by the end of 2007. The glass cladding is currently being installed. Kier Group's contract is due to expire when the building is completed in February 2009.
Gaikwad completed the diploma and went on to join the Vishwakarma Institute of Technology to study engineering, where he supported himself by working small jobs like taking tuition classes to painting houses and concreting pathways. In 1994 he joined Telco (now Tata Motors) as a graduate trainee engineer in their Pune plant.
Fabrication of bonded tendons is generally undertaken on-site, commencing with the fitting of end-anchorages to formwork, placing the tendon ducting to the required curvature profiles, and reeving (or threading) the strands or wires through the ducting. Following concreting and tensioning, the ducts are pressure-grouted and the tendon stressing-ends sealed against corrosion.
A supply of 200 poles had been obtained from the Clermont district. Work by the contractor, Edward Morton Limited, proceeded steadily and on 17 September, Council passed for payment asked for the construction of the building and concreting work. The same Council meeting also noted that the installation work was over budget and now looked like costing .
Civil construction works involved six million cubic metres of excavation, two million cubic metres of filling, 850,000 cubic metres of batching and mixing of concrete and placing 100,000 anchors with a total combined length of about . Concreting was done in 3 metre lifts. A service road of 6 metres in width was built on top of the dam.
Various sections of the stone pitched wall show evidence of great effort in terms of shaping and fitting locally sourced stone to produce flat wall surfaces. Sections near the Tate River feature early examples of the concreting of stones to keep them in place as well as large sections blasted out of the bedrock to form the race.
By February the next year, construction had resumed. On 8 April 25 men working on the bridge went on strike. This was of concern due to time dependent concreting being undertaken at that time. As the construction was considered unemployment relief, the constructing authority began to look for men who would do the work in their places.
This work will take place in three phases (1960, 1965 and 1967). Finally, the river is channeled to its mouth with the Saint-Charles River passing under the Cartier- Brébeuf National Historic Site. This work then became part of the concreting of the banks of the Saint-Charles river, which was completed in the 1970s. The river in 2016.
Among his many accomplishments were : concreting of Poblacion to Alabidhan National Road, concreting of Castillanes Street, Cataluña Street, Plaga Street, Derecho Street, Lampino Street, Pagara Street, and Castroverde Street. He also made possible the installation of Municipal streetlights, construction of BNHS Covered Gym, Solar Dyers in Barangays, construction of grand stand and oval of Bingawan Elementary School, acquisition of Payloader, Grader, Ambulance and Nissan Terrano Patrol Car, and the purchase of Lot for the Municipal Dump Site. The remarkable legislation of the Sangguniang Bayan was the Palamangkutanon Sang Banwa ( Citizen's Query) Ordinance. After the May 14, 2007 elections, a new set of Municipal Officials assumed office. This administration is called the “ Young Ones” led by a young, competent and energetic Mayor Matt P. Palabrica and his Vice Mayor Mark P. Palabrica.
Vidyasagar Setu is a toll bridge. It has capacity to handle more than 85,000 vehicles in a day. The design of the bridge differs slightly from other bridges, which are of live load composite construction. The difference is in the dead load design concept adopted for this bridge and concreting of the side spans done with support provided by the intermediate trestle.
The walls were made in formworks. The vault covering with the light niches was built in a special horizontally movable formwork with galvanised steel frames. The vault, 162 metres long, was divided into 18 parts (9 metres each) during the concreting. On January 4, 2011, the government of Moscow announced its plans about completing the stations Borisovo, Shipilovskaya and Zayablikovo until the 4th quarter of 2011.
This work included internal partitioning, boarding up of the skylight, installation of a suspended ceiling, re- concreting the floor, and the remodelling of the front awning. In 1977 the property was transferred to the present owners, who operate a real estate office. Alterations were carried out to enable the letting of various parts of the building. Existing tenants include a coffee shop and a hairdresser.
Friedrich Zollinger, also known as Fritz Zollinger (March 31, 1880 - April 19, 1945) was a German architect, engineer, buildings official and town planner. He served as city architect in Merseburg, and developed the "Zollinger roof" (a timber lamella roofing system), and the no-fines concreting process. Fritz Zollinger was not related to the Swiss architect Otto Zollinger (1886–1970) who worked in Saarbrücken from 1924 to 1944.
The bridge is built to the "Melan System'"' invented by Josef Melan, which gained popularity particularly in the United States and Germany because the bridges could be built without a supporting stage. Rigid truss arches made of iron are set into the reinforced concrete bridge. The load-bearing core of the bridge was the truss iron framework during construction. After concreting this became a part of the supporting structure.
On April 2, 2009, Citra announced the construction on the second stage. By June 2009, new pillars were going up. By May 2010, Stage 2 was 50% done, rotating the highest pierhead in the Sucat area; by July it was 65% done, concreting 134 of the required 238 spans, and started pouring the asphalt overlay. On December 15, 2010, the Bicutan–Sucat portion of Stage 2 opened to the public.
A total of 1,400 rock bolts were used. Despite being delayed by wet weather at the start of the work the excavation of the tunnel was completed on 18 August 1962, within both the time and budget. Work moved to concreting the interior of the tunnel. Concrete for the tunnel was supplied from a temporary concrete mixing plant established by Certified Concrete on a rail siding from the tunnel portal.
In May 2011, funding was approved by the Federal Ministry of Transport. To the east of Würzburg, between Kreuz Schweinfurt / Werneck and Kreuz Biebelried an expansion to six strips in the further need with planning right classified. On 15 June 2016, during the construction of the Schraudenbach valley bridge near Schraudenbach, the shoring collapsed during the concreting of a superstructure section. The accident cost the life of a construction worker.
"Silica" in Ullmann's Encyclopedia of Industrial Chemistry, 2008, Weinheim: Wiley-VCH, . . When burnt completely, the ash can have a Blaine number of as much as 3,600 compared to the Blaine number of cement (between 2,800 and 3,000), meaning it is finer than cement. Silica is the basic component of sand, which is used with cement for plastering and concreting. This fine silica will provide a very compact concrete.
A new access road was also constructed, complementing its facility. Commercial operation by Philippine Airlines commenced in 1952 using a Douglas DC-3 aircraft for routes to and from Cebu City and Zamboanga City. Concreting and expansion of the runway was made in 1974 when a new taxiway and apron was built. A new terminal building was constructed in 1980, relocating the old terminal to where it stands to this day.
In 1995, the people again re-elected Zafiro S. Palabrica as Municipal Mayor. His vice Mayor was Ted Peter P. Plagata and the Sangguniang Members were: Eduardo Dalipe, Sulpicio P. Morales, Leovigilda G. Castroverde, Julious Cerbo, Sammy T. Pormilos, Nonie V. Ysulan, Merlie C. Ocampo, Pedro M. Bacera and Freddie Q. Compas. Mayor Palabrica served as Municipal Mayor until May 10, 1998. Among Mayor Zafiro Palabrica's numerous accomplishments were : the establishment of 11 satellite schools, construction of Barangay Halls and Markets, Municipal Library and Covered Gym, concreting of three (3) major bridges, facilitated the classification of Barangay Road to National Road from Barangay Cairohan to Barangay Poblacion and the concreting of Barangay Poblacion Road to Alabidhan National Road. As a token for his excellence and outstanding performance, he was awarded as the Most Outstanding Mayor of the Philippines Fighting Cock National Award by the Progressive Alliance of Citizens for Democracy and Presidential Assistant on Community Development last January 6, 1991.
Despite the railroad offering extra concessions on the Madison station depot (concrete ballast floors on all bridges and concreting the Waverly Place and Green Village Road crossings). The railroad would also provide drainage and sewers at Prospect Street and Green Avenue along with some property on Kings Road. President of the Lackawanna Railroad, William Truesdale offered these changes only if the borough accepted them after complaints. However, this was turned down by the borough.
Regular Top Gear hosts Jeremy Clarkson, James May and Richard Hammond take over sportsman Steve Redgrave's garden, to dispense advice on creating a zero maintenance lawn, installing an impressive water feature and getting rid of unwanted plants. Naturally, disaster ensues. Top Ground Gear Force was then included as a page in the 2009 Big Book of Top Gear, giving advice to garden problems including concreting the garden over, petrol bombs and flash fires.
PC Harrington is doing the excavation and the concreting of the base whilst Altius will commence the main construction works. The crane base for TC1, the second tower crane, was delivered to the site on 30 January 2008. The crane was assembled on 16 February, however, not to the anticipated . The slipform structure was assembled on 14 April 2008 and construction of the core for the residential tower commenced on 23 April 2008.
Apart from the Christian Schild and 60 engineers of the Alpine Slovakia and contractors of civil engineering works of the project, some 1200 Bulgarian workers were involved in its construction at one point. Work was carried out continuously, involving 535,000 cubic metres of concrete delivered by a crane of 26 tons capacity, which was erected across the river over the dam. The concreting of the dam began in October 2007 and was completed in January 2010.
Sections at the eastern end of the race are damaged in large part due to changes over time in the course of the Tate River. Much of the race here is now situated within the ephemeral riverbed. However, this section of the race still features large sections of drystone wall, some of which has been fixed in place through the concreting of blocks, as well as large sections cut or blasted out of the bedrock to form the race.
The Silos are topped with an elongated corrugated iron elevator tower which adds further to the Silos as a landmark in this landscape. The place is important in demonstrating a high degree of creative or technical achievement at a particular period. The Kairi Maize Silos demonstrate a high degree of technical achievement as they were constructed using slip form concreting. This represents one of the earliest applications of this technique to the construction of maize silos in Queensland.
Sambell was born in 26 November, 1945 to Ivy Irene (née Haynes) and Donald George Sambell (1918-1984). He has an older brother and two younger sisters and grew up in Gawler, South Australia. By the early 1960s he was an accountant for a concreting business in Adelaide. In 1965 Sambell started dating Bev Harrell, whom he would later manage, a pop singer, who briefly joined Adelaide-based pop-rockers, the Clefs, in 1966 as co-lead vocalist.
Asked how is that a priority when one third of Belgrade still has no sewage system, Mali said that both the sewage and the mast are needed. Dragoljub Bakić, member of the Serbian Academy of Architecture, said that the city government treats Belgrade as the "prey" they won, labeling their politics as an "urban reality show as they bomb us every day with some other nonsense". Bakić also criticized the parceling and concreting of the park area.
Equipment selected for the concreting operations include Putzmeister's MX 32 stationary boom, an M 38 truck-mounted concrete pump and two BSA 2,109 HP stationary pumps. A bridge was built across the river, just downstream of the dam, to replace the ferry system, which had been the only means for transport across the river. Various studies were conducted during construction, and identified risk factors, one of them was "Key Organizational Risk Factors: A Case Study of Hydroelectric Power Projects in Myanmar".
The Societé d'Equipement du Pas-de-Calais was contracted to carry out the development work, which involved excavating a further two metres (six feet) beneath the dome, clearing out and completing the unfinished concreting of some of the tunnels, building an exhibition centre and car park in the quarry floor and installing a lift to carry visitors up from the octagon to the dome."Wizernes opens to the public". After the Battle, 97:34–37. London: After the Battle Magazine.
With its completion, residents would no longer have to pay barge fees, and travel time between barangays on either side of the river has been cut short drastically. The bridge in Santa Maria (Cabiseria 8) was completed and opened to the public in 2015. Road concreting and widening, creation of diversion and circumferencial roads and farm to market roads were prioritized by the national and city government to help mobilize the transportation goods and delivery of basic services within the city's jurisdiction and neighboring municipalities.
Falling, loading, haulage and conversion of the timber was done free of charge. Working bees were held over a number of months which is involved a total of about 80 personnel. 43 people assisted with the foundations and concreting, 30 worked on the carpentry and plumbing, 14 people helped with the painting while two people installed the electrical work. At the official opening on 30 May 1970, Sir Douglas FraserFraser, Sir Douglas Were (1899-1988), Kenneth Wiltshire, Australian Dictionary of Biography, Volume 17, 2007.
In the British Army, the Corps of Royal Engineers has a specialist role of Royal Engineers Diver dating back to 1838 under Colonel Charles William Pasley. They are trained at Horsea Island alongside Royal Navy divers for the tasks required of an engineer diver, such as underwater thermic lance cutting, concreting and demolition. In addition, the reserve Commando Engineer Divers of 131 Commando Squadron Royal Engineers, a part of the 24 Commando Engineer Regiment Dive Team, are trained as divers to the same standards.
A proposed series of canals connecting the river with Sydney Harbour was not commenced. A sewage farm operated near the mouth of the river from 1889 to 1916. A railway was used in both the construction of mains and filtration buildings, as well as in the day-to-day operation, moving screened solids throughout the farm. Concreting of the river banks commenced in the 1930s and the Cooks River Improvement Act of 1946 confirmed the policy of the tidying up of an undisciplined stream within neat cement boundaries.
Utku Ünal is a Turkish musician. After having graduated from the Middle East Technical University (METU) in 1995, Ünal decided to pursue his career in the field of music. That is the reason why he entered Bilgi University and obtained his masters in the field of music, thus concreting his understanding of music in an academic sense. Between 2006-2007, Ünal completed his Master’s thesis on Analysis of usage of 5 and 10 timed Rhythms in the Southeastern Anatolian Region and has since continued his academic career as an instructor to various private education institutions.
The name hipages stems from a portmanteau of Home Improvement Pages. hipages offers directory services that connect homeowners to registered tradespeople from 1,300 categories including plumbing, building, painting, tiling, electrical work, handyman work, garden maintenance, air conditioning, concreting and other home repair jobs. Currently through the hipages platform, over 90,000 tradies are listed on the directory with more than 100,000 jobs posted every month by homeowners. More than 1.5 million people visit the hipages website every month, generating $2 billion worth of work over the last financial year.
The club play at The Mechanics, Jepson Way having originally played at Stanley Park Arena. In December 2007, the club announced plans for a £60,000 refurbishment programme, including improvements to the pitch, as well as new crowd barrier fencing and concreting the spectators area right round the pitch. Drainage work began on the pitch in April 2008, as well as levelling and reseeding the pitch. Following the club's name change in May 2008 they leased a further piece of land next to the ground to accommodate the enlarged club.
Frost damage of early-age concrete is particularly harmful for the concrete mechanical resistance because the ice volume expansion causes micro-cracks in the concrete structures, and as a consequence it lowers the compressive strength of concrete. Therefore, when concreting at cold temperature cannot be avoided, it is essential to have a minimum curing time at a temperature sufficiently above the freezing point of the concrete pore water, so that the early strength of concrete is high enough to resist the inner tensile stress caused by water freezing.
By 1994 the pivot span and turning machinery of the old bridge were dismantled. In the period 2002–2003, a complete overhaul was carried out on the old bridge related to the construction of the Ladozhsky Rail Terminal with a total value of around 900 million rubles. During overhaul a new pivot span and turning machinery were mounted and the supporting bridge towers underwent renovation—the supporting piers of the bridge were substituted by new ones. The bridge's footings were strengthened by installing a reinforced concrete coating using falsework plates and underwater concreting.
After the October Revolution, the Soviet authorities decided to eliminate it. In 1923 to 1926, when the Ioannovsky Convent began to be closed, the option of reburial in one of the cemeteries was discussed, but the idea met resistance from Soviet authorities, who feared that the new grave would become another place of veneration. Also discussed the option of bricking up the crypt and later burying the remains more deeply, along with concreting the floor of the crypt. It is known that the crypt was indeed bricked up, but there is no information on reburial.
In total, 30,960 precast concrete lining segments were used. Concreting of the final interconnecting passage was completed on 24 June 2013, marking the end of construction of the tunnel walls. On 14 April 2014, civil engineering work on the tunnel was completed, but railroad signaling and equipment still needed to be installed. Service on the LGV Est line was originally scheduled to begin on 3 April 2016; however, a fatal accident that occurred elsewhere on the new line in November 2015 during commissioning tests delayed the opening of the line until 3 July 2016.
This was achieved by the Science Department of the Bouygues Group, the contractors for the project, who developed an extra-strength concrete four times stronger than ordinary concrete. Called B.H.P (highly resistant concrete), it offers a resistance to compression value of 1200 bars per sqcm (claimed to be a world record) and has a very quick setting time. This enabled the building of a taller structure with due underpinning of the foundation, while adhering to the construction schedule. Cranes were also designed to suit the height of the minaret for concreting.
The work was thus eight months late compared with early projections. On 26 January 2016, one year later than scheduled under the August 2014 timetable, work began on casting the floor slab in the first excavation pit of the station, initially as the base plate in what is known as the Medienkanal (middle channel). Construction work in the middle part of the future platform hall (October 2017) The concreting of the first roof stanchions was due to start in June 2017. The 28 columns are to be concreted two at a time.
Duaringa Ambulance Station, 2012The local ambulance station, opened in 1970, is unique in the fact that it was built almost exclusively by voluntary labour performed by local Duaringa residents. After local postmistress Nancy Andrews donated a substantial parcel of land for the purpose of establishing an ambulance station next to the Duaringa Post Office, the Rockhampton Ambulance Committee engaged the services of architect Edward Hegvold to draw up plans for the proposed building. Once the plans were approved, the voluntary labour commenced construction. Six local residents donated timber, gravel and sand for concreting.
Some of them are headwaters of watercourses discharging into the Neretva River to the northwest of the polje, or appearing as vruljas (submarine springs) or as headwaters of the Ombla river. Flow rate of the Ombla River, measured at the Komolac water intake plant, ranges from per second, averaging per second. The average has dropped by about per second since completion of Trebišnjica Hydroelectric Power Plant and the concreting of the Trebišnjica's river bed. On the other hand, the minimum discharge was not affected by the river engineering works.
Sustenance workers were employed chiefly for on-site preparation, road construction, foundation excavation, clearing timber from the reservoir basin, and on some concreting operations. Skilled workers were required on the dam for fixing the formwork where the concrete was poured. These workers were probably employed at normal day labour rates, the main employment method used on the project. Bulk handling of cement was also used for the first time in Australia, this saw a significant saving as opposed to bagged cement which was the standard practice of the day.
Leningrad Nuclear Power Plant ( Leningradskaya atomnaya elektrostantsiya; Leningradskaya AES ()) is a nuclear power plant located in the town of Sosnovy Bor in Russia's Leningrad Oblast, on the southern shore of the Gulf of Finland, some to the west of the city centre of Saint Petersburg. As of 2018, the plant has four nuclear reactors of the RBMK-1000 type, where unit one is closed down (December 2018). These reactors are similar to reactors No. 1 and 2 of the Chernobyl Nuclear Power Plant. Plans are underway to replace the RBMK-reactors with four new reactors of the VVER-1200 type, with the plant identification "Leningrad II". On 25 October 2008, Saint Petersburg Atomenergoproekt began concreting the foundation plate of the reactor building of the Leningrad Nuclear Power Plant II, Unit 1. Cost of the project was estimated to be almost 70 billion Russian ruble (RUR) (about $3 billion in US dollars).Leningrad NPP-2: Concreting of the foundation plate of the reactor building of the 1st unit started; 27 October 2008:Construction starts at Leningrad II; 27 October 2008: A construction licence was issued on 22 July 2009. In October 2018 Leningrad II-1 started commercial operation, and Leningrad II-2 is scheduled for start of commercial operation during 2020.
The municipal gymnasium was completed. In the May 1995 election, Roberto Cabunoc took over the mayorship of the town and implemented the road concreting projects, beautification of the municipal plaza, installation of water system, construction of the new municipal hall and completion of different barangay projects. After three terms of Mayor Cabunoc, Mayor Edilberto F. Ayuban followed with 3 consecutive terms. In the mayoral election of 2013, Mayor Fruto B. Dandasan who used to be one of the town's elected councilor, became the town vice mayor for two consecutive terms and now elected as the municipal mayor of the town.
In comparison, the only other airport capable of handling large aircraft is located in the provincial capital of Puerto Princesa, approximately 230 kilometers to the south. In 2013 the Department of Transportation and Communications approved a 48.2-million budget for the airport's improvement, consisting of the concreting of a runway 1,100 meters long and 18 meters wide. In February 2016 the Sangguniang Panlalawigan of Palawan approved a resolution to permit the semi-privatization of the airport through a public–private partnership (PPP). The Department of Transportation and Communications allotted 8.8 million for the airport's development for the year 2016.
The penstock/pressure shaft is in the form of a steel lined pressure shaft which is diameter to carry a discharge of /sec for power generation. It is in length (with 10% slope).) and bifurcates into two at the bottom end to feed two turbines, each of 40 MW capacity. Slope protection in the long stretch of the reservoir spread (up to a surface area of ) also involved concreting to the extent of to take care of draw down condition for operating the power stations of the cascade under two daily peaks in the morning and evening.
Cross Queen St on the south side of the creek. The path is mainly concrete which previously had an intervening rough gravel section that became submerged in wet conditions, however the concreting of this section has now been completed. The path appears to come to an end at the juncture of Railway Ave and Merton St, 2.5 km from Queen St. Take to the road and cross under the railway line, along Merton St, over the rough bluestone surface. Immediately turn left (SW) and take to the rough dirt track parallel to the railway line amongst the weeds.
The federal government and the state of Rhineland-Palatinate participated in financing the station and the state also built the new autobahn interchange. Under the planning arrangements of 1998, Rhineland-Palatinate state government would provide finance of DM 5.75 million and the town would fund DM 750,000. Montabaur mayor, Paul Possel-Dölken, expected in 1998 that the station would generate 300 new jobs and 2,000 additional apartments for new residents. In mid-1999, the railway embankment in the area of the station was nearly completed and the concreting of the station underpass was in full swing.
The building at the rear of the station was connected to the existing building by gangways at each floor level, and provided additional living and recreational facilities for the police. Concreting of the station yard and other similar projects were undertaken the following year, using day labour. The Police Reserve was extended to the north, to include a former Quarry Reserve at the corner of Main and Vulture Streets. One of the requirements of the new Headquarters was the inclusion of a room for police to administer relief work, a government program instituted under the Income (Unemployment Relief) Act (1930) to reduce unemployment.
Tuxford in Bassetlaw The Great North Road runs through the village (now B1164), though the majority of traffic now uses the modern A1 trunk road, which splits the village in two. The village was bypassed in July 1967, opened by Stephen Swingler. The section of road, known as Carlton to Markham Moor, or the Sutton-on-Trent, Weston and Tuxford Bypass, was built by Robert McGregor & Sons, with concreting aggregates supplied by Hoveringham Gravels (later bought by Tarmac). The eight-mile section was authorised by Tom Fraser with a contract for £2.7 million, but ended up costing £3.4 million.
In investigating new possibilities for the development of Slovenian Istria, a group of enthusiasts began considering the potentials for construction of an international seaport. In 1957, they prepared an investment programme for the development of 135 metres of Koper's northern shore, while 23 May that year saw the foundation of the first handling and warehousing company Pristanišče Koper. Thus the new venture was established, employing local workers whose experience was crucial in the organisation of this new and intrepid undertaking. By August 1957, the Peter Klepec, a floating dredger had deepened the seabed along the northern shore of town, and concreting the area around the first berth began in December.
In ballastless tracks, the rails are rigidly fastened to special types of concrete ties/sleepers that are themselves set in concrete. Ballastless tracks therefore offer a high consistency in track geometry, the adjusting of which is not possible after the concreting of the superstructure. Therefore, ballastless tracks must be concreted within a tolerance of . The elasticity of the ballast in the traditional railway superstructure is replaced by flexibility between either the rails and the concrete ties/sleepers or the ties/sleepers and the concrete or asphalt slab as well inherent elasticity within the conglomerate of the tie/sleeper, whereas the concrete or asphalt slab is usually inelastic.
In fact, the river flooded again in 1969, and while much of the runoff from the Inland Empire was captured behind Prado Dam—probably saving Orange County from an even greater flood—Santiago Creek, a large tributary flowing from the Santa Ana Mountains, eroded its banks until it swept away portions of residential communities in the cities of Tustin and Orange.From Crest to Coast, p. 46 In 1964, the Santa Ana River Mainstem Project, which involved concreting the lower of the river, was first proposed. Construction work began in 1989, and today, through much of Orange County, the river's channel is essentially an enormous box culvert.
Henry Wagner, a grandson of John Henry Wagner, eventually acquired control, expanded to include concreting, and in 1989 formed a partnership with three of his sons John, Denis, and Neill. Later, a fourth son Joe, joined and became an equal partner in the business which has achieved regional, national and international distinction. From 1989, the business expanded rapidly from one concrete plant to 19 within 20 years and a work force of 1,100. Diversification led the business into pre-cast concrete, re-enforcing steel, ground-breaking building products and major construction and infrastructure projects both at home and abroad, including in sub-zero temperatures in Sakhalin, Russia.
In the 1980s the property changed hands a number of times, but the hardware business has been sustained. The property underwent a change of ownership in 1988, with a number of alterations subsequently made to the building, including opening up the street awning, (which had been enclosed), replacing the front verandah posts, removing the walls and ceilings of the front display windows, concreting the floor, and adding an office extension to the rear of the building. Olsen's Home Hardware later shifted to a different Warwick location in Fitzroy Street. The store was vacant in 2010, but in 2015 was occupied by an Anytime Fitness gym.
Water extraction and discharge of waste water had a strong impact on the water regime of the Steinlach and reduced its water quality. The protection of the traffic routes in the Steinlach valley and the southern part of Tübingen from Steinlach floods made it necessary to straighten the previously natural course of the Steinlach between Dußlingen and Tübingen, and thus to permanently impair it. The concreting of the Steinlach bed within Ofterdingen, which was carried out as early as the 1970s, also served the purpose of flood defence. At the same time, the mechanical-biological collective sewage treatment plant of the Abwasserzweckverband der Steinlach- Anliegergemeinden south of Derendingen as well as numerous rainwater retention basins were built.
Wuqiu Lighthouse (labeled as 'Light' on Wu-ch'iu Hsü (Ockseu) ) (1953) The lighthouse was constructed by the Netherlands in 1874 with engineer David Marr Henderson and deputy engineer John Ropinald to serve as navigation aid for ships sailing between Fuzhou and Xiamen. The lighthouse lost its top structure during World War II and was repaired afterwards to become a lower black lighthouse in 1947. However, the lighthouse became inactive in 1951 as part of military strategy due to the tension with People's Liberation Army. In 1960-1975, works were made to improve the lighthouse, such as concreting the wall, increasing its height, adding house inside the wall and creating a connecting tunnel.
He criticized the bidding process as fake and farcical and pointed that important Belgrade architects boycotted the bidding, adding that we "used to laugh at Skopje". Architect Slobodan Maldini pointed to the inadequacies of the competition, including the composition and competency of the jury and a fact that the name of the winner leaked 8 days before it was officially announced. Spanish work is formally flawed as it has no documentation needed, the monument is different in appearance, size and location from the already chosen Russian sculpture. Maldini stated that the competition is a result of the greed and incompetence and described the project as "unacceptable concreting without ideas" and the sculpture as pricey and megalomaniacal.
Over centuries of London's growth from medieval times to the Victorian age, the natural tributary system of the Thames Tideway was converted first into public open sewers and then closed over into covered sewers which emptied directly into the River Thames. Joseph Bazalgette's remediation of the ensuing 1850s Great Stink renewed much of London's sewerage mains infrastructure during the period 1859 to 1865. However, the new design was not intended to cope with the doubling of London's population over the following 150 years. The concreting of huge amounts of London's green spaces causes substantial rainwater run-off into the drainage and sewerage systems which had been expected to soak into the ground.
Alterations undertaken by the Council included: widening of the southern window in the office adjoining the front porch to create a doorway; concreting of strong room and toilet floors; relining of ceilings; sealing of fireplaces; and cutting a new door in the corridor. In 1987 the exterior stonework was redressed as part of a restoration project by the Brisbane City Council. Also the original interior colour scheme was identified, and the grounds were returfed and paved to resemble a typical Brisbane turn of the century garden design. The premises were vacated by the Council in late 1990, and are now used by the Brisbane Branch of National Trust of Queensland and the Windsor and District Historical Society for offices and meeting rooms.
On August 29, 2019, the head of TsENKI (), Kirill Filenkov, told the media that factory tests of the support device of the first four floors of the cable-filling tower had been completed successfully and they began sending them to the spaceport. Dispatch will be completed on time with an estimated launch date for Angara-A5 in the fourth quarter of 2023. On September 1, the head of Roscosmos, Dmitry Rogozi, announced on Twitter that on September 2, the foundation pit would begin concreting and 1.5 thousand cubic meters of concrete would be poured. On September 1, 2019, Deputy Prime Minister Yuri Borisov in an interview with the media said that the Cabinet was dissatisfied with the pace of construction of the second stage.
In 1990, the city council, hoping to "move" the department to revitalize the village, called on the general council, owner of the ruins, to secure them in the name of public safety. The expected result - the restoration of the houses - actually led to a crystallization action of the village, with a concreting of the ridges and laying fences around the houses. It was not until 1996 that the department took the official decision to permanently maintain the rating 139. From the beginning, some of the former inhabitants fought to maintain the status of commune in Celles, and regularly maintained and renovated communal buildings, not expropriable The ruined village has served as a backdrop for several feature film scenes, notably the 1985 thriller Zone Rouge (Red Zone).
The following night, Paul Bearer challenged Undertaker to a match at Unforgiven: In Your House where the ring would be surrounded by fire and the first man to be set alight would lose, thus giving birth to the Inferno Match. By winning the fifteen-team battle royal, LOD 2000 won the right to face the WWF Tag Team Champions at Unforgiven. The champions by rights were Cactus Jack and Chainsaw Charlie, but some legal wrangling from The New Age Outlaws saw the match held up on account of the wrong dumpster being used. The vacant titles were disputed in a steel cage match the following night, which the Outlaws won after interference from the newly formed DX Army, concreting their ties, and by handcuffing Charlie to the cage by his neck.
When the building became overly radioactive, it became impossible to directly screw down the nuts and bolts or apply any direct welding to the sarcophagus, so this work was done by robots. The seams of the sarcophagus, however, were not properly sealed. The entire construction process consisted of eight stages: clearing and concreting of territory around reactor unit 4, erection of initial reinforced concrete protective walls around the perimeter, construction of separation walls between units 3 and 4, cascade wall construction, covering of the turbine hall, mounting of a high-rise buttress wall, erection of supports and installation of a reactor compartment covering and finally the installation of a ventilation system. More than of concrete and 7,300 tonnes of metal framework were used during the erection of the sarcophagus.
All three invited teams refused to participate in the proposed bidding, so the city decided to return to the 2008 project by Redžić in May 2020, announcing the reconstruction is not ready anyway due to technical problems, moving it for 2021. By this time, urbanists and other architects began to criticize all the projects as wrong, starting with the Dobrović's design and all the other which all followed his basic idea which includes, in different variants, concreting of some , construction of the pointless monumental stairways under which the "tunnel" will host just another shopping mall. Instead, some proposed ditching of all those projects and construction of a proper, modern park, which would descent down to the Sava bank and help conduct fresh river air directly into the overheated city downtown.
Spanish work is formally flawed as it has no documentation needed, the monument is different in appearance, size and location from the already chosen Russian sculpture. Maldini stated that the competition is a result of the greed and incompetence and described the project as "unacceptable concreting without ideas" and the sculpture as pricey and megalomaniacal. Nevertheless, works began in July 2019 but were halted the next month, with removal of the temporary and auxiliary objects from the square. The 1990-1999 war victims memorial will be moved to the green area in front of the Railway Museum, on the small square of Hajduk-Veljkov Venac, up the Nemanjina Street. Works were continued in December 2019 when the original deadline, 15 February 2020, was postponed to the late May 2020.
The first phase of the redevelopment involved the demolition of the North Stand, the concreting of all terraces and the building of a block of turnstiles around the upper section of the East Terrace. This work, begun in October 1981 and completed in 1986, reduced the capacity to 74,370 and cost £3 million. A second phase had been planned to begin in 1988, but the release of the Taylor Report caused the plans to be redrawn and the proposed costs escalated to £25 million. Scotland hosted the 1989 FIFA Under-16 World Cup, with the Scots contesting the final against Saudi Arabia at Hampden. After the cancellation of the annual Scotland v England fixture in 1989, questions were raised as to whether Scottish football required a separate national stadium.
Furthermore, in the early 1930-40's the Lewis family purchased a larger piece of land neighbouring market gardens on the corner of Jasper Road and Jasper Street. At this site, A. Lewis & Company PTY LTD was built and continues to this day in the same family ownership and operations. In the mid 1900s the council changed the street name to Lewis Street to avoid confusion between the main road and side street being both named Jasper as those in the area simply referred to the street as "the one Lewis's is on". In the 1980s Laurence Lewis (Jr) donated Box Cottage from the recently acquired Reitman's concreting works which neighboured the property to the Moorabbin Historical Society and was removed piece by piece; it was then rebuilt in Joyce Park with timber donated from the timber mill operations to original specification.
A Bundy Clock used by Birmingham City Transport to ensure that bus drivers did not depart from outlying termini before the due time; now preserved at the Arboretum. In 1900, H. E. Lavender was selected in a competition to design a pavilion to include refreshment room accommodation. The pavilion was completed and opened in May 1902. In 1904, stocks were moved from the High Street to the lake area. In 1908, significant maintenance work was carried out on the park which included the laying of new turf, reparation of the stocks and the concreting of part of the course of Hoar Brook. Construction commenced in 1912 on new outdoor swimming pools beside the brook. During World War I, the park was used to grow potatoes and timber which was supplied to the Walsall War Agricultural Committee.
In 1992, he became the youngest ever elected-local chief executive in the entire nation at age 29. For three (3) consecutive terms, he administered the economic, social, political, and cultural affairs of the Municipality of San Juan beyond everyone's expectations. He spearheaded various projects and programs for the improvement of the said municipality in the form of - construction of modernized Barangay Halls with Day Care Centers in all Barangays, repair and renovation of the now San Juan National High School, and other public elementary schools, recreation centers like gymnasiums, basketball courts and play grounds and the creation of different livelihood centers, improvement and replacement of drainages, concreting of municipal roads and the construction of a four-storey San Juan Medical Center and the San Juan Municipal Gymnasium. During his incumbency, San Juan gained the reputation of being one of the most progressive municipalities and the Most Peaceful Municipality in the Philippines.
The company also drew up major plans for the airfield, including concreting the runways (the longest one being just over 5600 ft after the RAF extensions), a new terminal and cargo centre west of the Thong Lane side and their aircraft parts main plant to the east of Thong Lane. When the RAF requisitioned the entire aerodrome in 1939 at the beginning of the war they made it a sector airfield for Biggin Hill, as one of the airfields of 11 Group. The first squadron to occupy Gravesend was 32 Squadron, arriving on 3 January 1940 with its Hawker Hurricane fighters, being replaced by 610 Squadron on 27 May. These were followed by another Auxiliary Squadron, 604, which operated Bristol Blenheims as night fighters from 3 July. 501 and 66 Squadrons also flew from here during the 1940 Battle of Britain, arriving on 25 July and 10 September respectively. Many other units also occupied the station during the war years, such as 71 Squadron, which arrived 14 August 1942 for the Dieppe Raid, 92 Squadron (24 September 1941).
The tunnel in 2011, five years after its opening but still without pavement, ventilation or lighting. The tunnel was officially opened in March 2006; it was built by the Iranian Sabir Co. Due to the significance of the tunnel, limited traffic flow was permitted via signing a waiver form noting potential hazards such as flooding and smog from construction equipment operating inside the tunnel prior to the final construction phase which may have included installation of ventilation and drainage infrastructure. Workers pose following the tunnel's repairs and reopening As of May 2014, the tunnel was still unfinished and the Iranian government and Tajik government had signed an agreement to complete the project by late March 2015. The tunnel was closed in June 2015 for repair work and reopened for traffic in September 2015 after leakage problems and concreting the base and lighting the tunnel was completed.Iran-made tunnel connects Tajikistan’s north to its south, published on 8 December 2015, Press TV It was officially inaugurated in August 2017.
A month later, concreting work resumed after ASN accepted EDF's corrective action plan, which included external oversight checks. In May 2009, professor Stephen Thomas reported that after 18 months of construction, and after a series of quality control problems, the project is "more than 20 percent over budget and EDF is struggling to keep it on schedule". In August 2010, the regulator, ASN, reported further welding problems on the secondary containment steel liner. The same month, EDF announced that costs had increased 50% to €5 billion, and commissioning was delayed by about two years to 2014. In July 2011, EDF announced that the estimated costs had escalated to €6 billion, and that completion of construction was delayed to 2016. On 3 December 2012, EDF announced that the estimated costs had escalated to €8.5 billion. In December 2012, the Italian power company Enel announced it was relinquishing its 12.5% stake in the project, and five future EPRs, so would be reimbursed its project stake of €613 million, plus interest. In November 2014, EDF announced that completion of construction was delayed to 2017, due to delays in component delivery by Areva. In April 2015, Areva informed the French nuclear regulator ASN that anomalies had been detected in the reactor vessel steel, causing "lower than expected mechanical toughness values".

No results under this filter, show 95 sentences.

Copyright © 2024 RandomSentenceGen.com All rights reserved.