Sentences Generator
And
Your saved sentences

No sentences have been saved yet

56 Sentences With "clearways"

How to use clearways in a sentence? Find typical usage patterns (collocations)/phrases/context for "clearways" and check conjugation/comparative form for "clearways". Mastering all the usages of "clearways" from sentence examples published by news publications.

The Clearways Programme aimed to divide fourteen rail lines into five independent "clearways", reducing the heavily interwoven nature of the Sydney system. This was intended to isolate incidents to one part of the network so other lines would still run as scheduled. The "clearways" feed the existing lines through the Sydney Central Business District.Planned major Clearways routes CityRail As the Carlingford Line does not run through the CBD, it was not included in a "clearway".
A new numbering system was also introduced and the new line was given the number T2. The 2013 timetable was designed to integrate the projects of the Rail Clearways Program, a 2004 plan to divide the network's fourteen metropolitan rail lines into five independent "clearways" by installing extra tracks, passing loops, turnouts and turnbacks at pinch points around the network. By 2013, the Rail Clearways Program was substantially complete. At the same time, the delivery of 78 new Waratah trains was almost complete as well.
This route did not change from the pre- Clearways Eastern Suburbs & Illawarra Line. The projects undertaken on this route have increased passenger capacity.
A similar sign is used for clearways in many other countries. Similar signs are deployed on New Zealand clearways to British clearways, with a standard blue circle edged in red and featuring a red diagonal cross. If the clearway is for limited periods only, this will be indicated by a small sign below the clearway sign. Whereas in the United Kingdom a further notice with the word "Begins" or "End" will indicate the extent of a clearway, in New Zealand this is indicated by small signs featuring red arrows, indicating the direction from the sign in which the clearway is in operation.
In New South Wales clearways are indicated by a yellow broken line at the kerb and "clearway" signage (which indicates the times of the day upon which the clearway operates). In Perth, Western Australia, clearways operate between 7:30 and 9:00 am, and from 4:15 to 6:00 pm on weekdays. Parking meters do not accept payment during these times.
Two associated projects affect the line. The East Hills line's Kingsgrove to Revesby quadruplication Rail Clearways project opened in April 2013. It improved the capacity of the East Hills line by allowing the separation of express services to Leppington or Macarthur from all-stops services to Revesby.Rail Clearways Program - Kingsgrove to Revesby Quadruplication project profile Transport Construction Authority The Auburn stabling project provided additional capacity to stable trains.
1: "Main Suburban & Branches – Illawarra & Branches". State Rail Authority of New South Wales: Sydney, p. 206. In the 2000s, as part of the Rail Clearways Program, the two remaining single track sections were duplicated.
The work was completed in time for the introduction of a new timetable on 28 May 2006.Transport Infrastructure Development Corporation, "Media Release: Bondi Junction Clearways Project Completed", 1 May 2006. Retrieved 11 January 2007.
Retrieved 11 January 2007. The work was completed in time for the introduction of a new timetable on 28 May 2006.Transport Infrastructure Development Corporation, "Media Release: Bondi Junction Clearways Project Completed", 1 May 2006. Retrieved 11 January 2007.
Various proposals were put forward, including a three-way underground junction near Carlingford, linking the station to the proposed North West Rail Link, as well as the line to Chatswood. In 2003, the Minister for Transport, Michael Costa announced that only Stage 1 of the line, from Chatswood to Epping, would be built, but the Carlingford line section was indefinitely postponed. Under the Rail Clearways Project, announced in 2004, the line was to have had a crossing loop at Rydalmere, thus allowing an increase in train frequency to half-hourly throughout the day. However, that part of the Clearways Project was cancelled in November 2008.
Example of a Clearway sign in New South Wales In Australia, a clearway is a special road upon which only taxis and buses may stop at the kerb on certain times of the day. Any other vehicle which stands at the kerb may be towed away (unless there is some form of emergency). Clearways are used on congested roads where there is no room for additional traffic lanes. Clearways aim to improve traffic flow at certain times of the day by prohibiting stopping in the lane next to the kerb, adding another lane to the roadway (when used on both sides of the road, two are added).
An additional platform and turn-back track was completed at Revesby as part of the Rail Clearways Program. From October 2009 it replaced East Hills as the primary turn-back point for local all-stations services on the line.Transport Infrastructure Development Corporation, "Revesby Turnback: Project Profile". Retrieved 30 December 2006.
A second Rail Clearways project involved quadruplicating the section of track between Kingsgrove and Revesby. This enables express services between the Campbelltown area and the city to operate separately from local services between Revesby and the city.Transport Infrastructure Development Corporation, "Kingsgrove to Revesby Quadruplication: Project Profile". Retrieved 30 December 2006.
"Rail Clearways for Sydney". Transit Australia. September 2004. p.284NSW Minibudget NSW Government November 2008 In August 2010, the Federal Government promised $2.6 billion towards the project, which, along with funding from the New South Wales Government, would have allowed the line to be extended from Epping to Parramatta via the Carlingford line.
From 2009 to 2011, the track between Quakers Hill and Schofields was duplicated for more than three kilometres as part of the Rail Clearways Program.Rail Clearways Program - Completed Projects Transport for NSW 15 August 2014 This was intended as the first stage of a broader plan to duplicate the line as far as Vineyard. In order to be able to continue the duplication towards Richmond, it was proposed re-align a short section of track and relocate Schofields station to a site with fewer space constraints, 800 metres south of the existing station. The proposal to relocate the station was a controversial one and raised concerns amongst residents and businesses located near the former station, in relation to accessibility and urban decay.
Around the same time, a new platform for southbound services was constructed as part of the Rail Clearways Program. Platform 4 opened in January 2014.Liverpool Fourth Platform Project Transport Infrastructure Development CorporationLiverpool Turnback Transport for New South Wales January 2014 Previously platform 2 was the main southbound platform with platform 3 used for turnbacks.
Kirrawee station opened on 16 December 1939 when the Cronulla line opened from Sutherland to Cronulla.Kirrawee Station NSWrail.net In 1954 there was a holdup, and a young man stole £43. Kirrawee railway station was rebuilt as part of the duplication of the remaining single track sections of the Cronulla line, under the Rail Clearways Program.
Following him were the Canadian duo of Patrick Carpentier in sixth and Tagliani seventh. Fernández switched to a back-up car for the rest of the race meeting. His team altered its setup, but he used too much kerb at Clearways corner and was left eighth. Two other Mexican drivers, Jourdain and Mario Domínguez, rounded out the top ten.
His relationship with the state government was adversarial, particularly after Smith decided "to urge motorists to ignore clearways signs" which Victorian government had erected in his municipality. In 2012, following his time as mayor, Smith worked as a management consultant in strategy and operations with Deloitte and as senior consultant working with the CEO of PricewaterhouseCoopers.
This was abandoned as a cost-cutting exercise. The CityRail Clearways Project envisaged reviving this plan, with stopping trains serving only the newly completed western platforms. However, this project was cancelled in November 2008.Mini-Budget 2008/09 page 25 New South Wales Treasury November 2008 In 1990, the station building on the western platform was demolished and replaced by a waiting shelter.
The first incarnation of the Grand Prix circuit In January 1960 Kent County Council gave planning permission for the extension of Brands Hatch – an extension which would double the length of the track offering a choice of long or short circuits. The new 2.65-mile track used, all of this existing one with the extension of Kidney Bend; South Bank became a long, uphill 160° sweep out into the country and making the approach to Clearways very much faster. From South Bank there followed a long straight dipping into and out of the next valley to the right-hand Hawthorn Bend followed by Portobello Straight to Westfield Bend leading to the dip to Dingle Dell, Dingle Dell Corner and the difficult left-hand Stirling's Bend. A short straight then brought the circuit back to Clearways at much higher speed than hitherto.
Bourdais continued his strong form by going second-fastest, and Hunter-Reay completed the top three participants. Lemarié drifted wide onto the left-hand grass between the McLaren and Clearways corners. Camathias caused the session's sole stoppage by going straight into a gravel trap at Druids hairpin after locking his brakes. He required extraction by marshals to enable his return to the pit lane.
To the west of the station, lie two incomplete platforms. They were originally built in the 1970s as part of the construction of the Eastern Suburbs line when the alignment between Sydenham and Erskineville was expanded to accommodate six tracks. This was abandoned as a cost-cutting exercise. The CityRail Clearways Project envisaged reviving this plan, with stopping trains serving only the newly completed western platforms.
The B3, a two-laned major road that is connected with the autobahn network, can be reached in approximately half an hour after 25,9 km near Marburg. In addition to these long distances to clearways, the traffic situation is impaired by frequent radar controls and speed limits on B236 between Münchhausen and Marburg as well as sloping and winding roads on B253 when passing the Sackpfeife.
CityRail ticket with Rail Clearways promotional material Berowra additional platform completed in October 2006 Hornsby additional platform completed in April 2009 Kirrawee additional platform built as part of Cronulla line duplication completed in April 2010 Lidcombe turnback platform completed in November 2010 Riverwood laid as part of Kingsgrove to Revesby quadruplication completed in April 2013 The Rail Clearways Programme was conceived in 2004 with the aim of easing congestion of Sydney's suburban railway network, by reducing the amount of infrastructure shared by multiple services. The disparate projects at pinch points throughout the network were designed to increase passenger capacity and improve reliability. All projects were delivered by the Transport Construction Authority until it was subsumed in November 2011 by Transport for New South Wales. A new timetable was introduced in October 2013 that realised the benefit of many of the projects, and by January 2014—the programme was complete.
An additional 4,000 train and 3,400 bus services were commissioned for the event. There were 400 road clearways and 300 road closures. Threats to strike on 17 July in the heart of the celebrations, made by disgruntled rail workers, were withdrawn following negotiations with the state government.Rail Strike Cancelled Following World Youth Day, the NSW Premier Morris Iemma gave the transport systems' performance a 10-out-of-10 rating.
The wires did continue north of the station as far as the Hornsby Maintenance Depot. As part of the CityRail Clearways Project, a fifth platform was constructed for use by through northbound trains. To allow for the new line, the Hornsby Signal Box was shifted 120 metres in 2007. The new platform opened on 16 March 2009, with the existing Platform 4 becoming a turnback platform for Northern line trains.
Bondi Junction had originally been intended only as an intermediate turnback station before the extension to Kingsford was abandoned. As part of the Rail Clearways Program, the $77 million Bondi Junction Turnback project saw a new rail crossover was built between the single-track tunnels, enabling 20 trains an hour, up from 14, to use the station. Transport Infrastructure Development Corporation, "Bondi Junction Turnback: Project Profile" . Retrieved 11 January 2007.
The title came down between Yvan Muller and Jason Plato in the final race. After an early spin by Plato, Yvan Muller looked comfortable to take the title, until two excursions at Clearways caused an oil leak and fire for Yvan Muller leaving Plato champion. Triple Eight finished 1st in the teams and manufacturers award. 2002 saw the departure of Jason Plato from the BTCC to race in the British ASCAR stock car championship.
Because suburban trains terminating on the main lines caused congestion to through trains, a side turnback platform was added in time for the 2000 Summer Olympics. Under the CityRail Clearways Project, Macarthur received an upgrade. This work, completed in late 2010, included refurbishment of the station, a bus interchange, and a new carpark. In a proposed second stage, Macarthur was to receive a fourth platform for through trains heading south, however, the project was cancelled.
"East Hills" Railway Digest November 1987 page 365 Following the extension, East Hills became the main intermediate terminus and an interchange point between all stops and limited stops trains. In addition to the two through tracks (platforms 2 and 3), a side terminating track (platform 1) was provided. A new centre turnback at Revesby opened in 2009 as part of the Rail Clearways Program, which ended East Hills' role as the primary intermediate terminus.
Constructed as a part of the CityRail Clearways Project, a second turnback facility was built. The major work consisted of the construction of a new crossover tunnel on the city side of the station. This created an X shaped or diamond junction allowing terminating trains to arrive at either platform. The changes allowed the full line capacity of 20 trains per hour to be turned at Bondi Junction, the prior limit being 14.
Gymea station opened on 16 December 1939 when the Cronulla line opened from Sutherland to Cronulla.Gymea Station NSWrail.netGymea Railway Station Group NSW Environment & Heritage Originally, Gymea was one of two crossing loops on the line, with the other being at Caringbah. The section from Gymea to Caringbah was duplicated in 1985, and under the Rail Clearways Program, the remaining sections of single line railway from Sutherland to Gymea and Caringbah to Cronulla were duplicated in April 2010.
The line was duplicated and electrified beyond Kingsgrove in 1948.Kingsgrove Railway Station Group NSW Environment & Heritage In 2000, as part of the quadruplication of the line from Wolli Creek to just west of Kingsgrove station, through lines were added on either side of the existing pair. A headshunt was provided to the west of the station in association with this project, this is used by terminating services. In 2013, the quadruplication was extended to Revesby as part of the Rail Clearways Program.
James Thompson's SEAT Leon leads the field into Paddock Hill Bend during a BTCC race in April 2006. The circuit currently has a curfew of 18:30 due to a housing estate built near to Clearways bend. Race engines cannot be started until after 08:30 and must be turned off by 18:30. Despite this, Brands Hatch holds race meetings on almost every weekend during the motorsport season, ranging from small club series to major international races attracting up to 50,000 spectators.
In 2010, an extra dock platform for terminating City via Bankstown trains was opened. This was built as part of the CityRail Clearways Project which was intended to untangle the various lines and make the network simpler to operate. In conjunction with a companion project at Homebush, operation of the Bankstown line was separated from the Inner West & Leppington Line in October 2013. The changes resulted in the discontinuation of almost all trains to Liverpool via Regents Park prompting a community campaign to reinstate lost services.
In the October 2013 timetable, these two clearways were merged to create the Airport, Inner West & South Line. Differences from the original plan include via-Revesby and via-Granville trains sharing tracks between Glenfield and Macarthur, and all-stations and express trains via-Revesby sharing tracks between Revesby and Central. Most trains from Macarthur via Revesby use the local (pre-existing) tracks between Revesby and Wolli Creek, and make a number of stops along the route. These trains approach the City via the Airport.
This placed the line last among all train lines in the Opal network. Various modification schemes to revitalise the line had been proposed. Action for Transport 2010, a New South Wales Government plan released in 1998, included the Parramatta Rail Link; a heavy rail line from Parramatta to Chatswood that would have utilised the Carlingford line between Camellia and Carlingford. As part of the CityRail Clearways Project announced in 2004, a passing loop was to have been built at Rydalmere, enabling a more frequent service.
In New Zealand, a clearway is section of road on which it is illegal to stop for any reason other than a breakdown or an obstruction to the road such as stationary traffic. Clearways may operate at all times or for limited times such as peak traffic flow times. As such, they operate in a similar way to those in the United Kingdom. Sign for a clearway in the UK. The plate under the sign indicates that the clearway restrictions do not apply beyond this point.
The design of the station allowed large crowds to move quickly in and out of the trains and off the platform. A good siding closed in 1949. The Cronulla line was constructed as an electrified railway line, and was the first major use of a miniaturised relay locking system using electrical relays for electric light signalling for sections of the line (known as the electro- pneumatic system). Under the Rail Clearways Program, the two remaining single track sections of the Cronulla line were duplicated in 2010.
Bondi Junction had originally been intended only as an intermediate turnback station before the extension to Kingsford was abandoned. In 1990 the land set aside for this extension in Randwick and Kingsford was sold."Sales On and Off" Railway Digest December 1989 page 402 As part of the Rail Clearways Program, the $77 million Bondi Junction Turnback project saw a new rail crossover built between the single-track tunnels, enabling 20 trains an hour, up from 14, to use the station.Transport Infrastructure Development Corporation, "Bondi Junction Turnback: Project Profile".
Initially electric trains operated as 2-car shuttles between Riverstone to Richmond until the electric power supply was upgraded to allow through running to and from Sydney in 1992. In 2002 the track between Marayong and Quakers Hill was duplicated.The history of Marayong, Blacktown City Council Two further duplications were announced as part of the Rail Clearways Program - from Quakers Hill to Schofields and from Schofields to Vineyard. These provide extra capacity to support increased patronage, as the line passes through the middle of Sydney's "North West Growth Centre".
During the CityRail era, the Airport & East Hills Line was through-routed with the South Line, and the Inner West Line formed a loop with the Bankstown Line. A substantial change introduced by the 2013 timetable was the abolition of Bankstown loop services and most Liverpool via Regents Park services. These changes were made possible by Rail Clearways projects to construct new turnbacks at Homebush and Lidcombe. This allowed the operation of the Inner West and Bankstown lines to be separated, freeing up capacity between Lidcombe and Homebush for use by other services.
A new timetable released in October 2013 broke the loop between the two lines. As part of the Rail Clearways Program, new turnbacks were constructed at Lidcombe and Homebush to allow the separation of both lines and increase their reliability and frequency. Services were also changed to operate mostly around the City Circle via Town Hall on weekdays (rather than via Museum). The line was depicted in a brown colour in the early 1990s NSWrail map 1992 before being changed to a purple colour around 2000, Sydney Suburban Network map, 2000 before it became the current orange colour.
In the mid-2000s, the Government of New South Wales suffered heavy criticism for its perceived mishandling of the Sydney rail network, which had very poor on-time performance following the January 2003 Waterfall train disaster. The safety regime introduced after this crash required drivers to stick to the speed limit, which often caused delays due to the expectations of the timetable for higher speeds. A slower timetable was introduced in September 2005, which significantly improving on-time running of services.Yearly On-Time Running CityRail 2007 The Clearways Programme was intended as the next step in improving the network.
In 1992 the steel footbridge was replaced by the present pre-cast concrete bridge having part replica steel lattice balustrades imitating the original wrought iron lattice girder design. On 9 October 1994, a large fire destroyed the original heritage-listed buildings on platforms 3 and 4, they were later rebuilt as s a similar awning structure. During the Sydney 2000 Olympics, the station was closed to avoid confusion with the nearby Olympic Park station. Under the Rail Clearways Program, an additional platform (Platform 7) was built to the south, with tracks rearranged to create a turnback at platform 6.
The track then loops around the woodland with a series of mid-speed corners, most notably the dip at Westfield and Dingle Dell and the blind Sheene curve. From there the track then emerges from the left hand and cambered Stirlings Bend onto the short straight to Clearways and rejoins the Indy Circuit for Clark Curve with its uphill off-camber approach to the pit straight and the start/finish line. The British Rallycross Circuit at Brands Hatch was designed and constructed by four-times British Rallycross Champion Trevor Hopkins. It is approximately 0.9 miles long and was completed around 1981.
Less than 5% of the Common is within spurs of the common in Churt to the south or Tilford to the north. Four prehistoric bowl barrows are in a straight line in the centre-east of the common.Scheduled Ancient Monuments Three bowl barrows on Frensham Common Bowl barrow on Frensham Common Villagers termed these the King's Ridge Barrows. Megalithic During recent hot weather large numbers of visitors flocked to Frensham Common, particularly Frensham Great Pond, causing an anti- social parking problem with cars parked on rural clearways, double yellow lines and also leaving behind large amounts of rubbish.
Brabham was about to hold off the onrushing Rindt (the eventual 1970 F1 champion) when his front wheels locked in a skid on the sharp right turn only yards from the finish and he ended up second. While leading at the British Grand Prix at Brands Hatch, he ran out of fuel at Clearways and Rindt passed him to take the win while Brabham coasted to the finish in second place. After the 13th and final race of the season, the Mexican Grand Prix, Brabham did retire. He had tied Jackie Stewart for fifth in the points standings in the season he drove at the age of 44.
"Signalling & Safeworking" Railway Digest April 1984 page 126 This allowed suburban services to terminate, and from January 1992, Berowra became the northern boundary of the Sydney suburban network replacing Cowan."CityRail launches new timetable" Railway Digest February 1992 page 45 On 28 August 2006, Platform 3 opened on the passing loop as part of the Rail Clearways Program, to allow suburban trains to terminate clear of the running lines. Trains now terminate on the middle Platform 2, allowing through trains to overtake any terminating trains standing in the station. The upgrade also included provision of lifts, a new over-rail bridge for general station access and additional wet weather protection.
"Signalling & Safeworking" Railway Digest April 1986 page 119 The line from Kingsgrove to Revesby was duplicated around the same time."The East Hills to Glenfield Line" Railway Digest August 1986 pages 234-235 The Rail Clearways Program saw the station's role change significantly, with plans to considerably boost capacity of the East Hills line by creating two centre turnbacks at the station to replace a side turnback at East Hills, and quadruplicating the line from Kingsgrove to Revesby. In 2006, construction commenced on a second island platform and a replacement footbridge. Platform 3 opened in December 2008, as the main platform to the west.
Example of a TSS on a chart A traffic separation scheme or TSS is a maritime traffic-management route-system ruled by the International Maritime Organization or IMO. The traffic-lanes (or clearways) indicate the general direction of the ships in that zone; ships navigating within a TSS all sail in the same direction or they cross the lane in an angle as close to 90 degrees as possible. TSSs are used to regulate the traffic at busy, confined waterways or around capes. Within a TSS there is normally at least one traffic-lane in each main-direction, turning-points, deep-water lanes and separation zones between the main traffic lanes.
Pennant Hills and Thornleigh, Up Loop 1000m, Down Loop 400m In addition to the two main tracks, there is an extra Down (northbound) line from North Strathfield to Rhodes and a disused extra Up (southbound) track from Concord West to North Strathfield. Between West Ryde and Epping there is a quadruplicated section of track. Between Pennant Hills and Thornleigh there are two loops, but these are too short to accommodate 1,500 metre trains. As part of the Rail Clearways Program in August 2006 an additional platform was opened at Berowra,A new platform for Berowra Station from Monday 28 August CityRail 22 August 2006 and in March 2009 an additional platform and passing loop was opened at Hornsby.
Also involved was Gartner who tried to avoid the crash and ended up in the tire barrier. The race went on, with Prost passing Piquet at the fearsome Paddock Hill bend; but this ended up not mattering because before the end of the lap, Jonathan Palmer had crashed the second RAM heavily at Clearways when the suspension failed. The car was parked beside the track and it was then decided that if it was left there, it could become a launch pad if another car went off the circuit. The race was stopped, and this meant that at the restart Piquet was on pole again as the order was based on the end of the 11th lap- much to the annoyance of Prost.
He made a poor start before a long- running battle with Tom Onslow-Cole, which ended in a big collision eliminating Jones. The team ran a SEAT León full-time in 2008 and Jones took a third and a fourth in round 2 at Rockingham, and another podium in round 5 at Croft. In the Independents Trophy he has been among the first 3 finishers in 11 of those 15 races, giving him the class lead – aided by many races having intermediate wet-dry conditions which did not suit the BMWs of his leading rivals Turkington and Mat Jackson. His season ended with a lucky escape at Brands Hatch, as his car speared off the track at Clearways, narrowly missing armco posts which had been bent by a huge crash involving John George earlier in the race.
After a quiet first start with turbo power, Nigel Mansell ended his race with handling difficulties two laps later. On lap seven, Arnoux, who had been passed for the lead by Rosberg going into Surtees, pitted for new tyres, his Ferrari wearing its rubber extremely quickly despite cool ambient temperatures (Arnoux also had major tyre troubles in practice and was lucky not to damage the car after blowing a rear tyre at speed on the run to Clearways). By lap 23 and two further stops, his team had no further sets of tyres and he was forced to retire with camshaft trouble, although he had set the fastest lap of the race as consolation, though his lap of 1:17.826 in the flat bottomed Ferrari was 5.458 seconds shy of Didier Pironi's lap record of 1:12.368 set at the 1980 British Grand Prix in a ground effects Ligier-Ford. Watson retired with a bad driveline vibration, while Rebaque retired with tyre and suspension failure in a car he wasn't totally comfortable with.

No results under this filter, show 56 sentences.

Copyright © 2024 RandomSentenceGen.com All rights reserved.