Sentences Generator
And
Your saved sentences

No sentences have been saved yet

"acceleration lane" Definitions
  1. a speed change area or lane consisting of added pavement at the edge of through traffic lanes to permit vehicles to accelerate before merging with the through-traffic flow— compare DECELERATION LANE
"acceleration lane" Synonyms

9 Sentences With "acceleration lane"

How to use acceleration lane in a sentence? Find typical usage patterns (collocations)/phrases/context for "acceleration lane" and check conjugation/comparative form for "acceleration lane". Mastering all the usages of "acceleration lane" from sentence examples published by news publications.

Other upgrades, such as an acceleration lane from Stewartstown Road, and a new left-turn lane onto Stewartstown Road were also added, alone with new stoplights to accommodate the new Suncrest Towne Center.
The length of the braking test track at the Aldenhoven Testing Center is 150 m, which contains an asphalt and a ceramic pavement lane. Both lanes are 4 m wide and may be wetted as preferred. The braking test lane is surrounded on both sides by a safety zone. A 200 m access acceleration lane is also part of the braking test track.
The braking test track under construction at the Zala ZONE Vehicle Industry Test Track is designed for testing ABS, ATC and ESP systems; it has six special, differently paved and lanes, which can be wetted separately by the inbuilt wetting and draining system. Its 700 m acceleration lane and 200 m long braking surface enables the testing of longer combination vehicles as well.
The entrance ramp acceleration lane and the exit ramp deceleration lanes were lengthened to form a continuous lane between both ramps. The 12-foot shoulder lane can carry emergency vehicles and can be used in emergency situations. This project was completed in December 2011. The Orange Line and the Silver Line of the Washington Metro operate in the median of the highway in Fairfax and Arlington counties.
This way it becomes possible to test the braking systems of trucks and buses. An adequate amount of data and test results are necessary to draw the conclusions, which can be achieved by repeated tests. In order to perform repeated tests fluently and safely it is necessary to design a route separated from the test (braking) zone that allows the test vehicle to return to the beginning of the acceleration lane quickly and safely.
The 300 m long braking test track of the Papenburg Test Ground provides testing opportunities on eight lanes differing in quality and grip, which can be wetted as preferred; furthermore which are connected through a 280 long and 30 m wide acceleration lane to the oval platform, thus enabling acceleration to higher speeds. The braking test track is closed with a 150 m long asphalt safety surface. Available lanes: chequered lane, asphalt (100 m aquaplaning lane), mixed basalt & asphalt, basalt (polished), asphalt, concrete, “blue asphalt”.
Motorists sometimes cite discomfort due to the speed differential, a known cause of accidents, though conflicts could be reduced through the provision of an adequate acceleration lane and merge area. The Accokeek, MD CFI also has notable inequalities in traffic flow depending upon the direction of travel. This type of intersection can require a significant amount of right-of-way to implement (dependent upon the configuration), which is why the technique is not frequently used in urban areas. However, the amount of right-of-way necessary for construction and final operation is still typically less than that of an interchange.
The Larpenteur Avenue/East Hennepin Avenue interchange in Lauderdale was reconstructed in 2009 to eliminate the tight, no-acceleration-lane ramps. The intersection at County Road B was also closed permanently in 2009, as were the unsignaled intersections at Roselawn Avenue and Walnut Street. With construction completed in December 2009, the signal at Broadway Street was modified to allow left turns from northbound 280, thus maintaining a stoplight for southbound 280 only, but Broadway Street traffic can now only turn right (south). Thus, 280 is now in a sense a northbound freeway only, with a single stoplight for southbound traffic.
The route crosses the Rocky Gorge Reservoir and enters Howard County just beyond the northern end of the bypass. It intersects Old Columbia Road just beyond the reservoir and then upgrades into a six-lane grade-separated almost-freeway within its interchange with MD 216 at Scaggsville. Continuing as an almost-freeway it interchanges with Johns Hopkins Road after two miles (3 km), then downgrades to four lanes again just before the Middle Patuxent River and intersects Rivers Edge Road at a half- signalled intersection (Rivers Edge Road, which is the sole entryway into a subdivision containing over 300 homes, intersects the southbound carriageway, which has the signals; the northbound carriageway has a signalled turn lane and an unsignalled acceleration lane, both within the median). View north towards the northern terminus of US 29 at MD 99 just north of I-70 in Ellicott City Next, US 29 encounters MD 32 at a symmetrical cloverleaf; for an extended period this interchange marked the southern end of US 29's grade separation, with the entire route south of there being an at-grade expressway.

No results under this filter, show 9 sentences.

Copyright © 2024 RandomSentenceGen.com All rights reserved.